Northlake 635(3)-LR 980217 (3)IN-PLACE DENSITY / STING
Date of Service:
Client No.:
Client:
02/11/1998
52617000
Lincoln Property Company
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Services: In-place density testing.
CONTRACTOR: Butler Construction
MOISTURE DENSITY RELATIONS:
M/D No. Description
1 Med bm silty clay w/organics
TEST
NO TEST LOCATION
Bldg B, N half, NWC
398 Subgrade prior to select, 50'E + 50'S
399 Subgrade prior to select, 50'E + 100'S
400 Subgrade prior to select, 50'E + 150'S
401 Subgrade prior to select, 50'E + 200'S
402 Subgrade prior to select, 150'E + 200'S
403 Subgrade prior to select, 150'E + 150'S
404 Subgrade prior to select, 150'E + 100'S
405 Subgrade prior to select, 150'E + 50'S
Technician: Tex King
Report Distribution:
(1) Lincoln Property Company
(1) Butler Construction
(1) O'Brien & Associates
(1) AECC, Inc.
Report No.: 9804828
Project No.: 43-2452-
Project: Coppell
Belt Lin,
Coppell,
PROJECT DATA
Laboratory T~t Method: ASTM
Field Test Method:
Maximum
Moisture % Density pcf
ASTM
ASTM
23.5 99.0
FIELD DENSITY TESTS
M/D MOISTURE
No. (%)
1 27.0
1 26.6
1 26.9
1 27.3
1 27.1
1 27.0
1 27.3
1 26.9
Test results on this report meet project specification.
97
ENGINEERING, INC.
4747 Irving Blvd., Suite #206
Dallas, Texas 75247
Report Date
02/17/1998
lusiness Center II
Rd. & Lakeshore Dr.
Texas
D-698
D-2922
D-3017
Project Requirement~
Moisture Density
+3% 92%
DRY DENSITY DENSITY
(pc0 (% max}
(1) City of Coppell/Bldg. Insp.
(1) City of Coppell/Constr. lnsp.
Pa
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the writ
07MP Page 1 of I
92.5 93
93.1 94
93.0 94
91.7 93
92.0 93
92.1 93
92.2 93
92.1 93
al D. Smith, P.E.
tior Project Engineer
:en approval of HBC Engineering, Inc.
Eng~e~g, Inc.