Loading...
Northlake 635(3)-LR 980218 (4)'IN-PLACE DENSITY /" STING Date of Service: 02/12/1998 Client No.: 52617000 Client: Lincoln Property Company 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 Services: In-place density testing. CONTRACTOR: Butler Construction Report No.: 980494~ Project No.: 43-2452.97 MOISTURE DENSITY RELATIONS: M/D No. Description 1 Lt gray reddish &mcd bm 2 shaley clay Project: PROJECT DATA Laboratory Test Method: Maximum Density pcf Field Test Method: Moisture % 23.5 0.0 FIELD DENSITY TESTS 98.5 0.0 TEST M/D MOISTURE NO TEST LOCATION No. (%) 8" Fire Line 406 3rd lift at sta 2+95 1 23.6 407 2nd lift at sm 2+96 1 24.1 408 1st lift at sta 2+98 1 23.9 409 3rd lift at sta 5+90 1 23.3 410 2nd lift at sta 5+95 1 23.6 411 1st lift at sta 6+00 1 23.9 412 3rd lift at sta 8+90 1 23.6 413 2nd lift at sta 8+95 1 23.9 414 1st lift at sta 9+00 1 24.1 415 3rd lift at sta 11+90 1 23.9 416 2nd lift at sta 11 +95 1 24.4 Coppell Belt Lin Coppell, ASTM ASTM ASTM This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the writ~ 07MP Page 1 of 2 4747 Irving Blvd., Suite #206 Dallas, Texas 75247 Report Date 02/18/1998 Business Center H .~ Rd. & Lakeshore Dr. Texas D-698 D-2922 D-3017 Project Requirements Moisture Density - 1/+3% 95% DRY DENSITY DENSITY Coco (% 96.6 98 96.1 98 96.4 98 97.5 99 97.2 99 97.0 99 97.2 99 97.1 99 96.8 98 97.0 99 96.8 98 approval of HBC Engineering, Inc. Report No.: 9804944 TEST NO TEST LOCATION M/D MOISTURE No. (%) 417 1st lift at sta 12+00 418 3rd lift at sta 14+90 419 2nd lift at sta 14+95 420 1st lift at sta 15+00 421 3rd lift at sta 17+90 422 2nd lift at sta 17+95 423 1 st lift at sta 18+00 424 3rd lift at sta 20+90 425 2nd lift at sta 20+95 426 1st lift at sta 21+00 427 3rd lift at sta 23+90 428 2nd lift at sta 23+95 429 1 st lift at sta 24+00 430 3rd lift at sta 26+90 431 2nd lift at sta 26+95 432 1st lift at sta 27+00 1 24.6 1 23.9 1 24.3 1 24.6 1 23.9 1 24.3 1 24.2 1 , 23.1 1 23.5 1 23.6 1 24.1 1 24.4 1 24.5 1 23.6 1 23.9 1 24.6 Test results on this report meet project specification. Technician: Tex King Report Distribution: (1) Lincoln Property Company (1) Butler Construction (l) O'Brien & Associates (l) AECC, Inc. ( 1 ) City of Coppell/Bldg. Insp. (1) City of Coppell/Conslr. lnsp. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the writ DRY DENSITY (pe0 DENSITY (% max) 96.5 98 97.1 99 96.0 98 96.0 98 97.4 99 97.1 99 97.2 99 98.2 100 97.2 99 97.0 99 97.1 99 97.2 99 97.4 99 97.6 99 97.8 99 96.6 98 E~ring, Inc. D. Smith, P.E. Set ior Project Engineer m approval of I-IBC Engineering, Inc. 07MP Page 2 of 2