Loading...
Northlake 635(3)-LR 980311CONCRETE COMPRr" ,SIVE STRENGTH Date of Service: Client No.: Client: 03/03/1998 52617000 Lincoln Property Company 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 7520 !-3394 Report No.: 980636¢ Project No.: 43-2452 Project: Coppell Belt Lin. Coppell, Services: Obtain samples of fresh concrete at the placement locations, perform requir compressive strength samples.** SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer Concrete PLANT: 22 SPECIFICATION REQUIREMENTS STRENGTH: 3500 psi ~ 28 Days 4" N/A ASTM C-143 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: F-9.9, F-9.5. F-9 PROJECT DATA CONCRETE CLASS: 9337 PLACEMENT OATE: 03/03/1998 TIME SAMPLED: 9:32 am BY: l~ WEATHER CONDITIONS: Clear, cc TEMPERATURE (F) - AIR 48 F C, TRUCK NO: 730 TICKE AIR CONTENT (%): N/A UNI PLACEMENT LOCATION: Piers on Building B CYLINDER MEASURED MARKED SLUMP SET NO. (inches) 1 I 6.00 1 2 6.00 I 3 6.00 I 4 6.00 REPORT OF TESTS MAXIMUM DATE AGE LOAD TESTED (days) (lbs. force) 03/10/1998 7 114190 03/10/1998 7 117910 Average 03/31/1998 28 03/31/1998 28 AC Technician: Brian Otis Report Distribution: ( I ) Lincoln Property Company ( 1 ) Bntler Construction (1) O'Brien & Associates (1) AECC, Inc. Started: Finished: (l) City of Coppell/Bldg. lnsp. ( l ) City of Coppcll/Constr. Insp. This report is exclusively tbr the use of the client indicated above and shall not be reproduced except in full without the wi ENGINEERil~, INC. 89Ol Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 03/11/1998 -97 Business Center II : Rd. & Lakeshore Dr. Texas ed field test and cast BATCH TIME: 9:00 am rian Otis ol )NCRETE: 60 F rNO: 651450 T WEIGHT (pcf): N/A UUMULATIVE YARDS: 2OMPRESSIVE STRENGTH (psi) 4040 4170 4110 10 FRACTURE TYPE ~ Harbour Vice President ten approval of HBC Engineering, Inc. 01AK Page I of I