Northlake 635(3)-LR 980216IN-PLACE DENSITY ,ZSTING
Date of Service:
Client No.:
Client:
02/04/1998
52617000
Lincoln Property Company
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Services: In-place density testing.
CONTRACTOR: Butler Construction
MOISTURE DENSITY RELATIONS:
M/D No. Description
I Med brn silty clay w/organics
TEST
NO TEST LOCATION
Report No.: 980369(
Project No.: 43-2452
Project: Coppell
Belt Lin
Coppell,
4747 Irving Blvd., Suite 0206
Dallas, Texas 75247
PROJECT DATA
Laboratory Test Method:
Field TestMethod:
ASTI~
ASTM
ASTM
Maximum
Moisture % Density pcf
23.5 99.0
FIELD DENSITY TESTS
M/D MOISTURE
No. (%)
,97
Report Date
02/16/1998
Business Center II
~ Rd. & Lakeshore Dr.
Texas
D-698
D-2922
D-3017
Project Requirement~
Building A, NE Corner
364 40' W & 80' S, Subgrade prior to select fill
365 40' W & 160' S, Subgrade prior to select fill
366 40' W & 240' S, Subgrade prior to select fill
367 40' W & 320' S, Subgrade prior to select fill
368 40' W & 420' S, Subgrade prior to select fill
369 120' W & 460' S, Subgrade prior to select fill
370 120' W & 380' S, Subgrade prior to select fill
371 120' W & 300' S, Subgrade prior to select fill
372 120' W & 220' S, Subgrade prior to select fill
373 120' W & 140' S, Subgrade prior to select fill
374 150' W & 200' S, Subgrade prior to select fill
375 150' W & 400' S, Subgrade prior to select fill
I 26.9
1 26.7
1 27.0
1 26.5
1 26.7
1 26.7
1 26.9
1 27.1
1 26.8
1 26.9
1 26.6
1 27.0
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the wri~
Moisture
lin. +3%
DRY DENSITY
(pc0
Density
92%
DENSITY
(% max)
92.7 94
92.8 94
92.5 93
92.6 94
92.9 94
92.7 94
92.5 93
92.6 94
92.4 93
92.7 94
92.8 94
92.6 94
ten approval of HBC Engineering, Inc.
07SS Page 1 of 2
Report No.:
9803690
Test results on this report meet project specification.
Technician: Tex King
Report Distribution:
(1) Lincoln Prol~rty Company
(I) Butler Construction
(I) O'Bricn & Associates
(I) AECC, [nc.
( 1 ) City of Coppell/BIdg. Insp.
(!) City of Coppell/constr. Insp.
I'-l~ E~ng, Inc.
This report is exclusively for thc use of thc client indicated above and shall not be reproduced except in full without thc wri~
07SS Page 2 of 2
P~.ul D. Smith, P.E.
Se flor Project Engineer
ten approval of HBC Engineering, Inc.