Loading...
Northlake 635(3)-LR 980312CONCRETE COMPI SSIVE STRENGTH TEb'r Date of Service: Client No.: Client: Services: 03/04/1998 Report No.: 980646 52617000 Project No.: 43-245: Lincoln Property Company 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 Project: Coppel Belt Lil Coppel Obtain samples of fresh concrete at the placement locations, perform requi corn pressive strength samples. ** SLUMP: AIR: TEST METItOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer Concrete PLANT: 22 SPECIFICATION REQUIREMENTS STRENGTm 4000 psi ~ 28 Days 5" N/A ASTM C- 143 ASTM C-172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9349 PLACEMENT DATE: 03/04/1998 TIME SAMPLED: 11:07 am BY: WEATHER CoNorrIONS: Cloudy TEMPERATURE (F} - AIR 62 F TRUCK NO: 846 TICK AIR CONTENT (%): N/A v~ PLACEMENT LOCATION: Piers, Building B SAMPLE LOCATION: 11-E.5, 1 I-F, 10.5-F CYLINDER MEASURED MARKED SLUMP DATE SET NO. (inches) TESTED I 1 5.75 03/11/1998 I 2 5.75 03/11/1998 1 3 5.75 04/01/1998 ! 4 5.75 04/01/1998 REPORT OF TESTS MAXIMUM AGE LOAD (days) (lbs. force) 7 114920 7 113530 Average 28 28 Al Technician time on report 9806468. Technician: Brian Otis Report Distribution: (I) Liucoln Property Company (I) Butler Construction ( I ) O'Brien & Associates ( I ) AECC. Inc. Started: (I) City of Coppell/Bldg. Insp. (1) City of Coppell/Constr. lnsp. Finished: 9 ~,-97 ENGINEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 03/12/1998 Business Center II le Rd. & Lakeshore Dr. Texas ed field test and cast BATCH TIME: 10:33 am 5rian Otis windy :ONCRETE: 70 F :~T NO: 651626 IT WEIGHT (pcf): N/A .~CUMULATIVE YARDS: COMPRESSIVE STRENGTH (psi) 4060 4010 4040 I0 FRACTURE TYPE This report is exclusively fbr the use of the client indicated above and shall not be reproduced except in full without the wr Vice President tten approval of HBC Engineering, Inc. 01AK Page 1 ofl CONCRETE COMPRi SSIVE STRENGTH TES f Date of Service: Client No.: Client: 02/11/1998 52617000 Lincoln Property Company 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 Report No.: 980477, Project No.: 43-2452 Project: Coppell Belt Lin Coppell Services: Obtain samples of fresh concrete at the placement locations, perform reqm~ compress ive strength samples.* * SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer Concrete PLANT: 22 SPECIFICATION REQUIREMENTS STRENGTH: 3500 psi ~ 28 Days 4-6" N/A ASTM C-143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9337 PLACEMENT DATE: 02/11/1998 TIME SAMPLED: 10:00 am BY: WEATHER CONDITIONS: Warm, TEMPERATURE (F) - AIR 56 F TRUCK NO: 512 TICm AIR CONTENT (%): N/A UN PLACEMENT LOCATION: Piers SAMPLE LOCATION: 1/6 CYLINDER MARKED SET NO. MEASURED SLUMP (inches) I 1 5.00 l 2 5.00 1 3 5.00 1 4 5.00 Technician time on report REPORT OF TESTS MAXIMUM DATE AGE LOAD TESTED (days) (lbs. force) 02/18/1998 7 64400 02/18/1998 7 65420 Average 03/11/1998 28 112600 03/11/1998 28 114210 Average 9804773. A( Technician: Del Ratliff Report Distribution: (I) Lincoln Property Company ( 1 ) Butler Construction (t) O'Brien & Associates (1) AECC. Inc. Started: Finished: (I) City of Coppell/Bldg. Insp. ( l ) City of Coppell/Constr. Insp. This report is exclusively/hr the use of the client indicated above and shall not be reproduced except in full without the wr -97 ENGINF_ERI~, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 03/12/1998 Business Center II e Rd. & Lakeshore Dr. Texas 'ed field test and cast BATCHTIME: 9:10 am )el Ratliff artly cloudy, windy ONCRETE: 68 F :TNO: 637173 [T WEIGHT (pc0: N/A iCUMULATIVE YARDS: 20 COMPRESSIVE STRENGTH (psi) 2280 2310 2300 3980 4040 4010 FRACTURE TYPE Engin c. Eugen Vice President tten approval of HBC Engineering, Inc. 01AK Page 1 of I '- REPORT OF DRILLL' PIER INSPECTION 99M~ Date of Service: 03/03/1998 Client No.: 52617000 Client: Lincoln Property Company 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 Services: Drilled pier inspection Report No.: 98063 Project No.: 43-24~ Project: Coppe Belt D Coppe On this date, an HBC Engineering technician arrived at the above re jobsite as scheduled for drilled pier inspection. See attached she recorded data. NOTE: Final depth from existing grade depending on water table and/or depth to bearing stratum. Technician time: 6:30 am to 6:00 pm Technician: Brian Otis Report Distribution: (1) Lincoln Prop~ty Cam~my (1) Buf~ Cc~Cmc[ic~ (1) O'Bn'm & A~xiates (I) AECC, Inc. (1) City ff Cq~pdl/Bldg. Imp. (1) City ffCoppell/Cen~. Insp. This report is exclusively t~' the use of the client indicated above and d~a!! net be reproduced ~eept in full without the w~ Page 1 of I 8901 Carpentmr Frwy., SuRe #100 Dallas, Texas 75247 55 Report Date 03/12/1998 ;2-97 Business Center il ~e Rd. & Lakeshore Dr. Il, Texas lng, Inc. 'aul D. Smith, P.E. mior Proje~ Engineer en approval ofHBC gnginearing. Inc. ferenced ets for n,' LU ILl LLI 0 0 LU LU LLI LU 0 W ~ 0 O0 ~ 0 Z O. IN-PLACE DENSITY fiSTING 8901 Carpenter Frwy. Suite #100 Dallas, Texas 75247 Date of Service: Client No.: 03/03/1998 52617000 Report No.: Project No.: 43-2452 .97 Report Date 03/12/1998 Client: Services: Lincoln Property Company 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 In-place density testing. CONTRACTOR: Butler Construction MOISTURE DENSITY RELATIONS: M/D No. Description 1 Gray limestone Project: Coppell Belt Lit Coppell TEST NO TEST LOCATION Bldg A, E half, SE Corner 524 Final; 40'W + 60'N 525 Final, 40'W + 120~N 526 Final, 40'W + 180~N 527 Final, 40'W + 240~ 528 Final, 40'W + 300'N 529 Final, 40'W + 340~ 530 Final, 40'W + 400~ 531 Final, 40'W + 420'N Technician: Tex King Report Distribution: (1) Lincoln Property Company (I) Butler Construction (1) O'Brien & Associates (!) AECC, Inc. PROJECT DATA Laboratury Test Method: AST]~ Field Test Method: Maximum Moisture % Density pcf 16.0 111.5 ASTI~ ASTI~ FIELD DENSITY TESTS M/D MOISTURE No. (%) 1 17.3 1 17.9 1 17.5 1 17.6 1 16.9 1 16.7 1 17.1 1 17.2 Test results on this report meet project specification. (1) City ofCoppellfBldg, lnsp. (1) City of Coppell/Conslx. lnsp. P~ This report is exclusively for the use of thc client indicated above and shall not be reproduced except in full without the wn Business Center II ~e Rd. & Lakeshore Dr. Texas D-698 [D-2922 D-3017 Project Requirements Moisture Density +/-2% 95% DRY DENSITY DENSITY ~c0 (% ma~ 109.4 98 108.8 98 109.2 98 108.0 97 110.3 99 108.5 97 109.0 98 108.8 98 ~ En~'~ing, Inc. lul D. Smith, P.E. nior Project Engineer tten approval of HBC Engineering, Inc. 07MP Page 1 of I