Northlake 635(8)-CS 991209 ~/ ,~'i Tr'e City v¥it,h A ~-~ -Jtiful F~tu,-e
( '~,/ ?:,/: :.: :..:...: ::.~
..:(~."':~"':? )'x' : :°FE.__ -E'
"-- -':" /;" ~' December 9, 1999
Pat Acker, P.E.
HalffAssociates, Inc.
8616 Northwest Plaza Drive
Dallas. TX 75225
RE: Northlake 635 Lot 21~ - %ck D (M~-.:,7ollister's Expansion)
Fee Assessment 1..ette~
Dear Mr. Acker:
Enclosed is a cop.,.' of the Citv ~. i'C;oppell De,-elopment Fee Assessment table, along with
a cop.,,.' of the Development Fec alculations :'o,' the referenced development.
Please make payment to the C';": of Coppe;._. m the amount of 54.134.00 and forward to
the Finance Department along' ':'h a copy of the Fee Assessment table. This amount is a
portion of the assessed fees tha eed to be [.';.id prior to Council approval. Also provide a
copy of the Engineer's estima':t or contract to our office so the construction inspection
fee can be verified.
Providing a copy of your pa~d cccipt to i'~,c Engineering Department will help us to
verify the payment of required ":"es and insure a successful beginning of this project, we
look forward to working wit!..'on on lhi,. project. If you have any questions, please
contact me.
Sincerely.
Kent M. Collins, P.E.
Civil Engineer
cc: Jennifer Am'~strong..Ei:': .',ce Direct:,
Doug Stevens, Enginee' g Technic' m
Glenn Hollowell, Ass~s~a,.~.t Director of Public \-Vorks
Greg Jones. Chief Bu,;.-.'.. ~.~ Official
Gap,' Sims. Director cf'. isure Serv,ces
DEVELOPMENT FEE TABLE
Project: Northlake 635 Lot 2R Block D (McCollister's Expansion)
Date: 12/09/1999
TOTAL AMOUNT DUE
FEES DUE PRIOR TO
COU.,'NCIL
APPROVAL
Water Impact Fee S0.00 $0.00
(100% due prior to Council Approval)
Water Tap Inspection Fee $0.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Domestic) $0.00
(100%- due at Issuance of Water Meter)
Water Meter Fee (Irrigation/Fireline) 5;0.00
(100% due at Issuance of Water Meter)
Water Meter Deposit (Domestic) $0.00
(100% due at Issuance of Water Meter)
Irrigation/Fireline Meter Deposit $0.00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee $0.00 $0.00
(100% due prior to Council Approval)
Wastewater Tap Inspection Fee $0.00
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee S0.00
(100% due at Issuance of Building Permit)
Park Fee $0.00 $0.00
(100%- due prior to Council Approval)
Roadway Impact Fee $4,134.00 $4,134.00
(100% due prior to Council Approval)
Street Light Fee Information not Available
(100% due prior to Acceptance of Project I
Street Sign Fee Information not Available
(100%. due prior to Acceptance of Project
Construction Inspection Fee Information not Available
TOTAL $4,134.00
TOTAL AMOL.'NT DUE PRIOR TO COUNCIL APPROVAL $4,.134.00
ROADWAY IMPACT FEE CALCULATIONS
PROJECT: Northlake 635 Lot 2R Block D (McCollister's Expansion)
DATE: 12/09/1999
ROADWAY IMPACT FEE:
Service Area * 10
Category ** Industrial
'Land Use ** General Light Industrial
Building Area (st) 26,000
Development Units ** 26.00
Vehicle Miles per Development Unit ** 1.06
Fee per Vehicle Mile *** $300
Roadway Impact Fee due = (Development Units) x
!(Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) = $8.268.00
* (Figure 2 - Roadway Impact Fee Study)
** (Table 3 - Roadway Impact Fee Study)
*** (Schedule 2, Page 3 - Roadway Impact Fee Study)
Percent of Credit Toward Roadway Impact Fees 50%
Total Credit S4,134.00
[ . A3tO~i~r~VE,~.:~::-~-:.::- -:::~: S'*.~.3~:-o~:l