Northlake 635(3)-LR 980316CONCRETE COMPRESSIVE STRENGTH TEST
Date of Service: 03/05/1998
Client No.: 52617000
Client: Lincoln Property Company
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Report No.: 9806552
Project No.: 43-2452
Project: Coppell
Belt Lin
Coppell,
Services: Obtain samples of flesh concrete at the placement locations, perform requn
compressive strength samples.**
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 22
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi ~ 28 Days
4"
N/A
ASTM C- 143
ASTM C- ! 72
ASTM C-39
SAMPLE LOCATION:
Line lC, 3 fi. north
PROJECT DATA
CONCRETE CLASS: 9349
PLACEMENT DAT~: 03/05/1998
TIME SAMPLED: 6:20 am BY:
WEATHER CONDITIONS: Cloudy
TEMPERATURE (F) - AIR 46 F
TRUCKNO: 730 TICm
AIR CONTENT (%): N/A UN
PLACEMENT LOCATION:
Slab-on-grade, Building C floor, lines 1-3, A
CYLINDER
MARKED
SET NO.
REPORT OF TESTS
MEASURED MAXIMUM
SLUMP DATE AGE LOAD
(inches) TESTED (days) (lbs. force)
1 I 5.00 03/12/1998 7 88050
I 2 5.00 03/12/1998 7 85970
Average
I 3 5.00 04/02/1998 28
1 4 5.00 04/02/1998 28
A(
Note: After the tag pour, Uncompacted soil was put down from line
This report is exclusively tbr the use of thc client indicated above and shall not be reproduced except in full without the v
01AK Page I of 8
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
03/16/1998
-97
Business Center II
~ Rd. & Lakeshore Dr.
Texas
ed field test and cast
BATCH TIME: 5:45 am
ack Farris
windy
ONCRETE: 60 F
:TNO: 651739
IT WEIGHT (pc0: N/A
:CUMULATIVE YARDS: 260
COMPRESSIVE
STRENGTH
(psi)
3110
3040
3080
FRACTURE
TYPE
-3, G-N.
itten approval of HBC Engineering, Inc.
CONCRETE COMPRkSSIVE STRENGTH TES'F
Date of Service:
Client No.:
Client:
Services:
03/05/1998
52617000
Lincoln Property Company
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Report No.:
Project No.:
Project:
SLUMP:
AIR:
TEST METltOD:
ENGINEERING, INC.
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
43-2452197 03/16/1998
/
Coppell IBusiness Center II
Belt Lin% Rd. & Lakeshore Dr.
Coppell, Texas
Obtain samples of fresh concrete at the placement locations, perform requi~
compress ive strength samples.**
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 22
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi ~ 28 Days
4"
N/A
ASTM C- 143
ASTM C- 172
ASTM C-39
SAMPLE LOCATION: Line 3E, 5 ft. south
MEASURED
SLUMP
(inches)
PROJECT DATA
CONCRETE CX~SS: 9349
PLACEMENT DATE: 03/05/1998
TIME SAMPLED: 7:00 am BY: J
WEATHER CONDITIONS: Cloudy,
TEMPERATURE (F) - AIR 50 F C
TRUCK NO: 756 TICKt
AIR CONTENT (%): N/A UN
PLACEMENT LOCATION:
See page I
REPORT OF TESTS
MAXIMUM
DATE AGE LOAD
TESTED (days) (lbs. force)
AC
CYLINDER
MARKED
SET NO.
2 1 5.00 03/12/1998 7 94500
2 2 5.00 03/12/1998 7 92470
Average
2 3 5.00 04/02/1998 28
2 4 5.00 04/02/1998 28
Note: See page 1
This report is exclusively for the usc of the client indicated above and shall not be reproduced except in full without the wri
01AK Page 2 of 8
ed field test and cast
BATCH TIME: 6:00 am
~tck Farris
~vindy
DNCRETE: 62 F
NO: 651744
WEIGHT (pcO: N/A
CU~C,.n,AmmVE YARDS: 310
EOMPRESSIVE
STRENGTH
(psi)
3340
3270
3310
FRACTURE
TYPE
Zen approval of HBC Engineering, Inc.
CONCRETE COMPR ;sSIVE STRENGTH TEST
Date of Service: 03/05/1998 Report No.:
Client No.: 52617000 Project No.:
Client: Lincoln Property Company Project:
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
980655
43-245:
Coppel
Belt Li~
Coppel
Services: Obtain samples of fresh concrete at the placement locations, perform requi
compressive strength samples.**
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 22
SPECIFICATION REQUIREMENTS "
STRENGTH: 4000 psi ~ 28 Days
4"
N/A
ASTM C- 143
ASTM C- ! 72
ASTM C-39
PROJECT DATA
CONCRETE CLASS: 9349
PLACEMENT DATE: 03/05/1991
TIME SAMPLED: 8:46 am BY:
WEATHER CONDITIONS: Cloudy
TEMPERATURE (F) - AIR 59 F ~
TRUCK NO: 803 TICK
AIR CONTENT (%): N/A u~
PLACEMENT LOCATION:
See page 1
SAMPLE LOCATION: Line 1G, 7 ft. N & 2 ft. W
CYLINDER MEASURED
MARKED SLUMP DATE
SET NO. (inches) TESTED
3 I 5.00 03/12/1998
3 2 5.00 03/12/1998
REPORT OF TESTS
MAXIMUM
AGE LOAD
(days) (lbs. force)
7 93240
7 91910
Average
3 3 5.00 04/02/1998 28
3 4 5.00 04/02/1998 28
A~
Note: See page 1
This report is exclusively tbr the use of the client indicated above and shall not be reproduced except in full without the w
01AK Page 3 of 8
ENGINEERING, INC.
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
-97
Report Date
03/16/1998
Business Center II
he Rd. & Lakeshore Dr.
Texas
ed field test and cast
BATCH TIME: 8:20 am
rack Farris
?ONCRETE: 70 V
ST NO: 651768
!IT WEIGHT (pcf): N/A
~CUMULATIVE YARDS: 430
COMPRESSIVE
STRENGTH
(psi)
3300
3250
3280
itten approval of HDC Engineering, Inc.
CONCRETE COMPRt ,SSIVE STRENGTH TESf
Date of Service:
Client No.:
Client:
Services:
03/05/1998 Report No,: 9806552
52617000 Project No.: 43-2452
Lincoln Property Company
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Project: Coppell
Belt Lin.
Coppell,
Obtain samples of fresh concrete at the placement locations, perform requir
compressive strength samples.**
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 22
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi ~ 28 Days
4"
N/A
ASTM C- 143
ASTM C- 172
ASTM C-39
PROJECT DATA
CONCRETE CLASS: 9349
PLACEMENT DATE: 03/05/1998
TIME SAMPLED: 9:55 am BY: Ji
WEATHER CONDITIONS: Cloudy
TEMPERATURE (F) - AIR 60 V C~
TRUCK NO: 860 TICKE
AIR CONTENT (%): N/A UNI
PLACEMENT LOCATION:
See page 1
SAMPLE LOCATION: Line 3H, 2 ft. west
CYLINDER MEASURED
MARKED SLUMP DATE
SET NO. (inches) TESTED
4 I 4.00 03/12/1998
4 2 4.00 03/12/1998
REPORT OF TESTS
MAXIMUM
AGE LOAD
(days) (lbs. force)
7 127930
7 126990
Average
4 3 4.00 04/02/1998 28
4 4 4.00 04/02/1998 28
AC
Note: See page 1
This report is exclusively tbr the use of the client indicated above and shall not be reproduced except in full without the wri
01AK Page 4 of 8
ENGINEERING, 1NC.
8901 Carpenter Frwy., Suite 11100
Dallas, Texas 75247
Report Date
03/16/1998
.97
Business Center II
~ Rd. & Lakeshore Dr.
Texas
ed field test and cast
BATCH TIME: 9:21 am
tek Farris
)NCRETE: 79 F
rNO: 651789
T WEIGHT (pcf): N/A
CUMULATIVE YARDS:
UOMPRESSIVE
STRENGTH
(psi)
4520
4490
4510
550
ten approval of HBC Engineering, Inc.
CONCRETE COMPRLSSIVE STRENGTH TES£
Date of Service: 03/05/1998 Report No.:
Client No.: 52617000 Project No.:
Client: Lincoln Property Company Project:
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
980655.'
43 -2452
Coppell
Belt Lin
Coppell,
Services: Obtain samples of fresh concrete at the placement locations, perform rcquit
compressive strength samples.**
SLUMP:
AIR:
TEST METHOD:
CONTaACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLA~rr: 22
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi ~ 28 Days
4"
N/A
ASTM C- 143
ASTM C- 172
ASTM C-39
SAMPLE LOCATION:
Line 2I, 2 ft. west
PROJECT DATA
CONCRETE CL.4.~: 9349
PLACEMENT DATE: 03/05/1998
TIME SAMPLED: 10:58 am BY: J
WEATHER CONDITIONS: Cloudy
TEMPERATUR~ (F) - AIR 61 F C
TRUCK NO: 752 TICI~
AIR CONTENT (%): N/A UN:
PLACEMENT LOCATION:
See page 1
REPORT OF TESTS
CYLINDER MEASURED MAXIMUM
MARKED SLUMP DATE AGE LOAD
SET NO. (inches) TESTED (days) (lin. force)
5 1 4.00 03/12/1998 7 117240
5 2 4.00 03/12/1998 7 119550
Average
5 3 4.00 04/02/1998 28
5 4 4.00 04/02/1998 28
AC
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the wri
01AK Page 5 of 8
8901 Carpenter Frwy. Suite #100
Dallas, Texas 75247
Report Date
03/16/1998
-97
Business Center II
~ Rd. & Lakeshore Dr.
Texas
ed field test and cast
BATCHTIME: 10:30 am
~ck Farris
DNCRETE: 72 F
NO: 651805
WEIGHT (PC0: N/A
:UMULATIVE YARDS: 650
:OMPRESSIVE
STRENGTH
(psi)
4150
4230
4190
FRACTURE
TYPE
,'ten approval of HBC Engin~ring, Inc.
CONCRETE COMPRI JSSIVE STRENGTH TES'F
Date of Service:
Client No.:
Client:
Services:
03/05/1998
52617000
Lincoln Property Company
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Report No.: 9806551
Project No.: 43-245~
Project: Coppell
Belt Li~
Coppell
Obtain samples of fresh concrete at the placement locations, perform requi~
compressive strength samples.**
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 22
SPECIFICATION REQUIREMENTS
STRENGTa: 4000 psi ~ 28 Days
4"
N/A
ASTM C- 143
ASTM C- 172
ASTM C-39
SAMPLE LOCATION:
Line 3K, 2 ft. south
PROJECT DATA
CONCm~TE CLASS: 9349
PLACEMENT DATE: 03/05/1998
TIME SAMPLED: 12:15 pm BY:
WEATHER CONDITIONS: Cloudy
TEMPERATURE (F) - AIR 60 F C
TRUCK NO: 849 TICKi
AIR CONTENT (%): N/A UN
PLACEMENT LOCATION:
See page I
REPORT OF TESTS
CYLINDER MEASURED MAXIMUM
MARKED SLUMP DATE AGE LOAD
SET NO. (inches) TESTED (days} (lbs. force)
6 1 4.00 03/12/1998 7 118710
6 2 4.00 03/12/1998 7 118000
Average
6 3 4.00 04/02/1998 28
6 4 4.00 04/02/1998 28
A(
Note: See page t
This report is exclusively tbr the use of the client indicated above and shall not be reproduced except in full without the wri
01AK Page 6 of 8
ENGINEF_RI/~, INC.
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
03/16/1998
.97
Business Center II
e Rd. & Lakeshore Dr.
Texas
ed field test and cast
BATCHTIME: 12:00 pm
ack Farris
windy
ONCRETE: 79 F
:TNO: 651828
IT WEIGHT (pc0: N/A
CUMULATIVE YARDS: 760
COMPRESSIVE
STRENGTH
(psi)
4200
4170
4190
tten approval of HBC Engineering, inc.
CONCRETE COMPRESSIVE STRENGTH TEST
Date of Service:
Client No.:
Client:
Services:
03/05/1998 Report No.: 980655
52617000
Project No.: 43-245~
Lincoln Property Company
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Project: Coppell
Belt Lin,
Coppell,
Obtain samples of fresh concrete at the placement locations, perform requir
compressive strength samples.**
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 22
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi ~ 28 Days
4"
N/A
ASTM C-143
ASTM C- 172
ASTM C-39
SAMPLE LOCATION: Line IL
CYLINDER
MARKED
SET NO.
MEASURED
SLUMP
(inches)
PROJECT DATA
CONCRETE CLASS: 9349
PLACEMENT DAT~: 03/05/1998
TIME SAMPLED: 1: 15 pm BY: J~
WEATHER CONDITIONS: Cloudy
TEMPERATURE (F) - AIR 60 F C~
TRUCK NO: 858 TICKE
AIR CONTENT (%): N/A UNI
PLACEMENT LOCATION:
See page I
REPORT OF TESTS
MAXIMUM
DATE AGE LOAD
TESTED (days) (lbs. force)
7 I 4.00 03/12/1998 7 106230
7 2 4.00 03/12/1998 7 108610
Average
7 3 4.00 04/02/1998 28
7 4 4.00 04/02/1998 28
Note: See page 1
ACI
This report is exclusively tbr the use of the client indicated above and shall not be ~eproduced except in full without the writ
01AK Page 7 of 8
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247.
Report Date
03/16/1998
-97
Business Center II
~ Rd. & Lakeshore Dr.
Texas
~d field test and cast
BATCH TIME: 12:35 pm
tek Farris
)NCRETE: 75 F
rNO: 651844
rWEIGHT(pe0: N/A
~UMULATIVE YARDS: 850
2OMPRESSIVE
STRENGTH
(psi)
3760
3840
3800
en approval of HBC Engineering, Inc.
CONCRETE COMPRLSSIVE STRENGTH TES £
Date of Service: 03/05/1998
Report No.: 9806552
Client No.: 52617000 Project No.:
Client: Lincoln Property Company Project:
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
43-2452
Coppell
Belt Lin
Coppell:
Services: Obtain samples of fresh concrete at the placement locations, perform requn
compressive strength samples.**
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 22
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi ~ 28 Days
PROJECT DATA
CONCRETE CLASS: 9349
PLACEMENT DATE: 03/05/1998
TIME SAMPLED: 2:55 pm BY:
WEATHER CONDITIONS: Cloudy
TEMPERATURE (F) - AIR 60 F C
.97
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
03/16/1998
Business Center II
e Rd. & Lakeshore Dr.
Texas
ed field test and cast
BATCH TIME: 2:35 pm
ack Farris
ONCRETE: 75 F
SLUMP:
AIR:
TEST METHOD:
SAMPLE LOCATION:
N/A
ASTM C- 143
ASTM C- t 72
ASTM C-39
Line 2P, I ft. south
CYLINDER
MARKED
SET NO.
MEASURED
SLUMP
(inches)
8 1 4.25
8 2 4.25
8 3 4.25
8 4 4.25
Note: See page 1
Technician: Jack Farris
Report Distribution:
(I) Lincoln Property Company
(I) Butler Construction
{I) O'Brien & Associates
(I) AECC, Inc.
DATE
TESTED
03/12/1998
03/12/1998
TRUCKNO: 802
AIR CONTENT (%): N/A
PLACEMENT LOCATION:
See page 1
REPORT OF TESTS
MAXIMUM
AGE LOAD
(days) (lbs. force)
7 115760
7 116300
04/02/1998 28
04/02/1998 28
TICK[
UN
A£
Average
Started: 5:30 am Finished: 4:30 pm I'~
( l ) City of Coppell/Bldg. insp.
(l) City of Coppell/Constr. lnsp.
TNO: 651863
it WEIGHT (pc0: N/A
CUMULATIVE YARDS: 920
COMPRESSIVE
STRENGTH
(psi)
4090
4110
This report is exclusively tbr the use of the client indicated above and shall not be reproduced except in full without the wt
4100
FRACTURE
TYPE
.- Engi
]ugene Harbour
Vice President
[ten approval of HBC Engineering, Inc.
01AK Page 8 of 8