Loading...
Northlake 635(3)-LR 980129'IN-PLACE DENSITY ?' STING Date of Service: 01/26/1998 Client No.: 52617000 Client: Lincoln Property Company 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 Services: In-place density testing. CONTRACTOR: Butler Construction MOISTURE DENSITY RELATIONS: Report No.: 9802955 Project No.: 43-2452. Project: Coppell Belt Lin Coppell, PROJECT DATA Laboratory Test Method: Field Test Method: Maximum ENGINF. ERllX~, INC. 4747 Irving Blvd., Suite/t206 Dallas, Texas 75247 M/D No. Description Moisture % Density pcf Med brn silty clay w/organics 23.5 99.0 -. FIELD DENSITY TESTS TEST M/D MOISTURE NO ~ TEST LOCATION No. (%) ASTM ASTM ASTM Building C 192 NW comer, 90' south & 50' east, Final lift I 26.7 193 NW corner, 90' south & 100' east, Final lift 1 27.1 194 NW comer, 90' south & 250' east, Final lift 1 27.4 195 NW corner, 90' south & 350' east, Final lift 1 27.1 196 NW corner, 200' south & 400' east, Final lift 1 26.9 197 NW corner, 200' south & 300' east, Final lift I 26.6 198 NW corner, 200' south & 200' east, Final lift 1 26.9 199 NW corner, 200' south & 100' east, Final lift 1 27.1 200 NW corner, 300' south & 10' east, Final lift 1 27.3 201 NW corner, 300' south & 110' east, Final lift 1 27.0 202 NW corner, 300' south & 220' east, Final lift I 27.5 203 NW corner, 300' south & 340' east, Final lift 1 26.9 97 Report Date 01/29/1998 3usiness Center II : Rd. & Lakeshore Dr. Texas D-698 D-2922 D-3017 Project Requirements This report is exclusively for thc use of the client indicated above and shall not be reproduced except in full without the wri, Moisture N lin. +3% DRY DENSITY (pcO Density 92% DENSITY (% max) 92.7 94 92.3 93 91.8 93 92.0 93 91.7 93 92.2 93 92.5 93 92.2 93 92.0 93 91.8 93 92.0 93 91.7 93 ten approval of HBC Engineering, Inc. 07SS Page I of 2 · Report No.: 9802955 TEST NO TEST LOCATION 204 205 NW corner 206 NW corner 207 NW corner 208 NW corner 209 NW corner 210 NW corner 211 NW corner NW corner 400' south & 360' east, Final lift 400' south & 260' east, Final lift 400' south & 160' east, Final lift 400' south & 60' east, Final lift 500' south & 70' east, Final lift 500' south & 170' east, Final lift 500' south & 270' east, Final lift 500' south & 370' east, Final lift M/D No. MOISTURE (%) I 26.7 1 27.5 I 27.1 I 27.2 I 26.9 1 27.3 I 27.8 1 27.4 DRY DENSITY (pc0 Test results on this report meet project specification. DENSITY (% max) 92.2 93 92.2 93 92.7 94 92.0 93 92.5 93 92.7 94 92.0 93 93.4 94 Technician: Tex King Report Distribution: (l) Lincoln Property Company (1} Butler Construction (l) O'Brien & Associates (1) AECC, Inc. (1) City ofCoppell/Bldg, lnsp. (I) City of Coppell/Constr. Insp. HtE~ng, Inc. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the writl 07SS Page 2 of 2 Pa~ Il D. Smith, P.E. SeN ior Project Engineer ~-n approval of HBC Engineering, Inc.