Loading...
Northlake 635(3)-LR 980108WATER INJECTION OBSERVATION Client No.: Client: Project: Project No.: Location: Procedure: 52617000 Lincoln Property Company Coppell Business Center II Belt Line Rd. & Lakeshore Dr. 43 -2452-97 Building C Report No.: 9801 Date of Service: 01/0f General Contractor: Buth Injector: Kenl On 01/08/98, a representative of HBC Engineering, Inc. observed of water at this site. During the injection process, the following e recorded: Pass No.: 6th No. of Probe 4 Probe Length 4747 Irvin8 Boulevard, Suite 206 Dallas, Texas 75247 ;18 /98 Construction ~,th Moore, Inc. the injection of bservations were 0.5 feet OBSE~RVATION SPECIFICATION Yes No NIA Surfactant added to each load. X _ Injection pressure 50 to 200 psi at manifold. X Injection downward in 18 inch intervals. X Total depth of injection was 10 feet. X Spacing of injection was 5 feet maximum. X In, iection to refusal at each location. X Comments: Injection rig was stuck for 2 hours and was informed to only inject three qua~ Technician: K. White Started: See Report #9801517 Report Distribution: (1) Lincoln Property Company (1) Butler Construction (1) O'Brien & Associates (1) AECC, Inc. 403ss (1) City of Coppell/Bldg. Insp. (1) City of Coppell/Constr. Insp. PI This repot[ is excJu$ively fo~' the use of the cJient indicated above and shell not be reproduced excep4 in full wilhout Ihe writlen aplxow ers of the pad. ~ Engineering, Inc. tul D~ S~mith, P.E. ~1 o~ HBC Engineering, Inc. / LAKESHORE DRIVE r , ~d 8-9 B-lO BUILDING D ~B-22 ~B-21 B-8 $.-7 G BUILDING B ~ B-6 B-r~ ~B-19 I B-20~ 0 B-16 BUILDING C 8-13 B-14 B-12 B-3 B-2 BUILDING A 8-1 NOTE : BORING LOCATIONS ARE APPROXIMATE BORING LOCATION DIAGRAM COPPELL BUSINESS CENTER II COPPELL, TEXAS o I GO 200 FEET APPP_OX!~TE H.~C =role=' Nc. "2-227',-=-