Northlake 635(3)-LR 980218 (3)IN-PLACE DENSITY " STING
Date of Service:
Client No.:
Client:
02/09/1998
52617000
Lincoln Property Company
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Services: In-place density testing.
Butler Construction
MOISTURE DENSITY RELATIONS:
M/D No. Description
1 Med brown silty cl w/organics
TEST
NO TEST LOCATION
Report No.: 9804601
Project No.: 43-2452
Project: Coppell
Belt Lin,
Coppell,
.97
4747 Irving Blvd., Suite #206
Dallas, Texas 75247
Report Date
02/18/1998
PROJECT DATA
Laboratory Test M~thod: ASTM
Field TestMethod:
Moisture % DenMty pcf
23.5 99.0
FIELD DENSITY TESTS
ASTM
ASTM
Building B, South Half
390 SE corner, 50' W & 50' N, Subgrade prior to select
391 SE corner, 50' W & 100'N, Subgrade prior to select
392 SE corner, 50' W & 150~N, Subgrade prior to select
393 SE corner, 50' W & 200~, Subgrade prior to select
394 SE corner, 150'W & 200~N, Subgrade prior to select
395 SE corner, 150'W & 150~N, Subgrade prior to select
396 SE corner, 150'W & 100~N, Subgrade prior to select
397 SE corner, 150'W & 50' N, Subgrade prior to select
Business Center II
: Rd. & Lakeshore Dr.
Texas
D-698
D-2922
D-3017
Project Requirements
Moisture Density
, MOISTURE
(%)
27.1
27.0
26.9
27.0.
27.3
27.1
27.0
27.6
fin. +3% 92%
DRY DENSITY DENSITY
(pc0 (% max)
92.2 93
92.0 93
92.5 93
92.4 93
92.2 93
92.5 93
92.4 93
92.6 94
Test results on this report meet project specification.
07SS
Technician: Tex King
Report Distribution:
(I) Lincoln Properly Company
(!) Butler Construction
(I) O'Brien & Associates
(I) AECC, inc.
(1) City of Coppell/Bldg. Insp.
( I ) City of Coppell/Constr. Imp.
This report is exclusively for thc use of the client indicated above and shall not be reproduced except in f~ll without the wri~
Page 1 of I
E~g, Inc.
.ul D. Smith, P.E.
aior Project Engineer
ten approval of HBC Engineering Inc.