Northlake 635(3)-LR 980306'IN-PLACE DENSITY _ _ STING
Date of Service:
Client No.:
Client:
Services:
03/02/1998
52617000
Lincoln Property Company
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
In-place density testing.
CONTRACTOR: Butler Construction
MOISTURE DENSITY RELATIONS:
M/D No. Description
I Reddish cl sa w/clay balls
2 Gray limestone
TEST
NO TEST LOCATION
Retest Due to Rain, Pad
511 SW comer ofjobsite, 50' E & 60' N
512 SW corner ofjobsite, 50' E & 120'N
513 SW comer ofjobsite, 50' E & 180' N
514 SW corner ofjobsite, 50' E & 240'N
515 SW corner ofjobsite, 50' E & 275' N
Building A, G at Line
516 20' north of south end, Final lift
517 170' north of south end, Final lift
518 330' north of south end, Final lift
Building C, G at Line
519 100' west off east end, Final lift
Report No.: 9806297
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Project No.: 43-2452.
Project: Coppell
Belt Lin~
Coppell,
PROJECT DATA
Laboratory Test Method:
Field Test Method:
ASTM
ASTM
ASTM
Maximum
.97
Report Date
03/06/1998
Business Center II
,' Rd. & Lakeshore Dr.
Texas
D-698
D-2922
D-3017
Project Requirements
Moisture % Density pcf
13.5 115.5
16.0 111.5
FIELD DENSITY TESTS
M/D MOISTURE
No. (%)
1 14.1
1 13.9
2 16.6
2 16.2
2 16.5
2 16.6
2 16.1
2 16.4
2 16.9
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the wril
Moisture Density
-2~2% 95%
-2~2% 95%
DRY DENSITY DENSITY
(PCO (% max)
113.1 98
113.4 98
110.1 99
110.3 99
109.9 99
110.1 99
109.9 99
109.4 98
109.9 99
tcn approval ofHBC Enginccring, Inc.
07SS Page 1 of 2
Report No.: 9806297
TEST M/D MOISTURE
NO TEST LOCATION No. (%)
520 250' west off east end, Final lift 2 16.6
521 400' west off east end, Final lift 2 16.4
522 550' west off east end, Final lift 2 16.5
523 660' west off east end, Final lift 2 16.7
Test results on this report meet project specification.
DRY DENSITY DENSITY
(pc0 (% max)
109.8 99
110.3 99
110.1 99
109.9 99
Technician: Tex King
Report Distribution:
(I) Lincoln Property Company
(!) Butler Construction
(l) O'Brien & Associates
(I) AECC,
(1) City of Coppcll/Bldg. lnsp.
(I) City of Coppell/Constr. lnsp.
This report is exclusively fur thc usc of thc client indicated above and shall not bc reproduced cxc~pt in full without thc writ~
Set ior Project Engineer
tn approval of HBC Engineering, Inc.
07SS Page 2 of 2