Loading...
Northlake 635(3)-LR 980304CONCRETE COMPR ' ,SIVE STRENGTH Date of Service: Client No.: Client: 02/24/1998 52617000 Lincoln Property Company 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 Report No.: 9805824 Project No.: 43-2452 Project: Coppell Belt Lin Coppell, Services: Obtain samples of fresh concrete at the placement locations, perform requi~ compressive strength samples.** SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer Concrete PLANT: 22 SPECIFICATION REQUIREMENTS STRENGTH: 3500 psi ~ 28 Days 5" N/A ASTM C- 143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9337 PLACEMENT DATE: 02/24/1998 TIME SAMPLED: 10:24 am BY: [ WEATHER CONDITIONS: Clear, m TEMPERATURE (F) - AIR 64 F C TRUCK NO: 552 TICKI~ AIR CONTENT (%): N/A UN: PLACEMENT LOCATION: Piers, Building B SAMPLE LOCATION: 8E, 9E, 10E CYLINDER MEASURED MARKED SLUMP DATE SET NO. (inches) TESTED I I 5.75 03/03/1998 I 2 5.75 03/03/1998 I 3 5.75 03/24/1998 1 4 5.75 03/24/1998 REPORT OF TESTS MAXIMUM O AGE LOAD (days) (lbs. force) 7 91190 7 89700 Average 28 28 AC Technician time on report 9805823. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 7S247 Report Date 03/04/1998 -97 Business Center II ~ Rd. & Lakeshore Dr. Texas ed field test and cast BATCH TIME: 9:50 am .rian Otis lid DNCRETE: 70 F TNO: 633871 T WEIGHT (pc0: N/A CUMULATIVE YARDS: COMPRESSIVE STRENGTH (psi) 3220 3170 3200 10 FRACTURE TYPE Technician: Brian Otis Report Distribution: (I) Lincoln Property Company (1) Butler Construction (1) O'Brien & Associates (I) AECC, Inc. Started: ( 1 ) City of Coppell/BIdg. lnsp. (1) City of Coppell/Constr. lnsp. Finished: , Inc. ~'dgene Harbour This report is exclusively for thc use of the client indicated above and shall not be reproduced except in full without the wr Vice President approval of HBC Engineering, Inc. 01AK Page ! of I CONCRETE COMPRL SIVE STRENGTH TES Date of Service: Client No.: Client: 02/20/1998 52617000 Lincoln Property Company 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 Report No.: 9805533 Project No.: 43-2452- Project: Coppell Belt Lin Coppell, Services: Obtain samples of fresh concrete at the placement locations, perform requir, compressive strength samples.** SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Consffuction CONCRETE SUPPLIER: Pioneer Concrete PLANT: 22 SPECIFICATION REQUIREMENTS STRENGTH: 3500 psi ~ 28 Days 5" N/A ASTM C- 143 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: 7-C.3,7-C.8,7-D PROJECT DATA CONCRETE CLASS: 9337 PLACEMENT DATE: 02/20/1998 TIME SAMPLED: 10:53 am By: B WEATHER CONDITIONS: Clear, mi TEMPERATURE (F) - AIR 69 V TRUCKNO: 730 TICK~ AIR CONTENT (%): N/A UNI PLACEMENT LOCATION: Piers, Building C CYLINDER MEASURED MARKED SLUMP DATE SET NO. (inches) TESTED I I 5.75 02/27/1998 1 2 5.75 02/27/1998 I 3 5.75 03/20/1998 I 4 5.75 03/20/1998 REPORT OF TESTS MAXIMUM AGE LOAD (days) (lbs. force) 7 110960 7 11483.0 Average 28 28 AC Technician time on report 9805532. Technician: Brian Otis Report Distribution: (1) Lincoln Property Company (1) Butler Construction (I) O'Brien & Associates (l) AECC, Inc. Started: Finished: ~I~ (I) City of Coppell/Bldg. lnsp. (I) City of Coppell/Constr. lnsp. This report is exclusively tbr the use of the client indicated above and shall not be reproduced except in full without the wi 01AK Page 1 of I 97 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 03/04/1998 3usiness Center II ~, Rd. & Lakeshore Dr. Texas field test and cast BATCH TIME: 10:05 am dan Otis Id )NCRETE: 68 F rno: 633688 r WEIGHT (PCO: N/A ?UMULATIVE YARDS: :OMPRESSIVE STRENGTH (psi) 3920 4060 3990 10 En~nc. u~%rHarbour Vice President ~en approval of HBC Engineering, Inc. REPORT OF DRILLE BELLED PIER INSPE?FION Date of Service: 02/25/1998 Client No.: 52617000 Client: Lincoln Property Company 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 Services: Drilled belled pier inspection. Report No.: 980591 Project No.: 43-245'~ Project: Coppell Belt Lit Coppell On this date, an HBC Engineering technician arrived at the above re] jobsite as scheduled for drilled belled pier inspection. See attact recorded data. NOTE: Piers drilled on this date were for Building B. Pier depth varies based on depth that water is encountered ar which bearing stratum is located. These exterior piers were drilled with a 28-inch auger at contractor's request. This was done so top plates would not have to be cut smaller to be used. Plans call for piers to be drilled at 24-inch. Pier F-2, once drilled contractor opted not to bell and concl this pier. Contractor was backfilled pier. Technician Time: 6:00 am to 6:30 pm 8901 Carpenter Frnvy., Suite #100 Dallas, Tmxas 75247 ,97 Report Date 03/04/1998 Business Center II e Rd. & Lakeshore Dr. Texas erenced .ed sheets for .d/or depth in ete Teclmldan: Brian Otis Report Distribution:, (1) Lincoln Property Compmy (1) Butler C, mstruct/ea (1) (YBfim & Associat~ (1) AECC, h~ O) city o~ CoppaVBlds mm. O) city,~coppayca~, rasp. This repc,~/s e~elusively for the use of the client/ndic~ed above md .shall not be reproduced except/n fifll w/Ihout ~he writt I'"]~ E~mg, Inc. aul D. Smith, P.E. aior Project Engineer approval of HBO Engiaecri~ Inc. 99SS Page 1 of 1 REPORT OF DRILLED BELLED PIERS ENGINEERING, INC. 4747 Irving Boulevard, Suite 206 Dallas, Texas 75247 Project: Project No.: Coppell Business Center II Belt Line Rd. & Lakeshore Dr., Coppell, Texas 43 -2452-97 Report No.: Date of Service: Technician: Page: 9805915 02/25/98 B. Otis 1 of 3 Pier Identification A-1.5 A-2 A-2.5 A-3 A-3.5 A-4 [ A-4.5 A-5 A-5.5 Pier Diameter (in.) 28 28 28 28 28 28 28 28 28 Bell Diameter (in.) 54 60 54 60 54 60 54 60 54 Top of Pier Elevation (ft) 95.0 95.0 95.0 95.0 95.0 95.0 95.0 95.0 95.0 Req. Depth From Exist. Grade (ft) 15.0 15.0 15.0 15.0 15.0 15.0 15.0 15.0 15.0 Initial Depth of Pier From Existing Grade (ft) 15.0 15.42 15.25 15.25 15.33 15.33 15.0 15.0 15.0 Final Depth of Pier From Existing Grade (ft) 15.25 15.5 15.33 15.25 15.33 15.42 15.0 15.0 15.17 Depth From Top of Concrete (ft) 14.42 14.67 14.5 14.42 14.5 14.59 14.17 14.17 14.34 Condition of Bottom (wet or dry) Dry Dry Dry Dry Dry Dry Dry Dry Dry Plumb Within Tolerance (yes or no) Yes Yes Yes Yes Yes Yes Yes Yes A-6 A-6.5 28 28 / 95.0 95.0 15.0 15.0 15.33 15.42 15.42 15,42 14.59 14,59 Dry Dry Yes Yes t Yes Casing Diameter (in) N/A N/A N/A N/A N/A N/A N/A N/A N/A Cased Depth (ft) N/A N/A N/A N/A N/A N/A N/A N/A N/A i . N/A N/A 1 N/A N/A Reinforcing Bar Size (#) Length of Vertical Bars (ft.) Time Drilling Was Completed Time Concrete Was Placed 13.92 8:00 am 10:15 am 14.17 8:10 am 10:24 am 14.0 8:19 am 10:31 am 13.92 8:28 am ~10:39 am 14.0 8:40 am 10:47 am 14.09 8:51 am 10:55 am 6 13.67 9:03 am 11:20 am 6 13.67 9:13 am 11:27 am 13.84 9:25 am 11:35 am 14.09 9:34 am 11:44 am 14.09 9:46 am 11:53 am REPORT OF DRILLED BELLED PIERS ENGINEERI]~, INC. 4747 rv ng Boulevard Suite 206 Dallas, Texas 75247 Project: Project No.: Coppell Business Center II Belt Line Rd. & Lakeshore Dr., Coppell, Texas 43-2452-97 Report No.: 9805915 Date of Service: 02/25/98 Technician: B. Otis Page: 2 of 3 Pier Identification Pier Diameter (in.) Bell Diameter (in.) Top of Pier Elevation (ft) A-7 28 60 A-8.5 28 54 95.0 95.0 Req. Depth From Exist. Grade (ft) 15.0 15.0 Initial Depth of Pier From Existing Grade (ft) 15.33 15.58 Final Depth of Pier From Existing Grade (ft) Depth From Top of Concrete (ft) Condition of Bottom (wet or dry) Plumb Within Tolerance (yes or no) 15.33 14.5 Dry Yes N/A A-7.5 A-8 28 28 54 60 95.0 95.0 15.0 15.0 15,58 15,67 15.58 15.75 14.75 14,92 Dry Dry Yes Yes N/A N/A Casing Diameter (in) 15.58 14.75 Dry Yes N/A A-9 28 60 95.0 15.0 15.0 15.17 14.34 Dry Yes N/A A-9.5 28 54 A-10 A-10.5 28 28 60 54 F-5.5 28 54 96.0 F-5.4 95.0 95.0 95.0 15.0 15.0 15.0 15.0 16,0 15.0 15.5 15.0 15.42 16.42 15.59 Dry 15.08 14.25 Dry Yes N/A 15.5 14.67 Dry Yes N/A Yes 15.08 14.25 Dry Yes N/A N/A 28 96.0 1_5:0 15.42 14,59 Dry Yes N/A 96.0 15.0 16.0 16.0 15.17 Dry Yes N/A Cased Depth (ft) N/A Reinforcing Bar Size (#) _ Length of Vertical Bars (ft.) Time Drilling Was Completed Time Concrete Was Placed 14.0 9:54 am 12:30 pm 14.25 10:04 am 12:39 pm N/A ~ 5 14.42 10:14 am 14.25 10:23 am 13.84 10:32 am N/A 15.09 10:45 am N/A 13,75 10:54 am N/A 14.17 11:03 am N/A 2:35 pm N/A N/A 6 6 14.09 14.67 11:24am 11:36am 2:42 pm 3:45 pm 12:49 pm 1:10 pm 1:18 pm 1:27 pm 1:45 pm 2:30 pm 11:12 am 13.75 ,,~ .: o o ~' Z · o-2