Loading...
North Texas Mail-CS 890327 DATE REPLY ~ SIGNED SENDER ... RETAIN THIS COPY COPPELL PUBLIC WORKS February 15, 1989 ~0: Ru~e~oy~e, G~¢~ ~ng~eet ~RO~: S~e~e Gonad, 9~te~to~ o~ ~ub~ ~o~k~ ~o~¢a~ ~ac~Y ~o~ce ~a~ o~ ~e~e~ V~. A~tet~a~e ~ee~ott Go~e~o~ Russ, staff has discussed with Bob Minyard of Minyard Properties the possibility of the City accepting the existing sanitary sewer south along the railroad R.O.W. at the Minyard's Distribution Center. Staff's concern, which we have discussed, is the force main proposal and the tie in location at Freeport & Bethel Road. Staff believes the above alternative should be vigorously pursued which could provide, depending on grade elevations, a gravity flow from the Postal site east to Freeport. Additionally, if grades will allow, the extension of the line west could provide a sanitary connection for points beyond the Postal Facility. Attached are maps which help identify these locations. We would like to discuss this matter either at an upcoming DRC meeting or we can set up a meeting with representatives of the Postal Facility and/or Minyard's Properties. Please get back with me on this matter. Thanks. SGG/sm cc: Howard Pafford, Water Foreman Steven Morton, Chief Public Works Inspector attachments