Northlake 635(3)-LR 980226CONCRETE COMPPJQSIVE STRENGTH TES_ _
Date of Service:
Client No.:
Client:
02/16/1998
52617000
Lincoln Property Company
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Report No.: 9805120
Project No.: 43-2452-
Project: Coppell
Belt
Coppell,
Services: Obtain samples of fresh concrete at the placement locations, perform require
compressive strength samples.**
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 22
SPECIFICATION REQUIREMENTS
STRENGTH: 3500 psi ~ 28 Days
5"
N/A
ASTM C- 143
ASTM C- 172
ASTM C-39
PROJECT DATA
CONCRETE CLASS: 9337
PLACEMENT DATE: 02/16/1998
TIME SAMPLED: 10:55 am BY: B
WEATHER CONDITIONS:
TEMPERATURE (F) - AIR
TRUCKNO: 841
AIR CONTENT (%): N/A
PLACEMENT LOCATION:
Piers, Building A
Cloudy, ~
53 F c¢
TICKE'
UN['
SAMPLE LOCATION: C-2, C-3, C-4
CYLINDER MEASURED
MARKED SLUMP DATE
SET NO. (inches) TESTED
1 1 4.75 02/23/1998
I 2 4.75 02/23/I 998
1 3 4.75 03/16/1998
I 4 4.75 03/16/1998
REPORT OF TESTS
MAXIMUM
AGE LOAD
(days) (lbs. force)
7 103540
7 105500
Average
28
28
ACe
Technician time on report 9805119.
ENGINF_.ERING, INC.
4747 Irving Blvd., Suite #206
Dallas, Texas 75247
Report Date
02/26/1998
97
~usiness Center II
Rd. & Lakeshore Dr.
Texas
:d field test and cast
BATCH TIME: 10:05 am
· ian Otis
[rizzle
}NCRETE: 68 F
NO: 633493
WEIGHT (pcO: N/A
~UMULATIVE YARDS: 30
:OMPRESSIVE
STRENGTH
(psi)
3660
3730
3700
FRACTURE
TYPE
Technician: Brian Otis
Report Distribution:
(I) Lincoln Property Company
(1) Butler Construction
(I) O'Brien & Associates
(1) AECC, Inc.
Started:
(I) City of Coppell/Bldg. Insp.
( I ) City of Coppell/Constr. Insp.
Finished:
This report is cxclusivcly t'or thc use of thc clicnt indicated abovc and shall not be rcprodu~d except in full without thc writ
Vice President
cn approval of HBC Engineering, Inc.
01AK Page 1 of 1
CONCRETE COMPR SIVE STRENGTH
Date of Service: 02/18/1998 Report No.:
Client No.: 52617000 Project No.:
Client: Lincoln Property Company Project:
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
980531
43-245:
Coppell
Belt Lin~
Coppell,
Services: Obtain samples of fresh concrete at the placement locations, perform requir
compressive strength samples.**
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 22
SPECIFICATION REQUIREMENTS
STRENGTH: 3500 psi ~ 28 Days
5"
N/A
ASTM C-143
ASTM C- 172
ASTM C-39
SAMPLE LOCATION:
Piers A/9, A-9.5, A-10
PROJECT DATA
CONCRETE CLASS: 9337
PLACEMENT DATE: 02/18/1998
· IMESAMPLED: 12:24pm BY: B
WEATHER CONDITIONS: Clear,
TEMPERATURE Or) - AIR 63 g
TRUCK NO: 736 TICKE
AIR CONTENT (%): N/A UNI
PLACEMENT LOCATION:
Piers, Building A
REPORT OF TESTS
CYLINDER MEASURED
MARKED SLUMP DATE
SET NO. (inches) TESTED
1 1 5.00 02/25/1998
1 2 5.00 02/25/1998
1 3 5.00 03/18/1998
1 4 5.00 03/18/1998
MAXIMUM
AGE LOAD
(days) (lbs. force)
7 105250
7 103550
Average
28
28
AC
Technician time on report 985315.
4747 Irving Blvd., Suite #206
Dallas, Texas 75247
.97
Report Date
02/26/1998
Business Center II
: Rd. & Lakeshore Dr.
Texas
:d field test and cast
BATCH TIME: 11:45 am
dan Otis
ld
)NCRETE: 64 V
rNo: 633579
r WEIGm' (PC0: N/A
2UMULATIVE YARDS: 30
2OMPRESSIVE
STRENGTH
(psi)
3720
3660
369O
TYPE
Technician: Brian Otis
Report Distribution:
(I) Lincoln Property Company
(1) Butler Construction
(1) O'Brien & Associates
(1) AECC, Inc.
Started:
(1) City of Coppell/Bldg. lnsp.
(1) City of Coppell/Constr. Insp.
Finished:
Inc.
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the wr
;ugene Harbour
Vice President
ten approval of HBC Engineering, Inc.
01AK Page 1 of 1
REPORT OF DRILLE_/"PIER INSPECTION
Date of Service:
Client No.:
Client:
Services:
02/19/1998
52617000
Lincoln Property Company
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Drilled pier inspection.
Report No.: 980543~
4747 Irving Blvd., Suite #206
Dallas, Texas 75247
Project No.: 43-2452
Project: Coppell
Belt Lin
Coppell,
¸97
Report Date
02/26/1998
Business Center II
~ Rd. & Lakeshore Dr.
Texas
On this date, an HBC
jobsite as scheduled
contractor's arrival
piers.
Technician Time:
Technician: Brian Otis
Report Distribution:
(l) Lincoln Property Company
(I) Butler Construction
(l) O'Brien & Associates
(1) AECC, Inc.
Engineering technician arrived at the above ref
for drilled pier inspection. It was determined
that the ground was too wet from previous rain
6:30 am to 8:30 am
(I) City ofCoppell/Bldg. Insp.
(1) City ofCoppell/Constr. Insp.
Pa
Sc~
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the wti~
~renced
upon
:o drill
En~g, Inc.
ul D. Smith, P.E.
tier Project Engineer
ten approval of HBC Engineering, Inc.
99SS Page 1 of I