Northlake 635(3)-LR 980103WATER INJECTION OBSERVATION
Client No.: 52617000 Report No.: 9801
Client: Lincoln Property Company Date of Service: 01/0
Project: Coppell Business Center II General Contractor: Butl
Belt Line Rd. & Lakeshore Dr. Injector: Kenn
43-2452-97
Building B
Project No.:
Location:
Procedure:
On 01/03/98, a representative of HBC Engineering, Inc. observe~
of water at this site.
recorded:
During the injection process, the following
Pass No.: 4th No. of Probe
4747 Irvi~ Boulevard, Suite 20~
I~11., T~ 75247
149
/98
Construction
~th Moore, Inc.
the injection of
,bservations were
4 Probe Length .0.5 feet
OBSE~RVATION
SPECIFICATION Yes No NIA
Surfactant added to each load. X
_ Injection pressure 50 to 200 psi at manifold. X
_ Injection downward in 18 inch intervals. X
Total depth of injection was 10 feet. X
Spacing of injection was 5 feet maximum. X
Iniection to refusal at each location. X
Comments:
Technician: K. White
Report Distribution:
(1) Lincoln Property Company
(1) Butler Construction
(1) O'Brien & Associates
(1) AECC, Inc.
403ss
Started: 7:00 am Stopped: 5:30 pm
(1) City of Coppell/Bldg. Insp.
(1) City of Coppell/Constr. Insp.
P;
This report is exclusively for the use of the client indicated above and shall nol be repnxluced except in ~11 with~JI the written apflrovl
~ Engineering, Inc.
tul D. Smith, P.E.
I~ HBCEngineering, lnc,
~)B-22
1~,B_19
I
%
B-26
BUILDING D
~B-21
B-2~
EI-20{~[
B-16
BUILDING C
JI~B-17 ~e-~4
B-13
LAKESHORE DRIVE
8-12
~ B-4
~1 B-2
BUILDING
B-3
NOTE : BORING LOCATIONS ARE APPROXIMATE
HDC Pro.iec', Nc..
BORING LOCATION DIAGRAM
COPPELL BUSINESS CENTER II
COPPELL, TEXAS
J~pp~r No.-q~Oll~q
0 IOO 200 FEET
&PPROXIMATE SCALE
Dale. 10/3!/9.-.