Loading...
Northlake 635(3)-LR 980318CONCRETE COMPR ,SIVE STRENGTH Date of Service: 02/25/1998 Report No.: Client No.: 52617000 Project No.: Client: Lincoln Property Company Project: 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 980591~ 43-2452 Coppeli Belt Lin Coppell, Services: Obtain samples of fresh concrete at the placement locations, perform requil compressive strength samples.** PROJECT DATA SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer Concrete PLANT: 22 SPECIFICATION REQUIREMENTS STRENGTH: 3500 psi ~ 28 Days 5" N/A ASTM C- 143 ASTM C-172 ASTM C-39 SAMPLE LOCATION: A-10.5, A-10, A-9.5 CYLINDER MARKED SET NO. MEASURED SLUMP (inches) 1 1 5.75 1 2 5.75 1 3 5.75 1 4 5.75 Technician time on report TRUCK NO: 760 AIR CONTENT (%): N/A PLACEMENT LOCATION: Piers, Building B DATE TESTED 03/04/1998 03/04/1998 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 03/I 8/1998 -97 Business Center II ~ Rd. & Lakeshore Dr. Texas ed field test and east 03/25/1998 03/25/1998 9805915. CONCRETE CLASS: 9337 PLACEMENT DATE: 02/25/1998 BATCHTIME: 10:00 am TIME SAMPLED: 10:43 am BY: l~ rian Otis WEATHERCONDmONS: Cloudy, ~indy TEMPERATURE (F) - AIR 68 F C 3NCRETE: 80 F TIC~T NO: 633978 uN] T WEi~;Irr (peO: N/A Technician: Brian Otis Report Distribution: (i) Lincoln Property Company (!) Butler Construction (I} O'Brien & Associates (I) AECC, Inc. REPORT OF TESTS MAXIMUM AGE LOAD (days) (lbs. force) 01AK 7 112730 7 108670 Average 28 130450 28 133800 Average Started: Finished: I-~ (1) City of Coppeli/Bldg, lnsp. (1) City of Coppell/Constr. Insp. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the w AC Page 1 of I CUMULATIVE YARDS: 10 COMPRESSIVE STRENGTH (psi) 3990 3840 3920 4610 4730 4670 Engin~ Inc. gene Harbour Vice President ten approval of HBC Engineering, Inc. CONCRETE COMPRESSIVE STRENGTH TES'F Date of Service: 02/I 2/1998 Report No.: Client No.: 52617000 Project No.: Client: Lincoln Property Company Project: 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 980489 43-245~ Coppell Belt Lit Coppell Services: Obtain samples of fresh concrete at the placement locations, perform requi compressive strength samples.** SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer Concrete PLANT: 22 SPECIFICATION REQUIREMENTS STRENGTH: 3500 psi ~ 28 Days 5" N/A ASTM C- 143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9337 PLACEMENT DATE: 02/12/1998 TIME SAMPLED: 1:00 pm BY: WEATHER CONDITIONS: TEMPERATURE (lq} - AIR TRUCK NO: 515 AIR CONTENT (%): N/A PLACEMENT LOCATION: Piers, Bldg. C Cloudy 60 F ( TICIC SAMPLE LOCATION: I-H, 1-H.25, 1-H.75 CYLINDER MEASURED MARKED SLUMP SET NO. (inches) 1 I 4.50 1 2 4.50 1 3 4.50 I 4 4.50 Technician time on report DATE TESTED 02/19/1998 02/19/1998 03/I 2/1998 03/12/1998 9804890. -97 ENGINEERING, INC. 8901 Carpenter Frwy., Suite #I00 Dallas, Texas 75247 Report Date 03/18/1998 Business Center II e Rd. & Lakeshore Dr. Texas ed field test and cast BATCH TIME: 11:53 am 5rian Otis sprinkles :ONCRETE: 66 F ~TNO: 633252 IT WEIGHT (pcf): N/A REPORT OF TESTS vamps: 40 MAXIMUM COMPRESSIVE AGE LOAD STRENGTH (day~ (Ibs.~rce) (psi) 7 102950 3640 7 106630 3770 Average 3710 28 150010 5310 28 147680 5220 Average 5270 FRACTURE TYPE Technician: Brian Otis Report Distribution: (I) Lincoln Property Company (1) Butler Construction (I) O'Brien & Associates (I) AECC. Inc. Started: (I) City of Coppell/Bldg. lnsp. (I) City of Coppell/Constr. lnsp. Finished: This report is exclusively tbr the use of the client indicated above and shall not be reproduced except in full v~ithout the v Ha~bour Vice President of HBC Engineering, Inc. 01AK Page 1 of 1 CONCRETE COMPR SIVE STRENGTH TES Date of Service: Client No.: Client: Services: CONTRACTOR: CONCRETE SUPPLIER: PLANT: SLUMP: AIR: TEST METHOD: 02/25/1998 Report No.: 980591 52617000 Project No.: 43-245'~ Lincoln Property Company 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 Project: Coppell Belt Lin Coppell Obtain samples of fresh concrete at the placement locations, perform requi~ compressive strength samples.** Butler Construction Pioneer Concrete 22 SPECIFICATION REQUIREMENTS STRENGTH: 3500 psi ~ 28 Days 5" N/A ASTM C- ! 43 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9337 PLACEMENT DATE: 02/25/1998 TIME SAMPLED: 10:43 am BY: WEATHER CONDITIONS: Cloudy.. TEMPERATURE (F) - Am 68 ~ C TRUCK NO: 760 TICK~ AIR CONTENT (%): N/A UN PLACEMENT LOCATION: Piers, Building B SAMPLE LOCATION: A-10.5, A-10, A-9.5 REPORT OF TESTS CYLINDER MEASURED MAXIMUM MARKED SLUMP DATE AGE LOAD SET NO. (inches) TESTED (days) (lbs. force) 1 1 5.75 03/04/1998 7 112730 ! 2 5.75 03/04/1998 7 108670 Average 1 3 5.75 03/25/1998 28 i 4 5.75 03/25/1998 28 Technician time on report 9805915. A£ .97 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 03/18/1998 Business Center II e Rd. & Lakeshore Dr. Texas ed field test and cast BATCHTIME: 10:00 am ;rian Otis windy DNCRETE: 80 F TNO: 633978 IT WEIGHT (pcf): N/A CUMULATIVE YARDS: COMPRESSIVE STRENGTH (psi) 3990 3840 3920 Technician: Brian Otis Started: Finished: Report Distribution: ( l ) Lincoln Property Company ( I ) City of Coppell/BIdg. Insp. ] ~uge~-e Harbour ( I ) Butler Construction ( I ) City of Coppell/Constr. Insp. ( l ) O'Brien & Associates / Vice President (I) AECC. Inc. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without thc wri~en approval of HBC 01AK Page 1 ofl 10 FRACTURE TYPE Engineering, Inc.