Loading...
Northlake 635(3)-LR 980219CONCRETE COMPI SIVE'STRENGTH TES . Date of Service: Client No.: Client: 02/11/1998 52617000 Lincoln Property Company 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 Report No.: 9804774 Project No.: 43-2452 Project: Coppell Belt Lin Coppell, Services: Obtain samples of fresh concrete at the placement locations, perform requir compressive strength samples.** SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer Concrete PLANT: 22 SPECIFICATION REQUIREMENTS STRENGTH: 3500 psi ~ 28 Days 4-6" N/A ASTM C- 143 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: I/6 PROJECT DATA CONCRETE CLASS: 9337 PLACEMENT DATE: 02/11/1998 TIME SAMPLED: 10'00 am BY: 1~ WEATHER CONDITIONS: Warm, p TEMPERATURE (~3-AIR 56 V C TRUCK NO: 512 TICKE AIR CONTENT (%): N/A UN~ PLACEMENT LOCATION: Piers CYLINDER MEASURED MARKED SLUMP DATE SET NO. (inches) TESTED 1 1 5.00 02/18/1998 1 2 5.00 02/18/1998 1 3 5.00 03/11/1998 1 4 5.00 03/11/1998 REPORT OF TESTS MAXIMUM AGE LOAD (days) (lbs. force) 7 64400 7 65420 Average 28 28 AC Technician time on report 9804773. 4747 Irving Blvd., Suite #206 Dallas, Texas 75247 -97 Report Date 02/19/1998 Business Center II ~ Rd. & Lakeshore Dr. Texas ed field test and cast BATCH TIME: 9:10 am ,el Ratliff artly cloudy, windy 3NCRETE: 68 F rNO: 637173 T WEIGHT (pc0: N/A CUMULATIVE YARDS: ~OMPRESSIVE STRENGTH (psi) 2280 2310 2300 20 FRACTURE TYPE Technician: Del Ratliff Report Distribution: (1) Lincoln Property Company (I) Butler Construction (1) O'Bricn & Associates (1) AECC, Inc. Started: ( I ) City of Coppcll/BIdg. Insp. ( I ) City of Coppell/Constr. Insp. Finished: Inc This report is exclusively for thc usc of the client indicated above and shall not be reproduced except in full without thc wi ~ugene Harbour Vice President t~n approval of HBC Engineering, Inc. 01AK Page 1 of I 02/20/98 FRI 15:04 FAX 21463~70 HBC ENGINEERING ~ CONCRETE COMPRESSIV E STRENGTH TEST ~002 4747 Irving Blvd., Dallak Date of Service: 02/11/1998 Client No.: 52617000 Client: Lincoln Property Company 3300 Lincoln Plaza/Larry Moon 500 North Akard Street DaUas TX 75201-3394 Report No.: 9804774 Project No.: 43-2452. Project: Coppell Belt Lin~ Coppell, Services: Obtain samples of flesh concrete at the placement locations, perform requiz compressive strength samples.** $TRENGTII: SLUMP: AIR: ~ Mt'.THOD: CO~TRACrOm Butler Construction CONCRETE SUPPLIER; Pioneer Concrete PLANT: 22 SPECIFICATION REQUIREMENTS 3500 psi ~ 28 Days 4-6" N/A ASTM C-143 ASTM C-172 ASTM C-39 SAMPLE LOCATION: It'6 PROJECT DATA CONCRWTE CLA~q: PLACEMENT DATE;: 9337 02/11/1998 97 Report Date 02/19/1998 5usiness Center II ; Rd. & Lakesbore Dr. Texas ed field t~st and cast ~,TCa'nra~: 9:10 am T~MESA~LEO: 10:00 am ay: ~el ~tliff WEATH~ CONDmON$: W~, ~aRly cloudy, windy ~UCKNO: 512 ~C~TNO: 637173 PLACEMENT LOCATION: Piers REPORT OF TESTS CYLINDER MEASURED MAXIMUM MARKED SLUMP DATE AGE LOAD '- SE'T NO. (inches) TESTE;D (day~) (Ib~- force) I I 5.00 02/18/1998 7 64400 I 2 5.00 02/18/I 998 7 65420 Average 5.00 03/I 1/1998 28 5.00 03/11/1998 28 Technician time on report 9804773. Started: (!) City of Coppell/Bl4$. Imp. (I) City of Coppell/Con~tr. InSp. Finished: TeChnician: Del Ratliff Report Distribution: (l) Lincoln Ptopett7 Company (I) Butler Construction (l) O'Srlcn & Associates (1) AECC. lnG. This report i5 exclusively tbr the use of the client indicated above and shall not be eepro4uccd except in ~ull wlbhout thc PnOe 1 of 1 0tAK COM~RIESSIVE STRENGTH 2280 2310 2300 CCUMULATIVE YARDS: 20 FRACTURE TYPE Vi~ President written approval of I-iBC En$ineeting. lno. REPORT OF DRILLE r' BELLED PIER INSPE IO Date of Service: Client No.: Client: Services: 02/16/1998 52617000 Lincoln Property Company 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 Drilled belled pier inspection. Report No.: 980511[ Project No.: 43-2452 Project: Coppell Belt Lin, Coppell, On this date, an HBC jobsite as scheduled recorded data. Engineering technician arrived at the above ref, for drilled belled pier inspection. See attach~ NOTE: Piers drilled on this date were for Building A. Technician Time: 6:30 am to 2:00 pm 4747 Irving Blvd., Suite #206 Dallas, Texas 75247 -97 Report Date 02/19/1998 Business Center II ~ Rd. & Lakeshore Dr. Texas ~renced ~d sheets for Technician: Brian Otis Report Distribution: (1) Lincoln Property Company (I) City of Coppell/Bldg, Imp. ( I ) Butler Construction ( I ) City of Coppell/Constr. lnsp. (1) O'Brien & Assnoiat~s (!) AECC, Inc. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the wri 995S Page I of I Sea dot Project Engin~ ICh approval of HBC Engineering, Inc. REPORT OF DRILLED BELLED PIERS Project: Project No.: Coppell Business Center II Belt Line Rd. & Lakeshore Dr., Coppell, Texas 43-2452-97 4747 In'ins Boulevard, Suite 206 Dallas, Texas 75247 ReportNo.: 9805119 Date of Service: 02/16/98 Technician: D. Ratliff Page: 1 of 3 Pier Identification B-2 B-3 B-4 B-5 B-6 B-8 B-9 B-10 D-10 D-9 D-8 Pier Diameter (in.) 24 24 24 24 24 24 24 24 24 24 24 Bell Diameter (in.) Top of Pier Elevation (ft) Req. Depth From Exist. Grade (ft) Initial Depth of Pier From Existing Grade (ft) Final Depth of Pier From Existing Grade (ft) Depth From Top of Concrete (ft) Condition of Bottom (wet or d~y) Plumb Within Tolerance (yes or no) Casing Diameter (in) Cased Depth (ft) Reinforcing Bar Size (#) Length of Vertical Bars (fL) Time Drilling Was Completed 54 54 54 54 54 54 54 54 54 54 54 99.0 99.0 99.0 99.0 99.0 99.0 99.0 99.0 99.0 99.0 99.0 15.0 15.0 15.0 15.0 15.0 15.0 15.0 15.0 15.0 15.0 15.0 15.42 15.0 16.0 15.58 15.67 16.25 15.58 15.58 15.83 15.42 15.5 15.5 15.17 16.0 15.67 15.67 16.17 15.67 15.58 15.83 15.33 15.58 15.0 14.67 15.5 15.17 15.17 15.67 15.17 15.08 15.33 14.83 15.08 Dry Dry Dry Dry Dry Dry D. ry Dry Dry Dry Dry Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Time Concrete Was Placed 6 6 6 6 6 6 6 6 6 6 6 14.5 14.17 15.0 14.67 14.67 15.17 14.67 14.58 14.83 7:50 am 8:09 am 8:18 am 8:29 am 8:42 am 9:10 am 9:18 am 9:28 am 9:35 am 9:41 am 8:50 am 9:50 am 9:07 am 9:58 am 9:22 am 10:10 am 9:34 am 10:22 am 14.33 9:48 am 10:35 am 14.58 9:57 am 10:50 am REPORT OF DRILLED BELLED PIERS Project: Project No.: Coppell Business Center II Belt Line Rd. & Lakeshore Dr., Coppell, Texas 43-2452-97 4747 Irvin8 Boulevard, Suite 206 Dallas, Texas 75247 Report No.: 9805119 Date of Service: 02/16/98 Technician: D. Ratliff Page: 2 of 3 Pier Identification Pier Diameter (in.) D-6 24 D-5 24 D-4 24 D-3 24 D-2 C-2 C-3 C-4 24 C-5 24 C-6 24 C~8 24 Bell Diameter (in.) 54 54 54 54 54 54 54 54 Top of Pier Elevation (ft) 99.0 99.0 99.0 99.0 99.0 99.0 99.0 99.0 99.0 99.0 99.0 Req. Depth From Exist. Grade (ft) 15.0 15.0 15.0 15.0 15.0 15.0 15.0 15.0 15.0 15.0 15.0 Initial Depth of Pier From Exlefing Grade (ft) 15.42 15.5 15.58 16.0 16.0 16.25 17.0 16.25 16.33 16.5 17.0 Final Depth of Pier From Existing Grade (ft) 15.58 15.5 15.5 16.17 16.25 16.42 17.0 16.33 16.5 16.67 17.0 Depth From Top of Concrete (ft) 15.08 15.0 15.0 15.67 15.75 15.92 16.5 15.83 16.0 16.17 16.5 Condition of Bottom (wet or dry) Dry Dry Dry Dry Dry Dry Dry Dry Dry Dry _ . Dry Plumb Within Tolerance (yes or no) Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Casing Diameter (in) N/A N/A NIA N/A N/A N/A N/A N/A N/A N/A N/A Cased Depth (ft) N/A N/A NIA N/A NIA N/A N/A N/A N/A N/A N/A Number of Verii=ai ~ara (ea.) 6 6 6 6 6 6 6 6 6 6 6 Reinforcing Bar Size (#) 6 6 6 6 6 6 6 6 6 6 6 Length of Vertical Bars (ft.) 14.58 15.0 15.0 15.17 15.25 15.42 16.0 15.33 15.5 15.67 16.0 Time Drilling Was Completed 10:06 am 10:15 am 10:30 am 10:43 am 10:55 am 9:05 am 9:18 am 9:33 am 9:48 am 10:05 am 10:18 am Time Concrete Was Placed 11:03 am 11:18 am 11:33 am 11:45 am 11:57 am 12:07 pm 12:15 pm 12:25 pm 12:33 pm 12:45 pm 12:56 pm IL REPORT OF DRILLED BELLED PIERS Project: Project No.: Coppell Business Center II Belt Line Rd. & Lakeshore Dr., Coppell, Texas 43-2452-97 FJqGINEERII'~, INC. 4747 lrvin8 Boulevard, Suite 206 Dallas, Texas 75247 ReportNo.: 9805119 Date of Service: 02/16/98 Technician: D. Ratliff Page: 3 of 3 Pier Identification Pier Diameter (in.) Bell Diameter (in.) Top of Pier Elevation (ft) Req. Depth From Exist. Grade (ft) Initial Depth of Pier From Existing Grade (ft) Final Depth of Pier From Existing Grade (ft) Depth From Top of Concrete (ft) Condition of Bottom (wet or dry) Plumb Within Tolerance (yes or no) Casing Diameter (in) Cased Depth (fi) NHmk~r ,~f V~Hi~al ~a~,~ I~a t Reinforcing Bar Size (#) Length of Vertical Bars (ft.) Time Drilling Was Completed C-9 24 99.0 15.0 16.25 16.42 15.92 Dry Yes N/A N/A 6 6 15.42 10:33 am C-10 24 54 99.0 15.0 16.33 16.5 16.0 Dry Yes N/A N/A 6 6 15.5 10:50 am 1:20 pm Time Concrete Was Placed 1:08 pm