Loading...
Northlake 635(3)-LR 980217'IN-PLACE DENSITY /"2STING Date of Service: Client No.: Client: Services: 02/05/1998 52617000 Lincoln Property Company 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 In-place density testing. CONTRACTOR: Butler Construction MOISTURE DENSITY RELATIONS: M/l) No. 1 Tan limestone TEST NO Report No.: 9803831 Project No.: 43-2452 Project: Coppell Belt Lin Coppell: PROJECT DATA Laboratory Test Method: 4747 Irving Blvd., Suite #206 Dallas, Texas 75247 Field Test Method: ASTlV ASTIv ASTIV Maximum Description Moisture % Density pcf 21.5 103.0 FIELD DENSITY TESTS M/D MOISTURE TEST LOCATION No. (%) Select, Southeast Corner 364 1st lift, 50' west and 100' north 1 21.9 365 1st lift, 50' west and 200' north 1 21.0 366 1st lift, 50' west and 300' north I 21.6 367 I st lift, 50' west and 400' north 1 21.7 368 1st lift, 100' west and 430' north 1 22.0 369 1st lift, 100' west and 320' north 1 21.9 370 1st lift, 100' west and 220' north I 21.5 371 1st lift, 100' west and 120' north 1 21.7 372 1st lift, 100' west and 20' north I 21.8 373 1st lift, 150' west and 100' north 1 21.7 374 1st lift, 150' west and 200' north 1 21.9 375 I st lift, 150' west and 300' north 1 22.3 .97 Report Date 02/17/1998 Business Center II e Rd. & Lakeshore Dr. Texas D-698 D-2922 D-3017 Project Requirements This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the w~ Moisture Density -2/+2% 95% DRY DENSITY DENSITY (PcO (% max) 101.0 98 101.1 98 101.7 99 101.6 99 100.8 98 101.2 98 101.6 99 101.2 98 101.4 98 101.6 99 102.1 99 101.6 99 ttcn approval of HBC Enginecring, Inc. 07SS Page I of 2 Report No.: 9803838 TEST M/D MOISTURE NO TEST LOCATION No. (%) 376 Technician: Tex King Report Distribution: (I) Lincoln Property Company (I} Butler Construction (I) O'Bricn & Associates (I) AECC, lnc. 1 st lift, 150' west and 400' north I 22.0 Test results on this report meet project specification. (1) City of Coppell/Bldg. lnsp. (1) City ofCoppell/Constr, lnsp. Pa S¢~ This report is exclusively fur thc usc of thc client indicated above and shall not be reproduced except in full without thc wri DRY DENSITY DENSITY (pc0 (% max) 101.7 99 Eng~g, Inc. al D. Smith, P.E. ~ior Project Engineer ~n approval of HBC Engineering, Inc. 07SS Page 2 of 2