Northlake 635(3)-LR 980310CONCRETE COMPRY' IVE STRENGTH
Date of Service:
Client No.:
Client:
!
02/09/1998
52617000
Lincoln Property Company
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Report No.: 9804555
Project No.: 43-2452.
Project: Coppell
Belt Lin.
Coppell,
Services: Obtain samples of fresh concrete at the placement locations, perform requin
compressive strength samples.**
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 22
SPECIFICATION REQUIREMENTS
STRENGTH: 3500 psi ~ 28 Days
4-6"
N/A
ASTM C-143
ASTM C- 172
ASTM C-39
SAMPLE LOCATION: F/2
PROJECT DATA
CONCRETE CLASS: 9337
PLACEMENT DAT~: 02/09/1998
TIME SAMPLED: 2:50 pm BY: D
WEATHER CONDmONS:
TEMPERATURE (F) - AIR
TRUCK NO: 760
AIR CONTENT (%): N/A
PLACEMENT LOCATION:
Piers
Warm, C]
60 F c(
TICKE
UNI
CYLINDER
MARKED
SET NO.
MEASURED
SLUMP
(inches)
1 1 5.00
1 2 5.00
1 3 5.00
1 4 5.00
Technician time on report
REPORT OF TESTS
MAXIMUM
DATE AGE LOAD
TESTED (days) 0b~. force)
02/16/1998 7 107170
02/16/1998 7 108080
Average
03/09/1998 28 150360
03/09/1998 28 151870
Average
9804554.
AC(
Technician: Del Ratliff
Report Distribution:
(1) Lincoln Property Company
(1) Butler Construction
(1) O'Brien & Associates
(l) AECC, Inc.
Started: Finished: I~~
(1) City ofCoppell/Bldg, lusp.
(I) City ofCoppell/Constr. Insp.
This report is exclusively for thc usc of thc client indicated above and shall not bc reproduced except in full without thc writ
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
03/10/1998
97
3usiness Center II
: Rd. & Lakeshore Dr.
Texas
;d field test and cast
BATCH TIME: 2:15 pm
el Ratliff
ear, windy
)NCRETE: 68 F
rno: 637039
rWEIGHT (pc0: N/A
.'UMULATIVE YARDS: 10
;OMPRESSIVE
STRENGTH
(mi)
3790
3820
3810
5320
5370
5350
FRACI~RE
TYPE
Vice President
en approval of HBC Engineering, Inc.
01AK Page I of 1