Northlake 635(3)-LR 980227REPORT OF DRILLE BELLED PIER INSPE fIO
Date of Service: 02/20/1998
Client No.: 52617000
Client: Lincoln Property Company
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Report No.: 980553:
Project No.: 43-2452
Project: Coppell
Belt Lin
Coppell,
Services: Drilled belled pier inspection.
On this date, an HBC Engineering technician arrived at the above ref
jobsite as scheduled for drilled belled pier inspection. See attach
recorded data.
NOTE: Pier depths were adjusted in field to stay above water table
8901 Carpenter Frwy., $~ #100
Daila~ Taxaa 75247
Report Date
02/27/1998
.97
Business Center II
.~ Rd. & Lakeshore Dr.
Texas
erenced
ed sheets for
Piers drilled on this date were for Building C.
Technician Time: 6:30 am to 5:00 pm
Technldan: Brian Otis
RepoFt Distribution:
(1) I.,in~h Prepmy C~mpmy
(1) Butler Ccmtnmti~,-
(1) Oq~rim
(1) AEC¢,
O) c~t~ of Co~aVm~ hap.
(1) City of CoppelltC~. Insp.
P;
This repcrt is exdu~vety fcr the use of the climt/ndic~ted above and shall not be reproduced except/n full w/thout ~he wrftt¢
E~ring, Inc.
tul D. Smith, P.E.
flor Project Engineer
a .pproval of HBC F. ng/ne~ring. Inc.
99,gS Page I of 1
REPORT OF DRILLED BELLED PIERS
4747 Irving Boulevard, Suite 206
Dallas, Texas 75247
Project:
Project No.:
Coppell Business Center II
Belt Line Rd. & Lakeshore Dr., Coppell, Texas
43 -2452-97
Report No.: 9805532
Date of Service: 02/20/98
'rechnician: B. Otis
Page: 1 of 2
Pier Identification
Pier Diameter (in.) 24
Bell Diameter (in.)
Top of Pier Elevation (ft)
Req. Depth From Exist. Grade (ft)
Initial Depth of Pier From Existing
Grade (ft)
Final Depth of Pier From Existing
Grade fit)
7-C.3
54
95.0
13,0
15.42
7-D.3
24
54
95.0
13.0
7-C.8 7-D
24 24
54 60
95.0 95.0
13.0 13.0
13.75 15.0
15.0 15.17
13.58 13.75
Dry Dry
Yes Yes
16.42
7-D.8
24
95.0
13.0
15.17
7-E.3
24
54
95.0
13.0
13.75
7-E.8
24
54 ~
7-E
60
95.0
13.0
14.42
14.58
13.16
Dry
Yes
95.0
13.0
14.0
60
7-F t 7-F.3
24 24
54
95.0
13.0
13.0
95.0
13.0
12.0
7-F.8
24
54
95.0
13.0
15.83 17.0 15.5 14.0 14.42 13.58 12.25
Depth From Top of Concrete (ft) 14.41 15.58 14.08 12.58 13.0 12.16 10.83 9.58
D,ry
Yes
Dry
Dry
Dry
Dry
Dry
Condition of Bottom (wet or, dry)
Dry
10.83
11.0
Dry
Reinforcing Bar Size (#) 6 6 6 6 6 6 6 6 6 6 6
Length of Vertical Bars (lc) 13.91 13.08 13.25 15.08 13.58 12.66 12.08 12.5 11.66 10.33 9.08
Time Drilling Was Completed 8:02 am 8:07 am 8:19 am 8:25 am 8:37 am 8:44 am 8:55 am 9:05 am 9:42 am 9:55 am 10:00 am
Time Concrete Was Placed 12:30 pm 12:38 pm 12:46 pm 12:51 pm 12:58 pm 1:15 pm 1:22 pm 1:30 pm 1:38 pm 1:45 pm 1:55 pm
6
Plumb Within Tolerance (yes or no) Yes Yes Yes Yes Yes Yes Yes
Casing Diameter (in) N/A N/A N/A N/A N/A N/A NIA N/A N/A N/A N/A
Cased Depth (ft) N/A N/A N/A N/A N/A N/A N/A N/A NIA N/A N/A
REPORT OF DRILLED BELLED PIERS
Project:
Project No.:
Coppell Business Center II
Belt Line Rd. & Lakeshore Dr., Coppell, Texas
43-2452-97
Report No.:
Date of Service:
Technician:
Page:
4747 Irvin8 Boulevard, Suite 206
Dallas, Texas 75247
9805532
02/20/98
B. Otis
2 of 2
Pier Identification
Pier Diameter (in.)
Bell Diameter (in.)
Top of Pier Elevation (ft)
Req. Depth From Exist. Grade (ft)
Initial Depth of Pier From Existing
Grade (fi)
Final Depth of Pier From Existing
Grade (ft)
7-G
24
60
95.0
13.0
13.33
A-5.9
24
94.0
13.0
16.83
A-6
24
13.0
13.0
A-6.5
24
72
13.0
15.67
13.58 17.25 13.5 16.0
Depth From Top of Concrete (ft) 12.16 15.83 12.08 14.58
Dry
Dry
D.ry
Yes
Dry
Yes Yes Yes
N/A N/A N/A N/A
N/A
N/A
6
Condition of Bottom (wet or dry)
Plumb Within Tolerance (yea or no)
Casing Diameter (in)
Cased Depth (ft)
Nut, be; o; Veal;ca; ---a,~ (ea.)
N/A
N/A
Reinforcing Bar Size (#) 6 6 6 6
Length of Vertical Bars (ft.) 11.66 15.33 11.58 14.08
Time Drilling Was Completed
12:30 pm
9:10 am
3:38 pm
3:30 pm
Time Concrete Was Placed
9:19 am
3:49 pm
9:35 am
4:05 pm
IL