Northlake 635(3)-LR 980204 (2) IN-PLACE DENSITY e'" STING
Date of Service:
Client No.:
Client:
Services:
01/29/1998
52617000
Lincoln Property Company
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
In-place density testing.
CONTRACTOR: Butler Construction
MOISTURE DENSITY RELATIONS:
M/D No. Description
1 Light gray, reddish & medium
TEST
NO TEST LOCATION
East Sanitary Lateral To Main
287 25' south of junction, 5th lift
288 25' south of junction, 4th lift
289 25' south of junction, 3rd lift
290 25' south of junction, 2nd lift
291 25' south of junction, 1st lift
West Lateral, Sanitary
292 30' south of main line, 6th lift
293 30' south of main line, 5th lift
294 30' south of main line, 4th lift
295 30' south of main line, 3rd lift
296 30' south of main line, 2nd lift
297 30' south of main line, 1st lift
Report No.: 9803244
Project No.: 43-2452.
Project: Coppell
Belt Linl
Coppell,
PROJECT DATA
Laboratory Test Method: ASTM
Field Test Method:
ASTM
ASTM
Maximum
Moisture % Density pcf
23.5 98.5
FIELD DENSITY TESTS
M/D MOISTURE
No. (%)
1 25.6
I 25.4
1 25.5
1 24.9
I 24.6
1 24.9
1 25.0
1 24.7
1 25.1
1 25.6
1 25.3
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the wril
ENGINEERII~, INC.
4747 Irving Blvd., Suite #206
Dallas, Texas 75247
Report Date
02/04/1998
¸97
Business Center II
; Rd. & Lakeshore Dr.
Texas
D-698
D-2922
D-3017
Project Requirements
Moisture Density
-1/+3% 95%
DRY DENSITY DENSITY
(pcO (% max)
95.6 97
95.8 97
95.7 97
96.1 98
96.4 98
95.7 97
95.4 97
95.8 97
96.1 98
95.4 97
95.1 97
Ien approval of HBC Engineering, Inc.
07SS Page I of 2
Report No.: 9803244
Utilities.
Test results on this report meet project specification.
Technician: Tcx King
Report Distribution:
(1) Lincoln Property Company
(1) Butler Construction
(1) O'Brien & Associates
(1) AECC, Inc.
(I) City of Coppell/Bldg. In~p.
(1) City of Coppell/Constr. lnzp.
This report is exclusively for thc usc of thc client indicated above and shall not bc reproduced except in full without the writ~
~pa ~mg, Inc.
11~. Smlth, P.E.
Set ior Project Engineer
en approval of HBC Engineering, Inc.
07SS Page 2 of 2