Northlake 635(3)-LR 980217 (5)'IN-PLACE DENSITY /" STING
Date of Service:
Client No.:
Client:
Services:
02/06/1998
52617000
Lincoln Property Company
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
In-place density testing.
CONTRACTOR: Butler Construction
MOISTURE DENSITY RELATIONS:
M/D No.
1 Tan limestone
Description
TEST
NO TEST LOCATION
Report No.: 9804402
Project No.: 43-2452
Project: Coppell
Belt Lin
Coppell,
4747 Irving Blvd., Suite #206
Dallas, Texas 75247
PROJECT DATA
Laboratory Test Method:
Field Te~t Method:
Maximum
ASTM
ASTM
ASTM
Moisture % Density pcf
21.5 103.0
FIELD DENSITY TESTS
M/D MOISTURE
No. (%)
-97
Report Date
02/17/1998
Business Center II
: Rd. & Lakeshore Dr.
Texas
D-698
D-2922
D-3017
Project Requirement~
Building A, Select
377 SW corner, 60' east & 100' north, 2nd lift 1 21.6
378 SW corner, 60' east & 200' north, 2nd lift 1 21.9
379 SW corner, 60' east & 300' north, 2nd lift 1 20.9
380 SW corner, 60' east & 400' north, 2nd lift 1 21.6
381 SW corner, 120' east & 430' north, 2nd lift 1 21.9
382 SW corner, 120' east & 330' north, 2nd lift 1 22.1
383 SW corner, 120' east & 230' north, 2nd lift 1 22.0
384 SW comer, 120' east & 130' north, 2nd lift 1 22.2
385 SW corner, 120' east & 30' north, 2nd lift 1 21.8
386 SW corner, 100' east & 40' north, 2nd lift 1 21.9
387 SW corner, 100' east & 140' north, 2nd lift 1 21.8
388 SW corner, 100' east & 240' north, 2nd lift 1 21.6
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without thc wri
Moisture Densily
-2~2% 95%
DRY DENSITY DENSITY
(PCO (% max)
101.6 99
101.4 98
101.7 99
102.1 99
101.9 99
I02.2 99
101.6 99
101.7 99
101.5 99
101.9 99
99.8 97
101.0 98
approval of HBC Engineering Inc.
07SS Page 1 of 2
Report No.: 9804402
TEST
NO
389
M/D MOISTURE
TEST LOCATION No. (%)
SW corner, 100' east & 390' north, 2nd lift I 21.9
Test results on this report meet project specification.
DRY DENSITY DENSITY
(pe0 (% max)
101.2 98
Technician: Tex King
Report Distribution:
(1) Lincoln Property Company
(I) Butler Construction
(I) O'Brien & Associates
(1) AECC, Inc.
(I) City of Coppell/Bldg. lnsp.
(I) City of Coppell/Constr. lnsp.
g, Inc.
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the wril
Pa ul D. Smith, P.E.
Scl dot Project Engineer
~en approval of HBC Engineering, Inc.
07SS Page 2 of 2