Loading...
Northlake 635(3)-LR 980217 (4)'REPORT OF DRILLEL PIER INSPECTION Date of Service: 02/11/1998 Client No.: 52617000 Client: Lincoln Property Company 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 Report No.: 9804773 Project No.: 43-2452. Project: Coppell Belt Lin Coppell, Services: Drilled pier inspection On this date, an HBC Engineering technician arrived at the above refE jobsite as scheduled for drilled pier inspection. See attached sheei recorded data. Technician time: 6:00 am to 12:00 pm 4747 Irving Blvd., Suite #206 Dallas, Texas 75247 97 Report Date 02/17/1998 3usiness Center II ', Rd. & Lakeshore Dr. Texas ~renced ;s for Technician: Del Ratliff Report Distribution: (!) Lincoln Property Company '(i) Butler Construction (!) O'Bricn & Associates (I) AECC, Inc. (1) City of Coppell/Bldg. lnsp. (1) City of Coppell/Constr. lnsp. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the wri Sen ior Project Engineer :n approval of HBC Engineering, Inc. 99MP Page 1 of 1 REPORT OF DRILLED BELLED PIERS 4747 Irving Boulevard, Suite 206 Dallas, Tex~ 75247 Project: Project No.: Pier Identification Pier Diameter (in.) Bell Diameter (in.) Top of Pier Elevation (fi) Req. Depth From Exist. Grade (fi) Initial Depth of Pier From Existing Grade (fi) Final Depth of Pier From Existing Grade (fi) Coppell Business Center II Belt Line Rd & Lakeshore Dr., Coppell, Texas 43-2452-97 Report No.: 9804773 Date of Service: 02/11/98 Technician: D. Ratliff Page: 1 of 3 J/5 24 54.0 95.6 16.0 15.6 1/5 24 54.0 95.6 16.0 15.4 PI6 24 54.0 95.6 16.0 16.0 O/6 24 54.0 95.6 16.0 15.9 N/6 24 54.0 95.6 16,0 15.8 MI6 24 54.0 95.6 16.0 15.9 K/6 24 95.6 16.0 15.7 J/6 24 54.0 95.6 16.0 16.0 I/6 24 H/5 24 Gl5 24 54.0 54.0 54.0 95.6 16.0 95.6 16.0 15.7 15.7 95.6 16.0 15.7 15.9 15,7 16.2 16.1 16.2 16.3 16.0 16.2 16.0 15.9 16.0 Depth From Top of Concrete (fl) 12.9 12,7 13.2 13,1 13,2 13.3 13.0 13.2 13.0 12.9 13.0 Condition of Bottom (wet or dry) Dry Dry Dry Dry Dry Dry Dry Plumb Within Tolerance (yes or no) Yes Yes Yes Yes Yes Yes Yes Casing Diameter (in) N/A N/A N/A N/A N/A N/A N/A Cased Depth (ft) , I~h~mhar nf %1.,,'.1.;,,...I I:le,.~ I,e,e, ~ N/A Dry Dry Yes Yes N/A N/A N/A N/A 6 6 6 N/A Dry Dry Yes Yes N/A N/A N/A N/A 6 6 N/A N/A N/A N/A N/A 5 6 ,?, C C, 6 6 Reinforcing Bar Size (#) 6 6 6 6 6 6 6 Length of Vertical Bars (ft.) 15.5 15.3 15.8 15.7 15.8 15.9 15.7 15.8 15.5 15.6 15.7 Time Drilling Was Completed 07:45 AM 08:00 AM 08:15 AM 08:30 AM 08:45 AM 09:00 AM 09:15 AM 09:25 AM 09:46 AM 08:15 AM 08:30 AM Time Concrete Was Placed 09:00 AM 09:10 AM 10:00 AM 10:10 AM 10:20 AM 10:40 AM 10:50 AM 09:50 AM 10:05 AM 09:30 AM 09:40 AM REPORT OF DRILLED BELLED PIERS Project: Project No.: Coppell Business Center II Belt Line Rd & Lakeshore Dr., Coppell, Texas 43-2452-97 Report No.: Date of Service: Technician: Page: 4747 Irwin8 Boulevard, Suite 206 Dall~, Tex~ 75247 9804773 02/11/98 D. Ratliff 2 of 3 Pier Identification Fl5 E/5 D/5 C/5 BI5 Gl2 Gl3 Gl4 H/6 Gl6 Fl6 Pier Diameter (in.) 24 24 24 24 24 24 24 24 24 24 24 Bell Diameter (in.) Top of Pier Elevation (ft) From Exist. Grade Initial Depth of Pier From Existing Final Depth of Pier From Existing Depth From Top of Concrete (ft) Condition of Bottom (wet or dry) Plumb Within Tolerance (yes or no) Casing Diameter (in) Cased Depth (ft) 54.0 54.0 54.0 54.0 54.0 54.0 54.0 54.0 54.0 54.0 54.0 95.6 95.6 95.6 95.6 95.6 95.6 95.6 95.6 95.6 95.6 95.6 16.0 15.9 16,0 16.0 16.0 16.0 16.0 16.0 16.0 16.0 16.0 16.0 15.6 15.5 15.8 15.7 15.5 15.5 15.7 15.8 16.0 15.9 15.8 16,0 16.0 15.8 16.0 16.1 16.1 16.1 15.6 16.0 16.3 13.0 13.3 12.9 12.8 13.0 13.0 12.8 13.0 13.1 13.1 13.1 Dry Dry Dry Dry Dry Dry Dry Dry Dry Dry Dry Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A Reinforcing Bar Size (#) Length of Vertical Bars (ff.) Time Drilling Was Completed Time Concrete Was Placed 6 6 6 6 6 6 6 6 6 6 6 15.3 15.5 15.7 15.5 15.1 15.5 15.7 15.6 15.6 15.5 15.7 08:50 AM 09:05 AM 09:20 AM 09:35 AM 09:50 AM 10:05 AM 10:20 AM 10:35 AM 09:45 AM 09:55 AM 11:15AM 09:45 AM 09:55 AM 10:10 AM 10:20 AM 10:32 AM 10:45 AM 11:45AM 12:10 PM 12:20 PM 12:35 PM 01:45 PM REPORT OF DRILLED BELLED PIERS Project: Project No.: Coppell Business Center II Belt Line Rd & Lakeshore Dr., Coppell, Texas 43-2452-97 Report No.: Date of Service: Technician: Page: 4747 Irving Boulevard, Suite 206 Dallas, Texas 75247 9804773 02/11/98 D. Ratliff 3 of 3 Pier Identification E/6 D/6 C/6 BI6 Pier Diameter (in.) 24 24 24 24 Bell Diameter (in.) 54.0 54.0 54.0 54.0 Top of Pier Elevation (ft) 95.6 95.6 95.6 95.6 From Exist. Grade (ft) Initial Depth of Pier From Existing Final Depth of Pier From Existing Depth From Top of Concrete (ft) 16.0 16.0 16.0 16.0 15.8 16.0 15.7 15.9 16.1 16.2 16.0 16.3 13.1 13.2 13.0 13.3 Condition of Bottom (wet or dry) Dry Dry Dry Dry Plumb Within Tolerance (yes or no) Yes Yes Yes Yes Casing Diameter (in) N/A N/A N/A N/A Cased Depth (fi) NIA N/A N/A N/A Reinforcing Bar Size (#) 6 6 6 6 Length of Vertical Bars (ft.) 15.7 15.8 15.5 15.7 Time Drilling Was Completed 10:10 AM 10:25 AM 10:40 AM 11:00 AM Time Concrete Was Placed 01:50 PM 02:10 PM 02:25 PM 03:45 PM