Loading...
Northlake 635(3)-LR 980313REPORT OF DRILLLo PIER INSPECTION Date of Service: 03/04/1998 Client No.: 52617000 Client: Lincoln Property Company 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 Services: Drilled pier inspection Report No.: 98064~ Project No.: 43-245 Project: Coppel Belt Li Coppel On this date, an HBC Engineering technician arrived at the above re jobsite as scheduled for drilled pier inspection. See attached she recorded data. NOTE: Final depth from existing grade depending on water table and/or depth to bearing stratum. Technician time: 6:30 am to 4:00 pm ~8 2-97 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 03/13/1998 1 Business Center Il ae Rd. & Lakeshore Dr. I, Texas ferenced ~ts for Technician: Brian Otis Report Distribution: (1) Lincoln Propesty C~mpany (1) Butl~ C~mttuai~ (1) Oq~rim & (1) AEC_X:, (0 c~y ~ Coppemm~, O) cit~ o~Co~e~/c~. ~. This repot is exclusively for the use o~lhc client indicated above and ~,.ll uot bo reproduced except in ~ without the writ~ H~ E~g, Inc. aul D. Smith, P.E. a Jot Project Engineer approval ofliBC rmginee~in8. In~ 99M~ Page 1 of 1 REPORT OF DRILLED BELLED PIERS Project: Project No.: Coppell Business Center II Belt Line Road and Lakeshore Drive 43-2452-97 8901 Carpenter Fray,, Suite #100 Dallas, Texas 75247 Report No.: 9806468 Date of Service: 03/04/98 lechnieian: B. Otis Paga: 1 of 2 Pier Identification 11-A 10.9-E 11-E.5 11-F 10.5-F 10-E.9 6.5-3.9 6-F 5.5-E.9 1-F 1.1-E Pier Diameter (in.) 24 18 24 24 24 18 18 24 18 24 18 Bell Diameter (in.) 54.0 36.0 60.0 60.0 60.0 36.0 36.0 60.0 36.0 60.0 36.0 Top of Pier Elevation (fi) 95.0 97.5 96.0 96.0 96.0 97.5 97.5 96.0 97.5 96.0 97.0 Req. Depth From Exist. Grade (ft) Initial Depth of Pier From Existing Grade (fi) Final Depth of Pier From Existing _ Grade (fi) Depth From Top of Concrete (ft) Condition of Bottom (wet or dry) Plumb Within Tolerance (yes or no) 15.0 15.58 15.83 14.83 Dry Yes 15.0 15.42 15.58 12.58 Dry Yes 15.0 15.83 15.83 14.83 Dry Yes 15.0 15.83 16.0 15.0 Dry Yes 15.0 15 15.0 14.0 Dry Yes 15.0 15.5 15.67 12.67 Dry Yes 15.0 16.42 16.42 13.42 Dry Yes 15.0 15.0 15.0 14.0 Dry Yes 15.0 16.75 16.92 13.92 Dry Yes 15.0 16.0 16.0 15.0 Dry Yes 15.0 15.0 15.42 12.42 Dry Yes Casing Diameter (in) N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A Cased Depth (fi) N/A N/A N/A N/A N/A N/A NIA N/A N/A N/A N/A 6 13.5 13.5 07:30 AM 12.08 10:42 AM Reinforcing Bar Size (#) Length of Vertical Bars (ff.) 13.42 Time Drilling Was Completed 12.17 10:32 AM 6 14.5 14.5 08:26 AM 14.33 12.92 09:32 AM 14.33 07:58 AM 4 6 11.92 10:51 AM 08:41 AM 11:03 AM 09:40 AM 11:14 AM Time Concrete Was Placed 12:48 PM 01:30 PM 11:00AM 11:06AM 11:14 AM 01:39 PM 01:45 PM 12:30 PM 01:58 PM 12:38 PM 02:15 PM LLI W ILl C~ n IN-PLACE DENSITY 5 ESTING Date of Service: Client No.: Client: Services: 03/04/1998 52617000 Lincoln Property Company 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 In-place density testing. CONTRACTOR: Butler Construction MOISTURE DENSITY RELATIONS: M/D No. 1 Gray Limestone Description TEST NO TEST LOCATION Building Pad, SE corner 532 50' W & 40' N, final lift 533 50' W & 80' N, final lift 534 50' W & 120' N, final lift 535 50' W & 160' N, final lift 536 50' W & 200' N, final lift 537 50' W & 250' N, final lift 538 100' W & 240' N, final lift 539 100' W & 200' N, final lift 540 100' W & 160' N, final lift 541 100' W & 120' N, final lift 542 100' W & 80' N, final lift 543 100' W & 40' N, final lift Report No.: 980649! Project No.: 43-2452.97 prOject: Coppell Belt Lin Coppell 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 03/13/1998 PROJECT DATA Laboratory Test Method: ASTI~ Field Test Method: Moisture Maximum Density pcf ASTI~ ASTI~ 16.0 111.5 FIELD DENSITY TESTS M/D MOISTURE No. (%) Business Center II e Rd. & Lakeshore Dr. Texas D-698 D-2922 D-3017 Project Requirements Moisture Density +/-2% 95% 1 17.1 1 16.8 1 16.9 1 17.3 1 17.1 1 16.4 I 16.6 1 16.2 1 16.9 1 16.7 1 16.5 1 17.1 This report is exclusively Ibr the use of the client indicated above and shall not be reproduced except in full without the wr DRY DENSITY DENSITY (pet) (% max) 108.7 98 109.4 98 109.7 98 108.6 97 109.2 98 109.4 98 109.7 98 109.3 98 110.1 99 109.4 98 109.9 99 108.9 98 tten approval of HBC Engineering, Inc. 07AK Page 1 of 2 Report No.: TEST NO 544 545 546 547 548 549 55O 9806499 TEST LOCATION M/D MOISTURE No. (%) 150' W & 20' N, final lift 150' W & 60' N, final lift 150' W & ! 00' N, final lift 150' W & 140' N, final lift 150' W & 180' N, final lift 150' W & 210' N, final lift 150' W & 260' N, final lift I 17.2 1 16.5 1 16.9 1 16.6 I 16.1 1 17.0 1 16.3 Test results on this report meet project specification. DRY DENSITY DENSITY (pc0 (% max) 109.2 98 109.4 98 109.2 98 109.4 98 109.9 99 108.7 98 109.2 98 Technician: Tex King Report Distribution: (l) Lincoln Property Company (l) Butler Construction (I) O'Brien & Associates (I) AECC, Inc. (1) City of Coppcll/Bldg. lnsp. (1) City of Coppell/Constr. lnsp. P~ This report is exclusively tbr the use of the client indicated above and shall not be reproduced except in full without the wril ring, Inc. ul D. Smith, P.E. flor Project Engineer ten approval of HBC Engineering, Inc. 07AK Page 2 of 2 CONCRETE COMPRESSIVE STRENGTH TES'F Date of Service: Client No.: Client: Services: 03/05/1998 Report No.: 9806: 52617000 Project No.: 43-245~ .97 Lincoln Property Company 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 Project: Coppell Belt Lit Coppell Obtain samples of fresh concrete at the placement locations, perform requi compressive strength sam pies.** SLUM'P: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer Concrete PLANT: 22 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi ~ 28 Days 5" N/A ASTM C- 143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9349 PLACEMENT DATE: 03/05/1998 TIME SAMPLED: I l' 17 am BY: WEATHER CONDITIONS: Cloudy TEMPERATURE (F) o AIR 68 ~ c TRUCK NO: 85 8 TICK! AIR CONTENT (%): N/A UN PLACEMENT LOCATION: Piers on Building C SAMPLE LOCATION: 7-0.9, 7-0.5, 7-0, 7-N.6 CYLINDER MEASURED MARKED SLUMP DATE SET NO. (inches) TESTED I I 6.25 03/12/1998 ! 2 6.25 03/12/1998 REPORT OF TESTS I 3 6.25 04/02/1998 28 I 4 6.25 04/02/1998 28 MAXIMUM AGE LOAD (days) (lbs. force) 7 104810 7 108100 Average AC Note: 3500 psi mix is required; 4000 psi mix used. Technician time On report 9806577. Technician: Brian Otis Started: Finished: ~ Report Distribution: l\ (1) Lincoln Property Company ( l ) City of Coppell/Bldg. Insp. (1) Butler Construction (1) City ofCoppell/Constr, lnsp. (1) O'Brien & Associates (I) AECC. Inc. This report is exclusively tbr the use of the client indicated above and shall not be reproduced except in full without the writ 01AK Page 1 of I ENGINEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 03/16/1998 Business Center II .e Rd. & Lakeshore Dr. Texas ed field test and cast BATCHTIME: 10:18 am ~rian Otis windy ONCRETE: 70 F rTNO: 651812 IT WEIGHT (pcl): N/A CUMULATIVE YARDS: ~OMPRESSIVE STRENGTH (psi) 3710 3820 3770 10 FRACTURE TYPE Engineer' , Inc. ~gene Harbour Vice President cn approval of HBC Engineering, Inc.