Loading...
Northlake 635(3)-LR 980226CONCRETE COMPPJQSIVE STRENGTH TES_ _ Date of Service: Client No.: Client: 02/16/1998 52617000 Lincoln Property Company 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 Report No.: 9805120 Project No.: 43-2452- Project: Coppell Belt Coppell, Services: Obtain samples of fresh concrete at the placement locations, perform require compressive strength samples.** SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer Concrete PLANT: 22 SPECIFICATION REQUIREMENTS STRENGTH: 3500 psi ~ 28 Days 5" N/A ASTM C- 143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9337 PLACEMENT DATE: 02/16/1998 TIME SAMPLED: 10:55 am BY: B WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCKNO: 841 AIR CONTENT (%): N/A PLACEMENT LOCATION: Piers, Building A Cloudy, ~ 53 F c¢ TICKE' UN[' SAMPLE LOCATION: C-2, C-3, C-4 CYLINDER MEASURED MARKED SLUMP DATE SET NO. (inches) TESTED 1 1 4.75 02/23/1998 I 2 4.75 02/23/I 998 1 3 4.75 03/16/1998 I 4 4.75 03/16/1998 REPORT OF TESTS MAXIMUM AGE LOAD (days) (lbs. force) 7 103540 7 105500 Average 28 28 ACe Technician time on report 9805119. ENGINF_.ERING, INC. 4747 Irving Blvd., Suite #206 Dallas, Texas 75247 Report Date 02/26/1998 97 ~usiness Center II Rd. & Lakeshore Dr. Texas :d field test and cast BATCH TIME: 10:05 am · ian Otis [rizzle }NCRETE: 68 F NO: 633493 WEIGHT (pcO: N/A ~UMULATIVE YARDS: 30 :OMPRESSIVE STRENGTH (psi) 3660 3730 3700 FRACTURE TYPE Technician: Brian Otis Report Distribution: (I) Lincoln Property Company (1) Butler Construction (I) O'Brien & Associates (1) AECC, Inc. Started: (I) City of Coppell/Bldg. Insp. ( I ) City of Coppell/Constr. Insp. Finished: This report is cxclusivcly t'or thc use of thc clicnt indicated abovc and shall not be rcprodu~d except in full without thc writ Vice President cn approval of HBC Engineering, Inc. 01AK Page 1 of 1 CONCRETE COMPR SIVE STRENGTH Date of Service: 02/18/1998 Report No.: Client No.: 52617000 Project No.: Client: Lincoln Property Company Project: 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 980531 43-245: Coppell Belt Lin~ Coppell, Services: Obtain samples of fresh concrete at the placement locations, perform requir compressive strength samples.** SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer Concrete PLANT: 22 SPECIFICATION REQUIREMENTS STRENGTH: 3500 psi ~ 28 Days 5" N/A ASTM C-143 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: Piers A/9, A-9.5, A-10 PROJECT DATA CONCRETE CLASS: 9337 PLACEMENT DATE: 02/18/1998 · IMESAMPLED: 12:24pm BY: B WEATHER CONDITIONS: Clear, TEMPERATURE Or) - AIR 63 g TRUCK NO: 736 TICKE AIR CONTENT (%): N/A UNI PLACEMENT LOCATION: Piers, Building A REPORT OF TESTS CYLINDER MEASURED MARKED SLUMP DATE SET NO. (inches) TESTED 1 1 5.00 02/25/1998 1 2 5.00 02/25/1998 1 3 5.00 03/18/1998 1 4 5.00 03/18/1998 MAXIMUM AGE LOAD (days) (lbs. force) 7 105250 7 103550 Average 28 28 AC Technician time on report 985315. 4747 Irving Blvd., Suite #206 Dallas, Texas 75247 .97 Report Date 02/26/1998 Business Center II : Rd. & Lakeshore Dr. Texas :d field test and cast BATCH TIME: 11:45 am dan Otis ld )NCRETE: 64 V rNo: 633579 r WEIGm' (PC0: N/A 2UMULATIVE YARDS: 30 2OMPRESSIVE STRENGTH (psi) 3720 3660 369O TYPE Technician: Brian Otis Report Distribution: (I) Lincoln Property Company (1) Butler Construction (1) O'Brien & Associates (1) AECC, Inc. Started: (1) City of Coppell/Bldg. lnsp. (1) City of Coppell/Constr. Insp. Finished: Inc. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the wr ;ugene Harbour Vice President ten approval of HBC Engineering, Inc. 01AK Page 1 of 1 REPORT OF DRILLE_/"PIER INSPECTION Date of Service: Client No.: Client: Services: 02/19/1998 52617000 Lincoln Property Company 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 Drilled pier inspection. Report No.: 980543~ 4747 Irving Blvd., Suite #206 Dallas, Texas 75247 Project No.: 43-2452 Project: Coppell Belt Lin Coppell, ¸97 Report Date 02/26/1998 Business Center II ~ Rd. & Lakeshore Dr. Texas On this date, an HBC jobsite as scheduled contractor's arrival piers. Technician Time: Technician: Brian Otis Report Distribution: (l) Lincoln Property Company (I) Butler Construction (l) O'Brien & Associates (1) AECC, Inc. Engineering technician arrived at the above ref for drilled pier inspection. It was determined that the ground was too wet from previous rain 6:30 am to 8:30 am (I) City ofCoppell/Bldg. Insp. (1) City ofCoppell/Constr. Insp. Pa Sc~ This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the wti~ ~renced upon :o drill En~g, Inc. ul D. Smith, P.E. tier Project Engineer ten approval of HBC Engineering, Inc. 99SS Page 1 of I