Loading...
Northlake 635(3)-LR 980306'IN-PLACE DENSITY _ _ STING Date of Service: Client No.: Client: Services: 03/02/1998 52617000 Lincoln Property Company 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 In-place density testing. CONTRACTOR: Butler Construction MOISTURE DENSITY RELATIONS: M/D No. Description I Reddish cl sa w/clay balls 2 Gray limestone TEST NO TEST LOCATION Retest Due to Rain, Pad 511 SW comer ofjobsite, 50' E & 60' N 512 SW corner ofjobsite, 50' E & 120'N 513 SW comer ofjobsite, 50' E & 180' N 514 SW corner ofjobsite, 50' E & 240'N 515 SW corner ofjobsite, 50' E & 275' N Building A, G at Line 516 20' north of south end, Final lift 517 170' north of south end, Final lift 518 330' north of south end, Final lift Building C, G at Line 519 100' west off east end, Final lift Report No.: 9806297 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Project No.: 43-2452. Project: Coppell Belt Lin~ Coppell, PROJECT DATA Laboratory Test Method: Field Test Method: ASTM ASTM ASTM Maximum .97 Report Date 03/06/1998 Business Center II ,' Rd. & Lakeshore Dr. Texas D-698 D-2922 D-3017 Project Requirements Moisture % Density pcf 13.5 115.5 16.0 111.5 FIELD DENSITY TESTS M/D MOISTURE No. (%) 1 14.1 1 13.9 2 16.6 2 16.2 2 16.5 2 16.6 2 16.1 2 16.4 2 16.9 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the wril Moisture Density -2~2% 95% -2~2% 95% DRY DENSITY DENSITY (PCO (% max) 113.1 98 113.4 98 110.1 99 110.3 99 109.9 99 110.1 99 109.9 99 109.4 98 109.9 99 tcn approval ofHBC Enginccring, Inc. 07SS Page 1 of 2 Report No.: 9806297 TEST M/D MOISTURE NO TEST LOCATION No. (%) 520 250' west off east end, Final lift 2 16.6 521 400' west off east end, Final lift 2 16.4 522 550' west off east end, Final lift 2 16.5 523 660' west off east end, Final lift 2 16.7 Test results on this report meet project specification. DRY DENSITY DENSITY (pc0 (% max) 109.8 99 110.3 99 110.1 99 109.9 99 Technician: Tex King Report Distribution: (I) Lincoln Property Company (!) Butler Construction (l) O'Brien & Associates (I) AECC, (1) City of Coppcll/Bldg. lnsp. (I) City of Coppell/Constr. lnsp. This report is exclusively fur thc usc of thc client indicated above and shall not bc reproduced cxc~pt in full without thc writ~ Set ior Project Engineer tn approval of HBC Engineering, Inc. 07SS Page 2 of 2