Northlake 635(8)-CS 861031GINN, INC. CONSULTING ENGINEERS
TO: Ed Powell, P.E., City Engineer
Attn: Taryon Bowman, Senior Planning Technician
FROM: Gabe Favre, Ginn, Inc.
DATE: October 31, 1986
SUBJECT: McAllester Trucking
~ortb. lake 635 Business Park
Preliminary Plat
~Te have reviewed the above referenced project for conformance to
the City of Coppell's Zoning Ordinance, Subdivision Ordinance,
Streetscape Plan, and Standards as applicable and the followin9
sets forth our comments.
1. Provide signature blocks for P & Z and Council on
preliminary plat.
2. Verify' with City Engineer whether water mains, sanitary
sewer mains and storm drainage systen] needs to be located
within easement or not.
3. Verify %:ith fire marshall that fire lane turnaround can be
used in lieu of cul-de-sac turnaround.
4. Parkin9 requirements of proposed building area is 79 spaces.
What happens when future expansion is completed? Where will
parking for new area be located?
5. Indicate pavement design (thickness, strength, etc.) on plans.
6. Use Technical paper 40, not TP-25 in design of storr~ sewer.
Gabe Favre
/ss
16.!35 Pre.ton Road · St.-itc 106 · Dalla-. Tcxa~ 7-52-18 · Phone 214- -386-661!