ST9801-CR001009DALLY CONSTRUCTION REPORT
PROJECT
PROJECT NO.
OWNER
CONTRACTOR
PROJECT INSPECTOR
COPPELL ROAD
(Sandy Lake Rd. to SH 121)
ST 98-01
CITY of COPPELL
ED BELL CONSTRUCTION CO.
LARRY DAVIS
DAY
REPORT it
I~)[TIw ITJFIS IS l
SUN CLEAR .~;efAST ~ RAIN [ SNOW
To 32 32.-50 ;v,,,~ ~ ~ ~
AVERAGE FlED FORCE
NAM~ OF CONTRACTOR
VISITORS
TIME REPRESENTATIVE REPRESENTING
EQUIPMENT AT THE SITE:
CONSTRUCTION ACTIVITIES:
SIGNATURE
PUBLIC WORKS INSPECTOR
Page __ of .. pages.