Loading...
Northlake 635(3)-LR 980305REPORT OF CONCRI .E INSPECTION Date of Service: Client No.: Client: Services: 03/03/1998 52617000 Lincoln Property Company 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 Concrete inspection Report No.: 9806367 Project No.: 43-2452. Project: Coppell i Belt Lira Coppell, On this date, an HBC Engineering technician arrived at above referen~ as scheduled for concrete inspection. Placement had been reschedule, 3/04/98. Trip Charge: Minimum 2 Hours Technician: R. oy Montgomery Report Distribution: (I) Lincoln Property Company (I) City of Coppell/BIdg. lnsp. ( i ) Butler Construction ( I ) City of Coppell/Constr. lnsp. (I) O'Brien & Associates (1) AECC, Inc. This report is exclusively for the use of the client indicated above and shall not be reproduced exccpt in full without thc wr 99AK Page 1 of 1 ENGINF_ERII~, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 97 Report Date 03/05/1998 3usiness Center II I Rd. & Lakeshore Dr. Texas :ed jobsite for ~ En~-~ng, Inc. P~,ul D. Smith, P.E. Se nior Project Engineer tten approval of HBC Engineering, Inc. ' iN-PLACE DENSITY Date of Service: 02/28/1998 .r" STING Client No.: Client: Services: 52617000 Lincoln Property Company 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 In-place density testing. Report No.: 9806191 Project No.: 43-2452 Project: Coppell Belt Lit Coppell CONTRACTOR: Butler Construction PROJECT DATA Laboratory Test Method: ASTg MOISTURE DENSITY RELATIONS: Field Test Method: ASTI~ ASTg ENGINEERING, INC. 8901 Carpenter Frwy., Suite #I00 Dallas, Texas 75247 -97 Report Date 03/05/1998 Business Center II e Rd. & Lakeshore Dr. Texas i D-698 ! D-2922 l D-3017 M/D No. Description 1 Gray limestone TEST NO TEST LOCATION Building D, SE Corner 493 70' north & 60' west, Select, 1st lift 494 70' north & 120' west, Select, 1st lift 495 70' north & 180' west, Select, 1st lift 496 70' north & 240' west, Select, Ist lift 497 70' north & 300' west, Select, 1st lift 498 70' north & 360' west, Select, 1st lift 499 140' north & 370' west, Select, 1st lift 500 140' north & 310' west, Select, 1st lift 501 140' north & 260' west, Select, 1st lift 502 140' north & 200' west, Select, 1st lift 503 140' north & 140' west, Select, 1st lift 504 140' north & 60' west, Select, 1st lift Maximum Moisture % Density pcf 16.0 111.5 FIELD DENSITY TESTS M/D MOISTURE No. (%) 1 15.3 1 15.9 1 16.3 1 16.0 I 16.4 1 16.1 1 15.9 1 15.4 1 15.7 1 16.3 1 15.9 1 15.7 This report is exclusively tbr the use of the client indicated above and shall not be reproduced except in full without the w~ Project Requirements Moisture Density -2/+2% 95% DRY DENSITY DENSITY (pet) (% max) 110.5 99 109.9 99 110.1 99 109.9 99 110.3 99 110.4 99 109.9 99 110.1 99 109.8 99 110.2 99 110.3 99 110.1 99 it~en approval of HBC Engineering, Inc. 07SS Page I of 2 Report No.: TEST NO 505 506 507 508 509 510 9806193 TEST LOCATION M/D 230' north & 70' west, Select, 1st lift 230' north & 140' west, Select, 1st lift 230' north & 210' west, Select, 1st lift 230' north & 280' west, Select, 1st lift 230' north & 350' west, Select, 1st lift 230' north & 400' west, Select, 1st MOISTURE (%) 1 15.9 1 16.0 1 15.5 I 15.9 I 16.9 I 15.7 Test results on this report meet project specification. DRY DENSITY DENSITY (pcf) (% max) 109.8 99 110.3 99 109.9 99 109.6 98 110.1 99 110.4 99 Technician: Tex King Report Distribution: (!) Lincoln Property Company (1) Butler Construction (i) O'Brien & Associates (!) AECC. Inc. (I) City of Coppell/Bldg. lnsp. (I) City of Coppell/Constr. lnsp. Pa] Set This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the writl En~'~fing, Inc. fl D. Smith, P.E. ior Project Engineer ,n approval of HBC Engineering, Inc. 07SS Page 2 of 2 'IN-PLACE DENSITY STING Date of Service: Client No.: Client: Services: 02/27/1998 52617000 Lincoln Property Company 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 In-place density testing. CONTRACTOR: Butler Construction MOISTURE DENSITY RELATIONS: M/D No. 1 Gray limestone Description TEST NO Building D, 470 NW corner, 471 NW corner, 472 NW corner, 473 NW comer, 474 NW corner, 475 NW corner 476 NW corner 477 NW corner 478 NW corner 479 NW corner 480 NW corner 481 NW corner 07SS Report No.: 9806112 Project No.: 43-2452- Project: Coppell Belt Lin Coppell, PROJECT DATA Laboratory Test Method: Field Test Method: ASTM ASTM ASTM Maximum 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 97 Report Date 03/05/1998 3usiness Center II : Rd. & Lakeshore Dr. Texas D-698 D-2922 D-3017 Project Requirements Moisture % Density pcf 16.0 111.5 FIELD DENSITY TESTS TESTLOCATION Select 60' S & 50' W, 1st lift 60' S & 100' W, 1 st lift 60' S & 150' W, 1st lift 60' S & 200' W, 1 st lift 60' S & 250' W, 1 st lift 60' S & 300' W, 1st lift 60' S & 350' W, 1st lift 60' S & 400' W, 1st lift 130' S & 400' W, 1st lift 130' S & 350' W, 1st lift 130' S & 300' W, 1st lift 130' S & 250' W, 1st lift Moisture Density · 2/+2% 95% MOISTURE (./.) 1 16.1 1 16.9 1 17.0 1 16.7 1 16.9 1 16.3 1 15.9 1 16.6 1 16.3 1 16.5 1 16.6 1 16.3 DRY DENSITY DENSITY (pct) (% max) 108.3 97 108.0 97 108.9 98 108.5 97 109.0 98 108.8 98 108.3 97 108.6 97 108.7 98 108.8 98 108.5 97 108.7 98 This report is cxclusivcly for thc usc of the client indicated above and shall not bc reproduced except in full without thc wri Page 1 of 2 :ca approval of HBC Engin~ring, Inc. Report No.: 9806112 ff'~ '~ TEST NO 482 NW corner, 483 NW corner, 484 NW corner, 485 NW corner. 486 NW corner. 487 NW corner. 488 NW comer. 489 NW corner. 490 NW corner. 491 NW corner. 492 NW corner. 130' S 130' S 130'S 130' S 200' S 200' S 200' S 200' S 200' S 200' S 200' S TEST LOCATION M/D MOISTURE No. (%) 200' W, 1st lift I 16.6 150' W, 1st lift 1 · 17.1 100' W, 1st lift 1 16.5 50' W, 1st lift 1 16.3 50' W, 1st lift 1 16.6 100' W, 1st lift 1 16.5 150' W, 1st lift 1 16.9 200' W, 1st lift 1 16.3 250' W, 1st lift 1 17.1 300' W, 1st lift 1 16.3 350' W, 1st lift I 16.4 Test results on this report meet project specification. DRY DENSITY DENSITY (PC0 (% max) 108.2 97 109.2 98 107.4 96 108.3 97 108.6 97 108.2 97 106.9 96 108.2 97 108.3 97 107.9 97 108.0 97 Technician: Tex King Report Distribution: (1) Lincoln Property Company (I) Butler Construction (1) O'Brien & Associates (1) AECC, Inc. ( I ) City of Coppell/Bldg. Imp. (I) City of Coppell/Constr. Insp. Pal Sen This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the writ~ E~ring, Inc. ti D. Smith, P.E. Lot Project Engineer :n approval of HBC Engineering, Inc. 07SS Page 2 of 2 iN-PLACE DENSITY ?"* STING Date of Service: Client No.: Client: Services: 02/25/1998 52617000 Lincoln Property Company 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 In-place density testing. CONTRACTOR: Butler Construction MOISTURE DENSITY RELATIONS: M/D No. Description l Light gray, reddish and medium brown shaley clay TEST NO Building 433 Subgrade 434 Subgrade 435 Subgrade 436 Subgrade 437 Subgrade 438 S ubgrade 439 Subgrade 440 Subgrade 441 Subgrade 442 Subgrade 443 §ubgrade 0755 Report No.: 9805860 Project No.: 43-2452- Project: Coppell Belt Lin, Coppell, PROJECT DATA Laboratory Test Method: Field Test Method: ASTM ASTM ASTM Maximum 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 97 Report Date O3/05/1998 lusiness Center II Rd. & Lakeshore Dr. texas D-698 D-2922 D-3017 Project Requirements Moisture % 23.5 Density pcf 98.5 FIELD DENSITY TESTS TEST LOCATION D, NE Corner >rior to select, ~rior to select, >rior to select, >riot to select, 3riot to select, >flor to select, >rior to select, ~rior to select, >riot to select, >riot to select, >rior to select, 50' south & 50' west 50' south & 100' west 50' south & 150' west 50' south & 200' west 50' south & 250' west 50' south & 300' west 50' south & 350' west 50' south & 390' west 150' south & 400' west 150' south & 350' west 150' south & 300' west ~loisture No. MOISTURE (%) 1 25.9 1 26.1 1 26.0 1 26.3 1 25.7 1 25.9 1 25.6 1 25.9 1 27.1 1 26.7 1 26.6 in. +2% DRY DENSITY Density This report is exclusively tbr the use of the client indicated above and shall not be reproduced except in full without the writl Page 1 of 2 93% DENSITY (% max) 93.5 95 93.2 95 92.5 94 91.8 93 92.2 94 92.3 94 92.6 94 92.7 94 92.2 94 92.5 94 92.0 93 ~'n approval of HBC Engineering, Inc. Report No.: TEST NO 9805860 TEST LOCATION 444 Subgrade prior to select 445 Subgrade prior to select 446 Subgrade prior to select 447 Subgrade prior to select 448 Subgrade prior to select 449 Subgrade prior to select 450 Subgrade prior to select 451 Subgrade prior to select, 452 Subgrade prior to select, 453 Subgrade prior to select, 454 Subgrade prior to select, 455 Subgrade prior to select, 456 Subgrade prior to select, 457 Subgrade prior to select, 458 - Subgrade prior to select, 459 Subgrade prior to select, 460 Subgrade prior to select, 461 Subgrade prior to select, 462 Subgrade prior to select, 463 Subgrade prior to select, 464 Subgrade prior to select, 465 Subgrade prior to select, 466 Subgrade prior to select, 467 Subgrade prior to select, 468 Subgrade prior to select, 469 Subgrade prior to select, M/D MOISTURE No. (%) Technician: Tex King Report Distribution: (I) Lincoln Property Company (1) Butler Construction (1) O'Brien & Associates (1) AECC. Inc. 150' south & 250' west I 26.4 150' south & 200' west I 26.7 150' south & 150' west 1 25.7 150' south & 100' west 1 25.5 150' south & 50' west l 26.1 250' south & 50' west 1 26.9 250' south & 100' west 1 27.3 250' south & 150' west 1 26.7 250' south & 200' west I 26.8 250' south & 250' west 1 25.9 250' south & 300' west 1 26.1 250' south & 350' west 1 26.1 350' south & 400' west 1 26.3 _350' south & 350' west 1 25.9 350' south & 300' west 1 26.2 350' south & 250' west 1 26.9 350' south & 200' west 1 27.1 350' south & 150' west 1 25.9 350' south & 100' west 1 25.7 450' south & 50' west 1 26.1 450' south & 100' west 1 26.3 450' south & 150' west I 26.0 450' south & 200' west 1 26.2 450' south & 250' west 1 25.9 450' south & 300' west 1 25.7 450' south & 350' west 1 26.1 Test results on this report meet project specification. (I) City of Coppcll/Bldg. Insp. (I) City of Coppcll/Constr. lnsp. Pa Set This report is exclusively fur thc use of the client indicated above and shall not bo reproduced except in full without the writ~ DRY DENSITY (~0 E~ring, Inc. ~1 D. Smith, P.E. ior Project Engineer DENSITY (% max) 91.7 93 92.6 94 92.7 94 91.9 93 92.1 94 92.3 94 92.1 94 91.8 93 92.7 94 91.8 93 92.6 94 92.3 94 92.5 94 92.2 94 92.4 94 92.5 94 92.6 94 92.2 94 92.5 94 92.1 94 92.7 94 92.6 94 92.8 94 91.9 93 91.7 93 92.2 94 cn approval of HBC Engineering, Inc. 07SS Page 2 of 2