Loading...
Northlake 635(3)-LR 980317Date of Service: Client No.: Client: 03/06/1998 52617000 Lincoln Property Company 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 Report No.: 980663g Project No.: 43-2452 Project: Coppell Belt Lin Coppell, Services: Obtain samples of fresh concrete at the placement locations, perform requit compressive strength samples.** SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer Concrete PLANT: 22 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi ~ 28 Days 4" N/A ASTM C- 143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9349 PLACEMENT DATE: 03/06/1998 TIME SAMPLED: 4:45 am BY: J WEATHER CONDITIONS: Cold TEMPERATURE (F) - AIR 37 F C TRUCK NO: 736 T~CK~ AIR CONTENT (%): N/A UN PLACEMENT LOCATION: Slab-on-grade, Building C floor, lines 5-7, A-. SAMPLE LOCATION: Line 6A REPORT OF TESTS CYLINDER MEASURED MAXIMUM MARKED SLUMP DATE AGE LOAD SET NO. (inches) TESTED (days) (lbs. force) 1 1 4.50 03/13/1998 7 101480 1 2 4.50 03/13/1998 7 103550 Average I 3 4.50 04/03/1998 28 1 4 4.50 04/03/1998 28 · A( Note: Uncompacted soil was placed at lines 5 & 6, D-E. This report is exclusively tbr the usc of the client indicated above and shall not be reproduced except in full without the wr 01AK Page I of 6 ENGINEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 -97 Report Date 03/17/1998 Business Center II ~ Rd. & Lakeshore Dr. Texas ed field test and cast BATCH TIME: 4:15 am ~ck Farris ONCRETE: 60 TNO: 651906 [TWEIGHT(pcO: N/A 2UMULATIVE YARDS: COMPRESSIVE STRENGTH (psi) 3590 3660 3630 50 FRACTURE TYPE ttten approval of HBC Engineering, Inc. Date of Service: Client No.: Client: Services: 03/06/1998 Report No.: 980663~ 52617000 Project No.: 43-2452 Lincoln Property Company 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 Project: Coppell Belt Lin, Coppell, Obtain samples of fresh concrete at the placement locations, perform requir compressive strength samples.** SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer Concrete PLANT: 22 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi ~ 28 Days 4" N/A ASTM C- 143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9349 PLACESm~rr DATE: 03/06/1998 TIME SAMPLED: 5:20 am BY: Jl WEATHER CONDITIONS: Cold TEMPERATURE (F} - AIR 37 TRUCK NO: 5 12 TICKE Am CONTENT (%): N/A UNI PLACEMENT LOCATION: See page 1 SAMPLE LOCATION: Line 5B, 2 ft. N & 2 ft. E CYLINDER MARKED SET NO. REPORT OF TESTS MEASURED MAXIMUM SLUMP DATE AGE LOAD (inches) TESTED (days) (lbs. force) 2 1 4.50 03/13/1998 7 107590 2 2 4.50 03/13/1998 7 106690 Average 2 3 4.50 04/03/1998 28 2 4 4.50 04/03/1998 28 AC This report is exclusively tbr the use of the client indicated above and shall not be reproduced except in full without the writ 01AK Page 2 of 6 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 03/17/1998 .97 BUsiness Center II ~ Rd. & Lakeshore Dr. Texas ~d field test and cast BATCH TIME: 5:00 am tek Farris )NCRETE: 60 NO: 651916 'WEIGHT (pc0: N/A UUMULATIVE YARDS: ~OMPRESSIVE STRENGTH (psi) 3800 3770 3790 150 FRACTURE TYPE :eh approval of HBC Engineering, Inc. CONCRETE COMPR . SIVE STRENGTH TE Date of Service: 03/06/1998 Report No.: Client No.: 52617000 Project No.: Client: Lincoln Property Company Project: 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 980663~ 43-2452 Coppell Belt Lin Coppeil, Services: Obtain samples of fresh concrete at the placement locations, perform requil compressive strength samples.** SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer Concrete PLANT: 22 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi ~ 28 Days 4" N/A ASTM C- 143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9349 PLACEME~rr DATE: 03/06/1998 TIME SAMPLED: 6:47 am BY: J WEATHER CONDITIONS: Cold, wi TEMPERATURE (F) - AIR 42 F C TRUCK NO: 752 TICKI AIR CONTENT (%): N/A t~ PLACEMENT LOCATION: See page I SAMPLE LOCATION: Line 5D, 5 fi. N CYLINDER MARKED SET NO. REPORT OF TESTS MEASURED MAXIMUM SLUMP DATE AGE LOAD (inches) TESTED (days) (lbs. force) 3 I 4.00 03/13/1998 7 112430 3 2 4.00 03/13/1998 7 106970 Average 3 3 4.00 04/03/1998 28 3 4 4.00 04/03/1998 28 A£ This report is exclusively tbr the use of thc client indicated above and shall not be reproduced except in full without thc wr 01AK Page 3 of 6 -97 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 03/17/1998 Business Center II ~ Rd. & Lakeshore Dr. Texas ed field test and cast BATCH TIME: 6:02 am ~ck Farris ady DNCRETE: 62 F TNO: 651926 :r WEm~rr (pc0: N/A CUMULATIVE YARDS: 250 COMPRESSIVE STRENGTH (psi) 3980 3780 3880 FRACTURE TYPE tten approval of HBC Engineering, Inc. CONCRETE COMPP SIVE STRENGTH TES' f ENGINEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 ' Date of Service: Client No.: Client: 03/06/1998 52617000 Lincoln Property Company 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 Report No.: 98~ Report Date 03/17/1998 Project No.: 1 Project: Coppell ]Business Center II Belt Lin~ Rd. & Lakeshore Dr. CoppellJ Texas Services: Obtain samples of flesh concrete at the placement locations, perform requir compressive strength samples.** SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer Concrete PLANT: 22 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi ~ 28 Days 4" N/A ASTM C-143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9349 PLACEMENT DATE: 03/06/1998 TIME SAMPLED: 7:55 am BY: J~ WEATHER CONDITIONS: Cold, wi: TEMPERATURE (FI - AIR 42 F C~ TRUCK NO: 1805 TICKE AIR CONTENT (%): N/A UNI PLACEMENT LOCATION: See page I SAMPLE LOCATION: Line 7E CYLINDER MARKED SET NO. REPORT OF TESTS MEASURED MAXIMUM SLUMP DATE AGE LOAD (inches) TESTED (days) (lbs. force) 4 1 5.00 03/13/1998 7 108680 4 2 5.00 03/13/1998 7 105220 Average 4 3 5.00 04/03/1998 28 4 4 5.00 04/03/1998 28 AC~ This report is exclusively tbr the use of the client indicated above and shall not be reproduced except in full without the writ~ 01AK Page 4 of 6 ed field test and cast BATCH TIME: 7:20 am tek Farris ldy }NCRETE: 62 V rNO: 651938 r WEIGHT (pc0: N/A 2UMULATIVE YARDS: 350 ~'OMPRESSIVE STRENGTH (psi) 3840 3720 3780 FRACTURE TYPE en approval of HBC Engineering, Inc. CONCRETE COMPR SIVE STRENGTH TESq Date of Service: 03/06/1998 Report No.: Client No.: 52617000 Project No.: Client: Lincoln Property Company Project: 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 980663t~ 43-2452 Coppell Belt Lin Coppell, Services: Obtain samples of fresh concrete at the placement locations, perform requir compressive strength samples.** SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer Concrete PLANT: 22 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi @ 28 Days 4" N/A ASTM C-143 ASTM C-172 ASTM C-39 PROJECT DATA CONCaET~ CLASS: 9349 PLACEMENT OATE: 03/06/}998 TIME SAMPLED: 9:15 am BY: Jl WEATHER CONDITIONS: . Cloudy, TEMPERATURE (F) - AIR 42 V C, TRUCK NO: 5 51 TICKE AIR CONTENT (%): N/A UNI PLACEMENT LOCATION: See page I SAMPLE LOCATION: Line 5G CYLINDER MARKED SET NO. REPORT OF TESTS MEASURED MAXIMUM SLUMP DATE AGE LOAD (inches) TESTED (days) (lbs. force) 5 ! 4.25 03/13/1998 7 114470 5 2 4.25 03/13/1998 7 117940 Average 5 3 4.25 04/03/1998 28 5 4 4.25 04/03/1998 28 AC, This report is exclusively tbr tile usc of thc client indicated above and shall not be reproduced except in full without thc wril 01AK Page 5 of 6 ENGINEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 -97 Report Date 03/17/1998 Business Center II .~ Rd. & Lakeshore Dr. Texas ~d field test and cast BATCH TIME: N/A tek Farris :old )NCRETE: 60 F rNo: 651955 r WEIGIrr (pc0: N/A 2UMULATIVE YARDS: 450 .'OMPRESSIVE STRENGTH (psi) 4050 4170 4110 FRACTURE TYPE en approval of HBC Engineering, Inc. CONCRETE COMPR SIVE STRENGTH TESs' Date of Service: 03/06/1998 Client No.: 52617000 Client: SLUMP: AIR: TEST METHOD: Services: Lincoln Property Company 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 Report No.: 9806639 Project No.: Project: 43-2452. Coppell Belt Lin, Coppell, Obtain samples of fresh concrete at the placement locations, perform requir compressive strength samples.** PROJECT DATA CONCRETE CLASS: 93 49 PLACEMENT DATE: 03/06/1998 TIME SAMPLED: 10:57 am BY: J,' Butler Construction Pioneer Concrete 22 WEATHER CONDITIONS: Cloudy, TEMPERATURE (F) - AIR 42 F O TRUCK NO: 806 TICKE AIR CONTENT (%): N/A UN~ PLACEMENT LOCATION: See page I CONTRACTOR: CONCRETE SUPPLIER: PLANT: SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi ~ 28 Days 4" N/A ASTM C- 143 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: Line 41, 3 ft. N REPORT OF TESTS MAXIMUM DATE AGE LOAD TESTED (days) (lbs. force) CYLINDER MEASURED MARKED SLUMP SET NO. (inches) 6 I 4.00 6 2 4.00 7 100810 7 102420 Average 6 3 4.00 6 4 4.00 03/13/1998 03/13/1998 04/03/1998 04/03/1998 Technician: Jack Farris Report Distribution: ( 1 ) Lincoln Property Company (1) Butler Construction ( l ) O'Brien & Associates (I) AECC. Inc. Started: 3:00 am (1) City of Coppell/BIdg. lnsp. (l) City of Coppell/Constr. lnsp. 28 28 Finished: 12:30 This report is exclusively tbr the use of the client indicated above and shall not be reproduced except in full without the wr AC, ENGII~F__RI/~, INC. 8901 Carpenter Frwy. Suite #100 Dallas, Texas 75247 Report Date 03/17/1998 .97 Business Center II ; Rd. & Lakeshore Dr. Texas ~d field test and cast BATCH TIME: 10:10 am Lek Farris :old )NCRETE: 65 F rNO: 651977 r WEIG~ (pcf): N/A 2UMULATIVE YARDS: 540 2OMPRESSIVE STRENGTH (psi) 3560 3620 3590 ;ugene Harbour Vice President FRACTURE TYPE approval of HBC Engineering, Inc. 01AK Page 6 of 6