Loading...
Northlake 635(8)-CS 991209 ~/ ,~'i Tr'e City v¥it,h A ~-~ -Jtiful F~tu,-e ( '~,/ ?:,/: :.: :..:...: ::.~ ..:(~."':~"':? )'x' : :°FE.__ -E' "-- -':" /;" ~' December 9, 1999 Pat Acker, P.E. HalffAssociates, Inc. 8616 Northwest Plaza Drive Dallas. TX 75225 RE: Northlake 635 Lot 21~ - %ck D (M~-.:,7ollister's Expansion) Fee Assessment 1..ette~ Dear Mr. Acker: Enclosed is a cop.,.' of the Citv ~. i'C;oppell De,-elopment Fee Assessment table, along with a cop.,,.' of the Development Fec alculations :'o,' the referenced development. Please make payment to the C';": of Coppe;._. m the amount of 54.134.00 and forward to the Finance Department along' ':'h a copy of the Fee Assessment table. This amount is a portion of the assessed fees tha eed to be [.';.id prior to Council approval. Also provide a copy of the Engineer's estima':t or contract to our office so the construction inspection fee can be verified. Providing a copy of your pa~d cccipt to i'~,c Engineering Department will help us to verify the payment of required ":"es and insure a successful beginning of this project, we look forward to working wit!..'on on lhi,. project. If you have any questions, please contact me. Sincerely. Kent M. Collins, P.E. Civil Engineer cc: Jennifer Am'~strong..Ei:': .',ce Direct:, Doug Stevens, Enginee' g Technic' m Glenn Hollowell, Ass~s~a,.~.t Director of Public \-Vorks Greg Jones. Chief Bu,;.-.'.. ~.~ Official Gap,' Sims. Director cf'. isure Serv,ces DEVELOPMENT FEE TABLE Project: Northlake 635 Lot 2R Block D (McCollister's Expansion) Date: 12/09/1999 TOTAL AMOUNT DUE FEES DUE PRIOR TO COU.,'NCIL APPROVAL Water Impact Fee S0.00 $0.00 (100% due prior to Council Approval) Water Tap Inspection Fee $0.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $0.00 (100%- due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) 5;0.00 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $0.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $0.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $0.00 $0.00 (100% due prior to Council Approval) Wastewater Tap Inspection Fee $0.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee S0.00 (100% due at Issuance of Building Permit) Park Fee $0.00 $0.00 (100%- due prior to Council Approval) Roadway Impact Fee $4,134.00 $4,134.00 (100% due prior to Council Approval) Street Light Fee Information not Available (100% due prior to Acceptance of Project I Street Sign Fee Information not Available (100%. due prior to Acceptance of Project Construction Inspection Fee Information not Available TOTAL $4,134.00 TOTAL AMOL.'NT DUE PRIOR TO COUNCIL APPROVAL $4,.134.00 ROADWAY IMPACT FEE CALCULATIONS PROJECT: Northlake 635 Lot 2R Block D (McCollister's Expansion) DATE: 12/09/1999 ROADWAY IMPACT FEE: Service Area * 10 Category ** Industrial 'Land Use ** General Light Industrial Building Area (st) 26,000 Development Units ** 26.00 Vehicle Miles per Development Unit ** 1.06 Fee per Vehicle Mile *** $300 Roadway Impact Fee due = (Development Units) x !(Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) = $8.268.00 * (Figure 2 - Roadway Impact Fee Study) ** (Table 3 - Roadway Impact Fee Study) *** (Schedule 2, Page 3 - Roadway Impact Fee Study) Percent of Credit Toward Roadway Impact Fees 50% Total Credit S4,134.00 [ . A3tO~i~r~VE,~.:~::-~-:.::- -:::~: S'*.~.3~:-o~:l