Northlake 635(3)-LR 980218 (4)'IN-PLACE DENSITY /" STING
Date of Service: 02/12/1998
Client No.: 52617000
Client: Lincoln Property Company
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Services: In-place density testing.
CONTRACTOR: Butler Construction
Report No.: 980494~
Project No.: 43-2452.97
MOISTURE DENSITY RELATIONS:
M/D No. Description
1 Lt gray reddish &mcd bm
2 shaley clay
Project:
PROJECT DATA
Laboratory Test Method:
Maximum
Density pcf
Field Test Method:
Moisture %
23.5
0.0
FIELD DENSITY TESTS
98.5
0.0
TEST M/D MOISTURE
NO TEST LOCATION No. (%)
8" Fire Line
406 3rd lift at sta 2+95 1 23.6
407 2nd lift at sm 2+96 1 24.1
408 1st lift at sta 2+98 1 23.9
409 3rd lift at sta 5+90 1 23.3
410 2nd lift at sta 5+95 1 23.6
411 1st lift at sta 6+00 1 23.9
412 3rd lift at sta 8+90 1 23.6
413 2nd lift at sta 8+95 1 23.9
414 1st lift at sta 9+00 1 24.1
415 3rd lift at sta 11+90 1 23.9
416 2nd lift at sta 11 +95 1 24.4
Coppell
Belt Lin
Coppell,
ASTM
ASTM
ASTM
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the writ~
07MP Page 1 of 2
4747 Irving Blvd., Suite #206
Dallas, Texas 75247
Report Date
02/18/1998
Business Center H
.~ Rd. & Lakeshore Dr.
Texas
D-698
D-2922
D-3017
Project Requirements
Moisture Density
- 1/+3% 95%
DRY DENSITY DENSITY
Coco (%
96.6 98
96.1 98
96.4 98
97.5 99
97.2 99
97.0 99
97.2 99
97.1 99
96.8 98
97.0 99
96.8 98
approval of HBC Engineering, Inc.
Report No.: 9804944
TEST
NO
TEST LOCATION
M/D MOISTURE
No. (%)
417 1st lift at sta 12+00
418 3rd lift at sta 14+90
419 2nd lift at sta 14+95
420 1st lift at sta 15+00
421 3rd lift at sta 17+90
422 2nd lift at sta 17+95
423 1 st lift at sta 18+00
424 3rd lift at sta 20+90
425 2nd lift at sta 20+95
426 1st lift at sta 21+00
427 3rd lift at sta 23+90
428 2nd lift at sta 23+95
429 1 st lift at sta 24+00
430 3rd lift at sta 26+90
431 2nd lift at sta 26+95
432 1st lift at sta 27+00
1 24.6
1 23.9
1 24.3
1 24.6
1 23.9
1 24.3
1 24.2
1 , 23.1
1 23.5
1 23.6
1 24.1
1 24.4
1 24.5
1 23.6
1 23.9
1 24.6
Test results on this report meet project specification.
Technician: Tex King
Report Distribution:
(1) Lincoln Property Company
(1) Butler Construction
(l) O'Brien & Associates
(l) AECC, Inc.
( 1 ) City of Coppell/Bldg. Insp.
(1) City of Coppell/Conslr. lnsp.
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the writ
DRY DENSITY
(pe0
DENSITY
(% max)
96.5 98
97.1 99
96.0 98
96.0 98
97.4 99
97.1 99
97.2 99
98.2 100
97.2 99
97.0 99
97.1 99
97.2 99
97.4 99
97.6 99
97.8 99
96.6 98
E~ring, Inc.
D. Smith, P.E.
Set ior Project Engineer
m approval of I-IBC Engineering, Inc.
07MP Page 2 of 2