Loading...
Northlake 635(3)-LR 980310CONCRETE COMPRY' IVE STRENGTH Date of Service: Client No.: Client: ! 02/09/1998 52617000 Lincoln Property Company 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 Report No.: 9804555 Project No.: 43-2452. Project: Coppell Belt Lin. Coppell, Services: Obtain samples of fresh concrete at the placement locations, perform requin compressive strength samples.** SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer Concrete PLANT: 22 SPECIFICATION REQUIREMENTS STRENGTH: 3500 psi ~ 28 Days 4-6" N/A ASTM C-143 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: F/2 PROJECT DATA CONCRETE CLASS: 9337 PLACEMENT DAT~: 02/09/1998 TIME SAMPLED: 2:50 pm BY: D WEATHER CONDmONS: TEMPERATURE (F) - AIR TRUCK NO: 760 AIR CONTENT (%): N/A PLACEMENT LOCATION: Piers Warm, C] 60 F c( TICKE UNI CYLINDER MARKED SET NO. MEASURED SLUMP (inches) 1 1 5.00 1 2 5.00 1 3 5.00 1 4 5.00 Technician time on report REPORT OF TESTS MAXIMUM DATE AGE LOAD TESTED (days) 0b~. force) 02/16/1998 7 107170 02/16/1998 7 108080 Average 03/09/1998 28 150360 03/09/1998 28 151870 Average 9804554. AC( Technician: Del Ratliff Report Distribution: (1) Lincoln Property Company (1) Butler Construction (1) O'Brien & Associates (l) AECC, Inc. Started: Finished: I~~ (1) City ofCoppell/Bldg, lusp. (I) City ofCoppell/Constr. Insp. This report is exclusively for thc usc of thc client indicated above and shall not bc reproduced except in full without thc writ 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 03/10/1998 97 3usiness Center II : Rd. & Lakeshore Dr. Texas ;d field test and cast BATCH TIME: 2:15 pm el Ratliff ear, windy )NCRETE: 68 F rno: 637039 rWEIGHT (pc0: N/A .'UMULATIVE YARDS: 10 ;OMPRESSIVE STRENGTH (mi) 3790 3820 3810 5320 5370 5350 FRACI~RE TYPE Vice President en approval of HBC Engineering, Inc. 01AK Page I of 1