Loading...
Northlake 635(3)-LR 980216IN-PLACE DENSITY ,ZSTING Date of Service: Client No.: Client: 02/04/1998 52617000 Lincoln Property Company 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 Services: In-place density testing. CONTRACTOR: Butler Construction MOISTURE DENSITY RELATIONS: M/D No. Description I Med brn silty clay w/organics TEST NO TEST LOCATION Report No.: 980369( Project No.: 43-2452 Project: Coppell Belt Lin Coppell, 4747 Irving Blvd., Suite 0206 Dallas, Texas 75247 PROJECT DATA Laboratory Test Method: Field TestMethod: ASTI~ ASTM ASTM Maximum Moisture % Density pcf 23.5 99.0 FIELD DENSITY TESTS M/D MOISTURE No. (%) ,97 Report Date 02/16/1998 Business Center II ~ Rd. & Lakeshore Dr. Texas D-698 D-2922 D-3017 Project Requirement~ Building A, NE Corner 364 40' W & 80' S, Subgrade prior to select fill 365 40' W & 160' S, Subgrade prior to select fill 366 40' W & 240' S, Subgrade prior to select fill 367 40' W & 320' S, Subgrade prior to select fill 368 40' W & 420' S, Subgrade prior to select fill 369 120' W & 460' S, Subgrade prior to select fill 370 120' W & 380' S, Subgrade prior to select fill 371 120' W & 300' S, Subgrade prior to select fill 372 120' W & 220' S, Subgrade prior to select fill 373 120' W & 140' S, Subgrade prior to select fill 374 150' W & 200' S, Subgrade prior to select fill 375 150' W & 400' S, Subgrade prior to select fill I 26.9 1 26.7 1 27.0 1 26.5 1 26.7 1 26.7 1 26.9 1 27.1 1 26.8 1 26.9 1 26.6 1 27.0 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the wri~ Moisture lin. +3% DRY DENSITY (pc0 Density 92% DENSITY (% max) 92.7 94 92.8 94 92.5 93 92.6 94 92.9 94 92.7 94 92.5 93 92.6 94 92.4 93 92.7 94 92.8 94 92.6 94 ten approval of HBC Engineering, Inc. 07SS Page 1 of 2 Report No.: 9803690 Test results on this report meet project specification. Technician: Tex King Report Distribution: (1) Lincoln Prol~rty Company (I) Butler Construction (I) O'Bricn & Associates (I) AECC, [nc. ( 1 ) City of Coppell/BIdg. Insp. (!) City of Coppell/constr. Insp. I'-l~ E~ng, Inc. This report is exclusively for thc use of thc client indicated above and shall not be reproduced except in full without thc wri~ 07SS Page 2 of 2 P~.ul D. Smith, P.E. Se flor Project Engineer ten approval of HBC Engineering, Inc.