Loading...
Northlake 635(3)-LR 980204;IN-PLACE DENSITY e" STING Date of Service: Client No.: Client: Services: 01/28/1998 52617000 Lincoln Property Company 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 In-place density testing. CONTRACTOR: Butler Construction MOISTURE DENSITY RELATIONS: M/D No. 1 Report No.: 9803163 Project No.: 43-2452- Project: Coppell Belt Lin, Coppell, 07SS PROJECT DATA Laboratory Test Method: Field Test Method: Maximum Description Moisture % Density pcf Light gray, reddish and medium 23.5 98.5 brown shaley clay FIELD DENSITY TESTS ASTM ASTM ASTM TEST M/D MOISTURE NO TEST LOCATION No. (%) ENGINEERIM3, INC. 4747 Irving Blvd., Suite #206 Dallas, Texas 75247 97 Report Date 02/04/1998 3usiness Center II Rd. & Lakeshore Dr. Texas D-698 D-2922 D-3017 Project Requirements Utility, Storm Sewer 213 Line A at station 1 +20, 4th lift 1 25.4 214 Line A at station 1+21, 1' down I 25.1 215 Line A at station 1+22, 2' down 1 25.3 216 Line A at station 1+23, 3' down 1 25.5 217 Line A at station 2+50, Final lift 1 24.9 218 Line A at station 2+51, 1' down 1 25.1 219 Line A at station 2+52, 2' down 1 25.0 220 Line A at station 2+53, 3' down 1 25.3 221 Line A at station 4+00, Final lift 1 24.6 222 Line A at station 4+01, 1' down 1 24.9 223 Line A at station 4+02, 2' down 1 25.3 Moisture .1/+3% DRY DENSITY (pc0 Density This report is exclusively for thc usc &thc client indicated above and shall not bc reproduced except in full without thc wri{ Page I of 3 95% DENSITY (% max) 95.4 97 95.6 97 95.3 97 95.2 97 95.6 97 95.5 97 95.8 97 95.4 97 95.1 97 95.6 97 94.9 96 en approval of HBC Engineering, Inc. · Report No.: 9803163 TEST M/D MOISTURE NO TEST LOCATION No. (%) 224 225 226 227 228 229 230 231 232 233 234 235 236 237 238 239 240 241 242 243 244 245 246 247 248 249 250 251 252 253 254 255 256 Line A at station 4+03, 3' down Line A at station 5+50, Final lift Line A at station 5+51, 1' down Line A at station 5+52, 2' down Line A at station 5+53, 3' down Line C at station 1+10, Final lift Line C at station,l+l 1, 1' down Line C at station 1+12 2' down Line C at station 1+13 3' down Line C at station 2+60 Final lift Line C at station 2+61 1' down Line C at station 2+62 2' down Line C at station 2+63 3' down Line D at station 1+00 Final lift Line D at station 1+01 1' down Line D at station 1+02.2' down Line D at station 1+03.3' down Line D at station 2+50, Final lift Line D at station 2+51, 1' down Line D at station 2+52, 2' down Line D at station 2+53, 3' down Line D at station 4+01, Final lift Line D at station 4+02, 1' down Line D at station 4+03, 2' down Line D at station 4+04, 3' down Line D at station 5+50, Final lift Line D at station 5+51, 1' down Line D at station 5+52, 2' down Line D at station 5+53, 3' down Line D at station 7+00, Final lift Line D at station 7+01, 1' down Line D at station 7+02, 2' down Line D at station 7+03, 3' down Sanitary I 25.1 I 24.9 1 25.0 I 25.1 I 24.9 1 25.4 1 25.5 1 25.3 1 25.7 1 24.3 1 24.7 1 24.6 1 25.0 I 25.3 1 24.9 I 25.1 1 25.3 I 25.6 1 25.4 1 25.5 1 25.5 1 26.1 1 25.7 1 25.4 I 25.6 1 24.9 I 25.1 1 25.3 1 25.6 1 24.3 1 24.7 1 24.6 1 25.1 07SS 257 Line A at station 1+50, Final lift 1 24.6 258 Line A at station 1+52, 1' down 1 24.7 259 Line A at station 1+53, 2' down I 24.2 260 Line A at station 1+54, 3' down 1 24.9 261 Line A at station 1+55, 4' down 1 25.6 262 Line A at station 1+56, 5' down 1 25.3 263 Line A at station 3+00, Final lift 1 24.9 264 Line A at station 3+01, 1' down 1 24.7 265 Line A at station 3+02, 2' down 1 24.7 266 Line A at station 3+03, 3' down 1 24.8 267 Line A at station 3+04, 4' down 1 24.3 268 Line A at station 3+05, 5' down 1 24.6 DRY DENSITY DENSITY (pcO (% max) This report is exclusively for thc usc of thc client indicated above and shall not be reproduced except in full without ~hc wril Page 2 of 3 95.2 97 95.1 97 95.6 97 96.1 98 95.4 97 95.8 97 96.2 98 95.8 97 96.1 98 96.0 98 95.1 97 95.4 97 95.4 97 95.6 97 95.5 97 96.1 98 95.8 97 95.4 97 95.6 97 95.2 97 95.4 97 95.6 97 95.8 97 95.4 97 95.6 97 95.9 97 96.1 98 95.8 97 95.6 97 95.5 97 94.9 96 95.6 97 95.5 97 96.2 98 96.4 98 95.4 97 95.8 97 95.9 97 96.1 98 96.3 98 95.8 97 96.1 98 95.8 97 96.3 98 96.0 98 ten approval of HBC Engineering, Inc. Report No.: TEST NO 269 Line A 270 Line A 271 Line A 272 Line A 273 Line A 274 Line A 275 Line A 276 Line A 277 Line A 278 Line A 279 Line A 280 Line A 281 Line A 282 Line A 283 Line A 284 Line A 285 Line A 286 Line A Technician: Tex King Report Distribution: (1) Lincoln Property Company (1) Butler Construction (1) O'Brien & Associates (I) AECC, Inc. 07SS 9803163 ~ M/D MOISTURE No. (%) TEST LOCATION 25.1 25.3 24.9 25.1 25.4 25.2 24.7 24.8 24.6 24.7 24.9 24.6 25.3 25.7 25.4 25.5 24.9 25.4 at station 4+50, Final lift at station 4+52, 1' down at station 4+53, 2' down at station 4+55, 3' down at station 4+56, 4' down at station 4+57, 5' down at station 6+01, Final lift at station 6+02, 1' down at station 6+03, 2' down at station 6+04, 3' down at station 6+05, 4' down at station 6+06, 5' down at station 7+50, Final lit at station 7+51, 1' down at station 7+52, 2' down at station 7+53, 3' down at station 7+54, 4' down at station 7+55, 5' down Test This report is exclusively for thc use of thc client ir ~sults on this report meet project specification. (I) ( ity ofCoppell/Bldg. Insp. (I) City ofCoppell/Constr, lnsp. Pal Sen DRY DENSITY (PCO En(~g, Inc. d D. Smith, P.E. ior Project Engineer dieated above and shall not be reproduced except in full without the writt Page 3 of 3 DENSITY (% max) 95.4 97 95.2 97 95.6 97 95.4 97 95.3 97 95.4 97 95.8 97 96.1 98 96.4 98 95.8 97 95.6 97 96.2 98 95.2 97 95.4 97 95.2 97 95.3 97 95.6 97 95.4 97 m approval of HBC Engineering Inc.