Loading...
Northlake 635(3)-LR 980319CONCRETE COMPI ' SIVE STRENGTH TES Date of Service: 02/10/1998 Report No.: Client No.: 52617000 Project No.: Client: Lincoln Property Company Project: 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 9804693 43-2452. Coppell Belt Lin, Coppell, Services: Obtain samples of fresh concrete at the placement locations, perform requir compressive strength samples.** SLUM.P: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer Concrete PLANT: 1575L SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi ~ 28 Days 4-6" N/A ASTM C- 143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9349 P~CEMENT DATE: 02/10/1998 TIME SAMPLED: 9:45 am BY: E WEATHER CONDITIONS: Cloudy, TEMPERATURE (F) - AIR 58 F C TRUCK NO: 802 TICKE AIR CONTENT (%): N/A UNI PLACEMENT LOCATION: Piers SAMPLE LOCATION: 0/5 CYLINDER MEASURED MARKED SLUMP SET NO. (inches) 1 I 3.50 REPORT OF TESTS MAXIMUM DATE AGE LOAD TESTED (days) (lbs. for~ce) 02/17/1998 7 154130 AC I 2 3.50 1 3 3.50 03/10/1998 28 191370 03/10/1998 28 193480 Average 9337 - 3500 Psi @ 28 days. Note: Required mix design should be Technician time on report 9804692. Technician: Del Ratliff Report Distribution: (l) Lincoln Property Company (i) Butler Construction (l) O'Brien & Associates (I) AECC, Inc. Started: Finished: H~ ( I ) City of Coppell/BIdg. Insp. (l) City of Coppell/Constr. Insp. This report is exclusively tbr thc nsc of thc client indicated above and shall not be reproduced except in full without the w~ 01AK Page 1 of I ENGINF_,FaRI/~, INC~ 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 .97 Report Date 03/19/1998 Business Center II : Rd. & Lakeshore Dr. Texas ~d field test and cast BATCHTIME: 8:44 am el Ratliff · aining, light wind )NCRETE: 67 F rNO: 635086 T WEIGHT (pc0: N/A UUMULATIVE YARDS: 2OMPRESSIVE STRENGTH (psi) 545O 6770 6840 6810 10 FRACTURE TYPE agene Harbour Vice President ten approval of HBC Engineering, Inc. -REPORT OF DRILL PIER INSPECTION Date of Service: 03/05/1998 Client No.: 52617000 Client: Lincoln Property Company 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 Report No.: 980657 Project No.: 43-245: Project: Coppell Belt Lk Coppell Services: Drilled pier inspection On this date, an HBC Engineering technician arrived at the above rel jobsite as scheduled for drilled pier inspection. See attached sheE recorded data. 8901 Carpenter Frwy., Suit~ #100 Dallas, T~xas 75247 .97 Report Date 03/19/1998 Business Center II e Rd. & Lakeshore Dr. Texas erenced ~t for Teehnldan: BI/off Ot[s Report Distribution: (1) Buffer Cce.~udicu (1) O~im & Assoc/a~ (1) AF_CC, h~ c~y ~c~ m~. cay xc~c~, m~. This rep~a,t is e~dusively for the use ~'the client indi_~___.~_ above nnd ~ n~ ~ ~ ~ h ~ ~ ~e ~ Paul D. Smith, P.E. S~ ~ior Project Engineer 99MP Page 1 of 1 REPORT OF DRILLED BELLED PIERS Project: Project No.: Coppell Business Center II, Belt Line Rd. & Lakeshore Dr. Coppell, Texas 43 -2452-97 ENGINEERING, INC. 8901 Carpenter Fr-.vy, Suite #100 Dallas, Texas 75247 Report No.: 9806577 Date of Service: 03/05/98 Technician: Brian Otis Page 1 of 4 Pier Identification Pier Diameter (in.) Bell D_ia~me_te__r_{!_n_~_) .. Top of Pier Elevation (ft) _ Req. Depth From Exist. Grade (ft) Initial Depth of Pier From Existing Grade (ft) Final Depth of Pier From Existing Grade (ft) Depth From Top of Concrete (fi) Condition of Bottom (wet or dry) Plumb Within Tolerance (yes or no) Casing Diameter (in) Cased Depth (ft) 7-P.1 24" 54 93.5 12.0 13.0 13.33 11.33 D Y 6 6 10.83 10.17 Number of Vertical Ears (ea.) Reinforcing Bar Size (#) Length of Vertical Bars (ft.) Time Drilling Was Completed Time Concrete Was Placed 7-0.9 24" 54 93.5 12.0 12.5 12.67 10.67 D Y NA NA 7-0.5 24" 6O 95.0 12.0 12.2 7-0 24" 95.0 12.0 12.0 12.17 12.08 10.17 D 10.08 D Y NA 7-N.6 24" 95.0 12.0 12.4 12.5 10.5 D Y NA NA NA NA NA NA 6 6 6 6 6 6 9.67 9.58 10.0 08:45 AM 09:00 AM 09:08 AM 09:11 AM 09:22 AM 7-N.4 7-N 24" 24" 95.0 95.0 12.0 12.0 12.0 12.0 12.25 12.17 10,25 10.17 D D Y Y NA NA NA NA 6 9.75 09:28 AM 7-M.6 24" 95.0 12.0 13.0 7-M.4 7-M 24" 24" 95.0 95.0 12.0 12.0 12.7 14.8 7-L.6 24" 54 95.0 12.0 12.0 10:30 AM 13.33 11.33 NA NA _9_.6_77 _ 10~._83 09:33 AM 09:39 AM 12.67 15.0 12.17 10.67 13.0 10.17 D D D Y Y Y NA NA NA NA NA ! NA .... 6__ ............ _~ 6 10.17 12.5 9.67 09:47 AM 09:54 AM 10:03AM 10:38AM 10:46AM 10:51 AM 11:05AM 11:13AM 11:20AM ~11:25AM 11:32AM 11:39AM 11:44AM REPORT OF DRILLED BELLED PIERS ENGINEERING, INC. 8901 Carpenter Frwy., Suite ~100 Dallas, Texas 75247 Project: Project No.: Coppell Business Center II, Belt Line Rd. & Lakeshore Dr. Coppell, Texas 43-2452-97 Report No.: 9806577A Date of Service: 03/05/98 Technician: Brian Otis Page 2 of 4 Pier Identification Pier Diameter (in.) Bell Diameter _(in.) Top of Pier Elevation (ft) 7-L.4 ! 7-L ...... _2__4'.'_ ...... t 2- 411 54 60 Req. Depth From Exist. Grade (ft) Initial Depth of Pier From Existing Grade (fi) Final Depth of Pier From Existing Grade (fi) Depth From Top of Concrete (ft) Condition of Bottom (wet or dry) Plumb Within Tolerance (yes or no) ,c.a_s!ng_. _Dj_a_ .m_et_e r {i~)_ Cased Depth (ft) Nuiiibe~ el' Vei~ica; Bara (ea.) Reinforcing Bar Size (#) Length of Vertical Bars (ft.) Time Drilling Was Completed Time Concrete Was Placed 95.0 12.0 12.42 95.0 12.0 12.58 7-K.6 7-K.4 24" 24" 54 54 95.0 95.0 12.0 12.0 12.67 12.5 7-K 24" 60 95.0 12.0 12.5 7-J.6 24" 54 95.0 12.0 13.75 7-J.4 24" 54 95.0 12.0 12.5 7-J 7-1.5 i 7-1.4 _24" 24" ; .24" 66 54 '54 95._0 .,-9~33.5_ , _93.~5 12.0 12.0 12.0 13.0 12.0 14.0 7-H.6 24" 54 93.5 12.0 12.0 12.67 12.58 10.67 10.58 D D Y Y 12.92 12.83 10.92 10.83 D D Y Y NA NA NA NA NA NA G 0 0 6 6 6 10.17 10.08 10.42 12.75 13.75 10.75 11.75 D D Y Y 12.58 13.0 10.58 11.0 D D Y NA NA 6 10.33 l_ 0_ ; l_ _2 _ _A _M 10:20AM 10:27AM 10:34AM /11:50AM 11:58 AM 01:15 PM 01:22 PM NA NA 6 10.25 10:40 AM 01:29 PM NA NA 11.25 10:50 AM 01:36 PM NA NA 6 10.08 11:40 AM 01:42 PM 12.25 14.17 10.25 12.17 10.08 D Y NA 6 D NA NA NA NA O 6 6 6 10.5 9.75 11:52AM 12:00PM 12.08 D Y NA NA 6 11.67 9.58 12:09 PM 12:18 PM 01:50 PM 02:10 PM t 02:15 PM 02:20 PM REPORT OF DRILLED BELLED PIERS ENGINEERIb~, INC. 8901 Carpenter Frwy, Suite Dallas, Texas 75247 Project: Project No.: Coppell Business Center II, Belt Line Rd. & Lakeshore Dr. Coppell, Texas 43-2452-97 Report No.: 9806577B Date of Service: 03/05/98 lechniclan: Brian Otis Page 3 of 4 Pier Identification Pier Diameter (in.) Bell Diameter (in.) Top of Pier Elevation (ft) Req. Depth From Exist. Grade (ft) 7-H.5 24" 93.5 12.0 7-H 24" 66 95.0 12.0 7-G.6 24" 54 95.0 12.0 7-G.4 24" 54 95.0 12.0 Initial Depth of Pier From Existing Grade (ft) Final Depth of Pier From Existing Grade (ft) 12.0 12.25 12.42 12.67 12.0 12.42 12.42 12.83 Depth From Top of Concrete (ft) 10.0 10.42 10.42 10.83 Condition of Bottom (wet or dry) Plumb Within Tolerance_(ye~._o_r.._n__0)- Casing Diameter (in) Cased Depth (fi) D Number of ¥'~r[iuai ~,am (ea.} Reinforcing Bar Size (#) 6 Length of Vertical Bars (ft.) D NA NA NA NA Time Drilling Was Completed Time Concrete Was Placed D NA NA 9.5 12:29 PM 02:28 PM 6 9.92 12:34 PM 02:35 PM 6 6 9.92 10.33 12:42 PM 02:46 PM 12:49 PM 02:51 PM A-1 A-1.5 24" 24" 60 66 97.5 97.5 12.0 12.0 12.0 13.42 12.25 10.25 D Y NA NA 6 9.75 01:20 PM 03:00 PM A-2 24" 66 97.5 12.0 A-2.5 A-3 24" 24" 66 66 97.5 96.0 12.0 12.0 A-3.5 A-4 24" 24" 66 66 96.0 96.O 12.0 12.0 13.67 11.67 D Y 12.0 12.0 12.0 12.42 10.0 10.42 D NA NA NA NA 6 6 6 6 11.17 9.5 01:30 PM 01:38 PM 03:08 PM 03:14 PM D Y 12.58 13.42 13.0 12.75 13.42 13.17 10.75 11.42 71_._17. NA NA 9.92 01:45 PM 03:20 PM D Y NA NA 10.25 02:01 PM 03:25 PM D Y NA NA 6 10.92 02:18 PM 03:33 PM D NA NA 6 6 10.67 02:35 PM 04:00 PM REPORT OF DRILLED BELLED PIERS Project: Project No.: Coppell Business Center II, Belt Line Rd. & Lakeshore Dr. Coppell, Texas 43-2452-97 IBC ENGINEERING, INC. 8001 Carpenter Fr, vy.. Suite ~ 100 Dallas, lexas 75247 Report No.: 9806577C Date of Service: 03/05/98 lechnician: Brian Otis Page 4 of 4 Pier Identification Pier Diameter (in.) Bell Diameter (in.) Top of Pier Elevation (ft) Req. Depth From Exist. Grade (ft) Initial Depth of Pier From Existing Grade (ft) Final Depth of Pier From Existing Grade (fi) Depth From Top of Concrete (ft) Condition of Bottom (wet or dry) Plumb Within Tolerance (yes or no) Casing Diameter (in) Cased Depth (ft) Reinforcing Bar Size (#) Length of Vertical Bars (ft.) A-4.5 A-5 A-5.5 24" 24" 24" 66 66 66 96.0 96.0 95.5 12.0 12.0 12.0 12.83 13.58 14.0 12.83 13.75 14.0 10.83 11.75 12.0 D Y D D NA Y Y NA NA NA NA NA II Time Drilling Was Completed Time Concrete Was Placed 6 6 6 10.33 02:48 PM 04:10 PM 11.25 , .0~2_;._58- PM 04:17 PM 11.5 03:11 PM . 04:24 PM 'REPORT OF DRILLE PIER INSPECTION Date of Service: 03/12/1998 Client No.: 52617000 Client: Lincoln Property Company 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 Report No.: 980710' Project No.: 43-2452 Project: Coppell Belt Lin Coppell Services: Drilled pier inspection On this date, an HBC Engineering technician arrived at the above re! jobsite as scheduled for drilled pier inspection. See attached sheE recorded data. 8901 Carpenter Frwy., Suite #100 Dallas, Tex~s 75247 97 Report Date 03/19/1998 Business Center Il ~ Rd. & Lakeshore Dr. Texas erenced t for Te~hnichn: Brian Otis Repor~ Distribution: (I) Linoom Propmy (1) Butb:r (1) AECC, ln~ O) city XCopp~tUB~, m~. City of Co~U~,~r. rasp. P; ~ repot ia ~cluaively f~the use ~the clieat indi_~___~_ above and nh.Il n~t b~ l~pvoduced ~x(x~t in full without tho writ~ f E~-~g, Inc. ~ul D. Smith, P.E. nior Project Engineer n ~oval o~ I-IB~ ~e~h~. Inc. 99MP Page 1 of 1 REPORT OF DRILLED BELLED PIERS Project: Project No.: Coppell Business Center II, Belt Line Rd. & Lakeshore Dr. Coppell, Texas 43 -2452-97 ENGINEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report No.: 9807107 Date of Service: 03/12/98 Technician: Brian Otis Page: 1 of 5 Pier Identification 5-B 5-C 5-D 5-E 5-F 5-G 5~1 Pier Diameter (in.) 24 24 24 24 24 24 24 Bell Diameter (in.) 54.0 54.0 54.0 54.0 54.0 54.0 Top of Pier Elevation (ft) 99.0 99.0 99.0 99.0 99.0 Req. Depth From Exist. Grade (ft) 14.0 14.0 14.0 14.0 14.0 Initial Depth of Pier From Existing Grade (ft) Final Depth of Pier From Existing Grade (ft) 14.0 15.0 14.0 14.0 14.17 54.0 5-J 5-K 5-L _24 _ _2~4 _24_ 54.0 54.0 54.0 99.0 14.0 99.0 14.0 15.0 6-B 54.0 14.67 95.5 14.0 10:35 AM NA NA NA NA 13.17 13.17 07:35 AM 07:49 AM 10:44 AM 10:54 AM 99.0 99.0 99.0 14.0 14.0 14.0 15.42 15.42 · 14.58 15.5 15.42 14.67 15.0 14.92 14.17 D D D Y Y Y NA NA NA NA NA NA I NA NA NA NA NA NA 6 6 6 6 6 6 14.5 14.42 13.67 13.67 14 13.5 08:00 AM 08:19AM 08:26 AM 08:37 AM 08:50 AM 09:05 AM 11:15AM 11:23AM 11:32AM 11:40AM 11:48AM 11:57AM 10:20 AM 10:26 AM Time Concrete Was Placed Length of Vertical Bars (ft.) 13 14.08 13 Time Drilling Was Completed 07:04 AM 07:12 AM 07:22 AM Y Reinforcing Bar Size (#) Casing Diameter (in) NA NA NA Cased Depth (ft) NA NA NA Y Y Y Y Y Plumb Within Tolerance (yes or no) Y 14.0 15.08 14.0 14.17 14.17 14.7 15.0 14.17 Depth From Top of Concrete (ft) 13.5 14.58 13.5 13.67 13.67 14.17 14.5 9.17 Condition of Bottom (wet or dry) D D D D D D D D 14.0 REPORT OF DRILLED BELLED PIERS Project: Project No.: Coppell Business Center II, Belt Line Rd. & Lakeshore Dr. Coppell, Texas 43 -2452-97 Report No.: Date of Service: Technician: Page: ENGINEERING, INC. 8901 Carpenter Frwy, Suite #100 Dallas, Texas 75247 9807107 03/12/98 Brian Otis 2 of 5 Pier Identification 6-C 6-D 6-E 6-F Pier Diameter (in.) _ 24 24 24 24 Bell Diameter (in.) 54.0 54.0 54.0 54.0 Top of Pier Elevation (ft) 95.5 95.5 95.5 95.5 From Exist. Grade (fi) 14.0 14.0 14.0 14.0 Initial Depth of Pier From Existing 14.42 15.0 14.0 15.25 Final Depth of Pier From Existing __Grade (ft) ~ 14.42 15.17 14.08 15.25 6-G 24 54.0 95.5 14.0 14.42 14.42 6-H 6-1 i 6-J 24 24 24 54.0 54.0 54.0 95.5 95.5 95.5 14.0 14.0 14.0 14.0 14.17 15.42 14.17 14.17 15.5 6-K 24 54.0 95.5 14.0 14.42 14.42 6-L 24 54.0 95.5 14.0 15.83 15.83 Depth From Top of Concrete (ft) Condition of Bottom (wet or dry) Plumb Within Tolerance (yes or no) Casing Diameter (in) Cased Depth (ft) 9.42 10.17 9.08 10.25 9.42 9.17 9.17 10.5 9.42 D D D D D D D D D Y Y Y Y Y Y Y Y Y NA NA NA NA NA NA 'NA NA NA 10.83 4-B 24 54.0 99.0 14.0 14.67 14.67 14.17 D D NA NA NA NA NA NA NA NA NA NA NA NA NA Reinforcing Bar Size (#) Length of Vertical Bars (ft.) Time Drilling Was Completed Time Concrete Was Placed 6 6 6 6 6 6 6 13.75 112:30 PM 14.5 13.41 14.58 13.75 13.5 13.5 09:21 AM 09:27 AM 09:33 AM 09:39 AM 09:46 AM 09:55 AM 12:37 PM 12:45 PM 12:55 PM 01:05 PM 01:14 PM / 01:22 PM / 14.83 09:59 AM 01:31 PM 13.75 10:08 AM 01:39 PM 6 6 15.16 13.67 10:18 AM 10:32 AM 01:46 PM i 01:55 PM REPORT OF DRILLED BELLED PIERS 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Project: Project No.: Coppell Business Center II, Belt Line Rd. & Lakeshore Dr. Coppell, Texas 43 -2452-97 Report No.: 9807107 Date of Service: 03/12/98 Technician: Brian Otis Page: 3 of 5 Pier Identification Pier Diameter (in.) Bell Diameter (in.) Top of Pier Elevation (ft) Req. Depth From Exist. Grade (fl) _ _ Initial Depth of Pier From Existing Grade (fl) Final Depth of Pier From Existing Grade (ft) Depth From Top of Concrete (ft) Condition of Bottom (wet or dry) Plumb Within Tolerance (yes or no) Casing Diameter '(in) Cased Depth (ft) Number ~f .... {~ ) Reinforcing Bar Size (#) Length of Vertical Bars (ft.) Time Drilling Was Completed Time Concrete Was Placed 4-C 4-d 4-E 4-F 24 24 24 24 54.0 54.0 54.0 54.0 99,0 99.0 99.0 99.0 14.0 14.0 14.0 14.0 4-G 4-1 24 24 54.0 . 5__4.0 99.0 99.0 14.0 4-J 24 54.0 99.0 14.0 14.0 14.0 15.0 14.17 15.42 14.5 14.25 14.0 15.08 14.17 15.5 14.5 13.75 13.5 14.58 13.67 15.0 14.0 D D D D D D Y Y Y Y Y Y NA NA NA N~ NA NA NA 13 10:54 AM NA NA 14.08 11:07 AM 02:44 PM G NA NA 13.25 10:44 AM 0 6 13.17 14.5 11:15 AM 02:52 PM 11:25 AM 03:03 PM 14.0 14.42 14.42 13.92 D Y NA NA 6 6 13.42 12:15 PM 03:11 PM 02:30 PM 02:36 PM NA 6 13.5 12:03 PM 03:21 PM 4-K 4-L 2-L 2-K 24 24 24 24 54.0 54.0 99.0 99.0 14.0 14.0 14.17 14.67 14.17 14.75 13.67 14.25 D D Y Y NA NA NA NA 6 6 6 6 13.17 13.75 12:14 PM 12:23 PM 03:30 PM 03:39 PM 54.0 54.0 99.0 99.0 14.0 14.0 14.08 14.67 14.17 14.67 13.67 14.17 D D Y Y NA NA NA NA 6 6 6 6 13.17 13.67 12:36 PM 12:42 PM 03:49 PM i 04:02 PM REPORT OF DRILLED BELLED PIERS ENGINEERINg, INC. 8901 Carpenter Frwy, Suite #100 Dallas, Texas 7524'/ Project: Project No.: Coppell Business Center II, Belt Line Rd. & Lakeshore Dr. Coppell, Texas 43-2452-97 Report No.: 9807107 Date of Service: 03/12/98 lechnician: Brian Otis Page: 4 of 5 Pier Identification 2-J _P_i_er Diame_ter (!n.) ....................... _2--4 Bell D_ia_me_te_r (in_.)_ Top of Pier Elevation (ft) Req. Depth From Exist. Grade (ft) Initial Depth of Pier From Existing Grade (ft) Final Depth of Pier From Existing Grade ff(~)_ Depth From Top of Concrete (ft) Condition of Bottom (wet or dry) Plumb Within Tolerance (yes or no) 54,0 2-1 24 2-G 54,0 54.0 99.0 99.0 99.0 14.0 13.75 13.83 14.0 14.0 14.0 13.5 13.33 14.0 14.08 14.17 13.67 2-F 54.0 2-E 24 2-B 54.0 99.0 3-F 54.0 99.0 99.0 14.0 2-D 2-C 24 24 54.O 54.O 99.0 99.0 14.0 14.0 24 54.0 99.0 D Y 14.0 14,58 13.25 14.0 13.5 14,67 13,25 14.25 13.58 12.75 14.17 13,75 D Y Y D Y Casing Diameter (in) 'NA NA NA NA NA NA Cased Depth (ftc) NA NA NA NA NA NA 12,25 14.0 14.0 13.83 14.83 13.83 14.83 13.33 14.33 D D Y Y NA NA NA NA 6 6 6 6 12.83 13.83 01:48 PM 01:57 PM 04:54 PM 04:59 PM 13.17 13 01:03 PM 04:22 PM 13.25 02:05 PM 05:05 PM Number of Venicai 8ars (ea.) Reinforcing Bar Size (#) 13.08 3-G 3-1 24 24 54.0 54.0 99.0 99.0 14.0 14.0 14.67 14.25 14,67 14.25 14.17 13.75 D Y NA NA 6 6 D D Y Y NA NA NA NA 12.58 02:16 PM 6 6 13.67 13.25 02:25 PM 02:38 PM 05:20 PM 05:26 PM 05:14 PM Length of Vertical Bars (ft.) 12.83 6 13,67 01:25 PM 04:38 PM Time Drilling Was Completed Time Concrete Was Placed t12~:5~1 PM 04:12 PM 01:13 PM 04:30 PM 01:40 PM 04:45 PM _) REPORT OF DRILLED BELLED PIERS Project: Project No.: Coppell Business Center II, Belt Line Rd. & Lakeshore Dr. Coppell, Texas 43-2452-97 ENGINEERING, INC. 8901 Carpenter Frwy,, Suite #100 Dallas, Texas 75247 aeport No.: 9807107 Oat, of Service: 03/12/98 Technician: Brian Otis Page: 5 of 5 Pier Identification 3-d 3-K 3-L 10-H Pier Diameter (in.) 24 24 24 24 Bell Diameter (in.) 54.0 54.0 54.0 54.0 Top of Pier Elevation (ft) 99.0 99.0 99.0 95.5 From Exist. Grade (ft) Initial Depth of Pier From Existing Final Depth of Pier From Existing 14.0 14.0 14.0 14.0 9-H 24 54.0 95.5 14.0 14,33 13.75 14.67 13.75 14.33 8-H 7-H 5-H 24 24 24 54.0 54.0 54.0 95.5 95.5 95.5 4-H 3-H 24 24 54.0 54.0 95.5 95.5 14.0 14.0 14.0 14.0 14.0 14.83 13.25 14.08 14.0 14.5 13.83 14.67 13.75 14.5 14.83 13.33 14.08 14.08 Depth From Top of Concrete (ft) 14,0 13.33 14.17 8.75 9.5 9.83 8.33 9.08 9.08 8.83 13.83 13.83 Condition of Bottom (wet or dry) D D D D D Plumb Within Tolerance (yes or no) Y Y Y Y Casin~ Diameter (in) NA NA NA' NA Cased Depth (ft) Reinforcing Bar Size (#) Length of Vertical Bars (ft.) NA NA NA NA Y NA NA D D D D D Y Y Y Y Y NA NA NA NA NA NA NA 2-H Time Drilling Was Completed Time Concrete Was Placed 13.5 02:47 PM 05:32 PM 12.83 03:02 PM 05:38 PM 13,67 03:15 PM 05:45 PM 6 6 13.08 13.83 09:10 AM 09:18 AM 01:16 PM 01:24 PM 02:15 PM 24 54.0 i 95:5 14.08 14.33 _9:_33 Y NA NA NA NA NA 6 6 6 6 6 6 14.16 12,66 13.41 13.41 13.16 13.66 09:30 AM 09:38 AM 09:47 AM 10:00 AM 10:08 AM 01:32 PM 01:40 PM 01:49 PM 02:10 PM 10:19 AM I 02:28 PM CONCRETE COMPRESSIVE STRENGTH TES'£ Date of Service: 03/04/1998 Report No.: Client No.: 52617000 Project No.: Client: Lincoln Property Company Project: 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 9806445 43-2452 Coppell Belt Lin CoppelL Services: Obtain samples of fresh concrete at the placement locations, perform requil compressive strength samples.** CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer Concrete PLANT: 22 SPECIFICATION REQUIREMENTS PROJECT DATA CONCRETE CLASS: 9349 PLACEMENT DATE: 03/04/1998 TIME SAMPLED: 4:45 am BY: WEATHER CONDITIONS: Windy, 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 -97 Report Date 03/19/1998 Business Center II ~ Rd. & Lakeshore Dr. Texas ed field test and cast BATCH TIME: 4:05 am ~ck Farris ~old STRENGTH: SLUMP: AIR: TEST METHOD: SAMPLE LOCATION: CYLINDER MARKED SET NO. 4000 psi ~ 28 Days 5" N/A ASTM C-143 ASTM C- 172 ASTM C-39 ! 0E, 2 ft. W of line E TEMPERATURE (F) - AIR 40 F CONCRETE: 62 F TRUCKNO: 1805 TICmTNO: 651548 AIR CONTENT (%): N/A t~ IT WEIGtrr (pc0: N/A PLACEMENT LOCATION: Slab-on-grade, Building A floor, lines !-11, ~ -E REPORT OF TESTS MEASURED MAXIMUM SLUMP DATE AGE LOAD (inches) TESTED (days) (lbs. force) 01 I 4.75 03/11/1998 7 103110 01 2 4.75 03/11/1998 7 106660 Average A( 01 3 4.75 04/01/1998 28 01 4 4.75 04/01/1998 28 This report is exclusively tbr the use of the client indicated above and shall not be reproduced except in full without the :CUMULATIVE YARDS: 50 COMPRESSIVE STRENGTH (psi) 3650 3770 3710 FRA~URE TYPE itten approval of HBC Engineering, Inc. 01AK Page 1 of 10 CONCRETE COMPRESSIVE STRENGTH TES £ Date of Service: Client No.: Client: 03/04/1998 52617000 Lincoln Property Company 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 Report No.: 980644: Project No.: 43-2452 Project: Coppeli Belt Lir Coppell Services: Obtain samples of fresh concrete at the placement locations, perform requi compressive strength samples.** SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer Concrete PLANT: 22 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi ~ 28 Days 5" N/A ASTM C- 143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9349 PLACEMENT DATE: 03/04/1998 TIME SAMPLED: 5:30 am BY: WEATHER CONDITIONS: Windy, TEMPERATURE (F) - AIR 48 F ( TRUCK NO: 846 TICK AIR CONTENT (%): N/A ur PLACEMENT LOCATION: See page I SAMPLE LOCATION: Line 8C, 6 ft. N & 5 ft. E CYLINDER MARKED SET NO. REPORT OF TESTS MEASURED MAXIMUM SLUMP DATE AGE LOAD (inches) TESTED (days) (lbs. force) 02 1 5.25 03/11/1998 7 106590 02 2 5.25 03/11/1998 7 102710 Average 02 3 5.25 04/01/1998 28 02 4 5.25 04/01 / 1998 28 A~ This report is exclusively tbr tile use of the client indicated above and shall not be reproduced except in full without thc v 01AK Page 2 of l0 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 -97 Report Date 03/19/1998 Business Center II e Rd. & Lakeshore Dr. Texas ed field test and cast BATCH TIME: 4:59 am ack Farris gold :ONCRETE: 69 V ~.T NO: 651557 IT WEIGHT (poD: N/A 2CUMULATIVE YARDS: COMPRESSIVE STRENGTH (psi) 3770 3630 3700 140 rittcn approval of HBC Engineering, Inc. CONCRETE COMPRESSIVE STRENGTH TES f Date of Service: Client No.: Client: 03/04/1998 52617000 Lincoln Property Company 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 Report No.: 9806445 Project No.: 43-2452- Project: Coppell Belt Lin Coppell, Services: Obtain samples of fresh concrete at the placement locations, perform requir, compressive strength samples.** SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer Concrete PLANT: 22 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi ~ 28 Days 5" N/A ASTM C- 143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCm~TE CLASS: 9349 PLACEMENT DATE: 03/04/1998 TIME SAMPLED: 6:50 am BY: J: WEATHER CONDITIONS: ' Cloudy, TEMPERATURE (F) - AIR 50 F C TRUCK NO: 373 TICKE AIR CONTENT (%): N/A UN] PLACEMENT LOCATION: See page I SAMPLE LOCATION: Line 7E, 6 ft. N & 2 ft. W CYLINDER MARKED SET NO. REPORT OF TESTS MEASURED MAXIMUM SLUMP DATE AGE LOAD (inches) TESTED (days) (lbs. force) 03 1 5.00 03/11/1998 7 95960 03 2 5.00 03/11/1998 7 92270 Average 03 3 5.00 04/01/1998 28 03 4 5.00 04/01/1998 28 Al This report is exclusively tbr the nsc of the client indicated above and shall not be reproduced except in full without the wr 01AK Page 3 of l0 ENGINEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 97 Report Date 03/19/1998 3usiness Center II :Rd. & Lakeshore Dr. Texas ~d field test and cast BATCHTIME: 6:18 am tek Farris ~indy )NCRETE: 62 V rNO: 651568 T WEIGHT (pcf): N/A 2CUMULATIVE YARDS: 23 0 UOMPRESSIVE STRENGTH (psi) 3390 3260 3330 FRACTURE TYPE ofHBC Engmccnng nc ttcn approval ' ~ CONCRETE COMPRi,J.SIVE STRENGTH TE J' Date of Service: 03/04/1998 Report No.: Client No.: 52617000 Project No.: Client: Lincoln Property Company Project: 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 980644.' 43-2452 Coppell Belt Lin Coppell Services: Obtain samples of fresh concrete at the placement locations, perform requil compressive strength samples.** SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer Concrete PLANT: 22 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi ~ 28' Days 5" N/A ASTM C- 143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9349 PLACEMENT DATE: 03/04/1998 TIME SAMPLED: 7:55 am BY: J Cloudy, WEATHER CONDITIONS: TEMPERATURE (F) -AIR 54 F 12 TRUCK NO: 730 TICm AIR CONTENT (%): N/A u~ PLACEMENT LOCATION: See page I SAMPLE LOCATION: Line 6C, 4 ft. N CYLINDER MARKED SET NO. REPORT OF TESTS MEASURED MAXIMUM SLUMP DATE AGE LOAD (inches) TESTED (days) (Ibs.~rce) 04 l 4.75 03/11/1998 7 99890 04 2 4.75 03/11/1998 7 98150 Average 04 3 4.75 04/01/1998 28 04 4 4.75 04/01/1998 28 Al This report is exclusively tbr the use of the client indicated above and shall not be reproduced except in full without the 01AK Page 4 of 10 ENGINEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 -97 Report Date 03/19/1998 Business Center II e Rd. & Lakeshore Dr. Texas ed field test and cast BATCH TIME: 7:20 am ack Farris windy ONCRETE: 65 F :TNO: 651580 IT WEIGHT (pcf): N/A ?CUMULATIVE YARDS: 340 COMPRESSIVE STRENGTH (osi) 3530 3470 3500 FRACTURE TYPE 'itten approval of HBC Engineering, Inc. CONCRETE COMPRL3SIVE STRENGTH TEb £ Date of Service: Client No.: Client: 03/04/1998 52617000 Lincoln Property Company 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 Report No.: 980644~ Project No.: 43-2452 Project: Coppell Belt Lin Coppell Services: Obtain samples of fresh concrete at the placement locations, perform requi~ compressive strength samples.** SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer Concrete PLANT: 22 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi ~ 28 Days 5" N/A ASTM C-143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9349 PLACEMErCr DATE: 03/04/1998 TIME SAMPLED: 8'.40 am BY: J Cloudy, WEATHER CONDITIONS: TEMPERATURE (F) - AIR .56 F TRUCK NO: 760 TICK] AIR CONTENT (%): N/A uN PLACEMENT LOCATION: See page I SAMPLE LOCATION: Line 5D, 3 ft. N & 3 fL E CYLINDER MARKED SET NO. REPORT OF TESTS MEASURED MAXIMUM SLUMP DATE AGE LOAD (incites) TESTED (days) (lbs. force) 05 I 4.00 03/11/1998 7 137100 05 2 4.00 03/11/1998 7 134650 Average 05 3 4.00 04/01/1998 28 05 4 4.00 04/01/1998 28 A( This report is exclusively tbr tile use of the client indicated above and shall not be reproduced except in full without the 01AK Page 5 of 10 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 .97 Report Date 03/19/1998 Business Center II e Rd. & Lakeshore Dr. Texas 'ed field test and cast BATCH TIME: 8:05 am ack Farris windy ONCRETE: 65 F :TNO: 651591 IT WEIGHT (pc0: N/A :CUMULATIVE YARDS: 440 COMPRESSIVE STRENGTH (psi) 4850 4760 4810 F~U~ T~E itten approval of HBC Engineering, Inc. CONCRETE COMPR SIVE STRENGTH TEE' Date of Service: 03/04/1998 Report No.: Client No.: 52617000 Project No.: Client: Lincoln Property Company Project: 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 980644.' 43-2452 Coppell Belt Lin CoppelL Services: Obtain samples of fresh concrete at the placement locations, perform requii compressive strength samples.** SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer Concrete PLANT: 22 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi ~ 28 Days 5" N/A ASTM C-143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9349 PLACEMENT DATE: 03/04/1998 TIME SAMPLED: 9:20 am BY: WEATHER CONDITIONS: Cloudy TEMPERATURE (F) - AIR 57 TRUCK NO: 853 TICKI AIR CONTENT (%): N/A UN PLACEMENT LOCATION: See page 1 SAMPLE LOCATION: Line 4D, 2 ft. N REPORT OF TESTS CYLINDER MEASURED MAXIMUM MARKED SLUMP DATE AGE LOAD SET NO. (inches) TESTED (days) (lbs. force) 06 1 4.25 03/11/1998 7 101670 06 2 4.25 03/11/1998 7 105840 Average 06 3 4.25 04/01/1998 28 06 4 4.25 04/01/1998 28 A( This report is exclusively tbr the use of the client indicated above and shall not be reproduced except in full without the ~ 01AK Page 6 of 10 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 03/19/1998 -97 Business Center II e Rd. & Lakeshore Dr. Texas ed field test and cast BATCH TIME: 8:45 am ack Farris windy ONCRETE: 62 F ;TNO: 651602 IT WEIGHT (pet}: N/A :CUMULATIVE YARDS: 550 COMPRESSIVE STRENGTH (psi) 3600 3740 3670 FRACTURE TYPE tten approval of HBC Engineering, Inc. CONCRETE COMPR SIVE STRENGTH Date of Service: 03/04/I 998 Report No.: Client No.: 52617000 Project No.: Client: Lincoln Property Company Project: 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 9806445 43-2452 Coppell Belt Lin Coppell: Services: Obtain samples of fresh concrete at the placement locations, perform requi~ compressive strength samples.** SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer Concrete PLANT: 22 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi ~ 28 Days 5" N/A ASTM C- 143 ASTM C- 172 ASTM Co39 PROJECT DATA CONCRETE CLASS: 9349 PLACEMEnt DATE: 03/04/1998 TIME SAMPLED: 10:55 am BY: WEATHER CONDITIONS: Cloudy TEMPERATURE (F) - AIR 59 F C TRUCKNO: 373 TICgd AIR CONTENT (%): N/A ' UN PLACEMENT LOCATION: See page I SAMPLE LOCATION: Line 4A REPORT OF TESTS CYLINDER MEASURED MAXIMUM MARKED SLUMP DATE AGE LOAD SET NO. (inches) TESTED (days) (lbs. force) 07 I 5.00 03/11/1998 7 94240 07 2 5.00 03/11/1998 7 97810 Average 07 3 5.00 04/01/1998 28 07 4 5.00 04/01/1998 28 A( This report is exclusively tbr the usc of the client indicated above and shall not be reproduced except in full without thc wr 01AK Page 7 of 10 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 -97 Report Date 03/19/1998 Business Center II ~ Rd. & Lakeshore Dr. Texas ed field test and cast BATCHTIME: 10:09 am ick Fan'is windy DNCRETE: 69 F ,TNO: 651619 ~T WEIGHT (pcf): N/A !CUMULATIVE YARDS: 640 COMPRESSIVE STRENGTH (psi) 3330 3460 3400 FRACTURE TYPE ~tten approval of HBC Engineering, Inc. CONCRETE COMPR SIVE STRENGTH TEb Date of Service: 03/04/1998 Report No.: Client No.: 52617000 Project No.: Client: Lincoln Property Company Project: 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 980644_~ 43-2452 Coppell Belt Lin CoppelL Services: Obtain samples of fresh concrete at the placement locations, perform requil compressive strength samples.** SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer Concrete PLANT: 22 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi ~ 28 Days 5" N/A ASTM C- 143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9349 PLACEMENT DATE: 03/04/1998 TIME SAMPLED: 12:05 pm BY: J WEATHER CONDITIONS: Cloudy, TEMPERATURE (F) - AIR 60 F C TRUCK NO: 730 TICK[ AIR CONTENT (%): N/A UN PLACEMENT LOCATION: See page I SAMPLE LOCATION: Line 3E CYLINDER MARKED SET NO. REPORT OF TESTS MEASURED MAXIMUM SLUMP DATE AGE LOAD (inches) TESTED (days) (lbs. force) 08 1 4.75 03/11/1998 7 114240 08 2 4.75 03/11/1998 7 117660 Average 08 3 4.75 04/01/1998 28 08 4 4.75 04/01/1998 28 A( This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the 01AK Page 8 of 10 8901 Carpenter Frwy., Suite #106 Dallas, Texas 75247 Report Date 03/19/1998 -97 Business Center II ~ Rd. & Lakeshore Dr. Texas ed field test and cast BATCH TIME: 1 1:30 am ~ck Fan-is ~vindy ~)NCRETE: 70 F TNO: 651638 X WEIGHT (pef): N/A CUMULATIVE YARDS: 750 COMPRESSIVE STRENGTH (psi) 4040 4160 4100 FRA~URE T~E tten approval of HBC Engineering, Inc. CONCRETE COMPR SIVE STRENGTH Date of Service: 03/04/1998 Report No.: Client No.: 52617000 Project No.: Client: Lincoln Property Company Project: 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 980644' 43-2452 Coppell Belt Lin Coppell: Services: Obtain samples of fresh concrete at the placement locations, perform requi~ compressive strength samples.** SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer Concrete PLANT: 22 SPECIFICATION REQUIREMENTS STRENGTm 4000 psi ~ 28 Days 5" N/A ASTM C- 143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9349 PLACEMENT DATE: 03/04/1998 TIME SAMPLED: 1:30 pm BY: J WEATHER CONDITIONS: Sunny, v TEMPERATURE (F) - AIR 61 ~ c TRUCK NO: 512 TICK~ AIR co,trENT (%): N/A UN: PLACEMENT LOCATION: . See page I SAMPLE LOCATION: Line 2A, 4 fi. E REPORT OF TESTS CYLINDER MEASURED MARKED SLUMP DATE SET NO. (inches) TESTED 09 1 5.00 03/11/1998 09 2 5.00 03/11/1998 MAXIMUM AGE LOAD (days) (lbs. force) 7 106260 7 109740 Average 09 3 5.00 04/01/1998 28 09 4 5.00 04/01/1998 28 AC This report is exclusively tbr thc use of the client indicated above and shall not be reproduced except in full without the wri 01AK Page 9 of 10 ENGINF_ERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 -97 Report Date 03/19/1998 Business Center II ~ Rd. & Lakeshore Dr. Texas ed field test and cast BATCH TIME: 12:55 pm lek Farris dndy 9NCRETE: 72 g TNO: 651656 T WEIGHT (pc0: N/A CUMULATIVE YARDS: 840 EOMPRESSIVE STRENGTH (psi) 3760 3880 3820 FRACTURE TYPE ten approval of HBC Engineering, Inc. CONCRETE COMPR r SIVE STRENGTH Date of Service: 03/04/I 998 Client No.: 52617000 Report No.: 980644.' Project No.: 43-2452-97 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 03/19/1998 Client: Lincoln Property Colnpany Project: 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 Services: SLUMP: AIR: TEST METHOD: Coppell Belt Lin CoppelL Obtain samples of fresh concrete at the placement locations, perform requil compressive strength samples.** Butler Construction Pioneer Concrete 22 CONTRACTOR: CONCRETE SUPPLIER: PLANT: SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi ~ 28 Days 5" N/A ASTM C- 143 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: Line ID, 5 ft. N CYLINDER MEASURED MARKED SLUMP DATE SET NO. (inches) TESTED 10 i 5.00 03/I 1/1998 10 2 5.00 03/11/1998 10 3 5.00 04/01/1998 10 4 5.00 04/01/1998 PROJECT DATA CONCRETE CLASS: 9349 PLACEMENT DATE: 03/04/1998 TIME SAMPLED: 2:40 pm BY: J WEATHER CONDITIONS: Sunny, ¥ TEMPERATURE (F)- AIR 61 F ¢ TRUCK NO: 1805 TICK[ AIR CONTENT (%): N/A UN: PLACEMENT LOCATION: See page ! REPORT OF TESTS MAXIMUM AGE LOAD (days) (lbs. force) Note: Between lines 2 & 3 and D & E, rutting added, plus additional reinforcing steel. Started: 3:00 am ( I ) City of Coppell/Bldg. lnsp. (I) City of Coppell/Constr. lnsp. Technician: Jack Farris Report Distribution: (I) Lincoln Property Company (I) Butler Construction (I) O'Brien & Associates (I) AECC. Inc. 7 90800 7 89730 Average 28 28 A£ occurred. Uncompacted Finished: 4:00 pm H~ Business Center II e Rd. & Lakeshore Dr. Texas ed field test and cast BATCHTIME: 2:10 pm ick Farris Andy DNCRETE: 76 F TNO: 651673 . iT WEIGHT (pcf): N/A CUMULATIVE YARDS: 930 COMPRESSIVE STRENGTH (psi) 3210 3170 3190 soil was This report is exclusively lbr the use of the client indicated above and shall not be reproduced except in full without the wr :~ugene Harbour Vice President FRACTURE TYPE approval of HBC Engineering, Inc. 01AK Page 10 of 10 CONCRETE COMP SIVE STRENGTH Date of Service: 02/16/1998 Report No.: Client No.: 52617000 Project No.: Client: Lincoln Property Company Project: 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 9805121 43-2452 Coppell Belt Lit Coppell Services: Obtain samples of fresh concrete at the placement locations, perform requi compressive strength samples.** SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer Concrete PLANT: 22 SPECIFICATION REQUIREMENTS STRENGTH: 3500 psi ~ 28 Days 5" N/A ASTM C- 143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9337 PLACEMENT DATE: 02/16/1998 TIME SAMPLED: 10:55 am BY: WEATHER CONDITIONS: ' Cloudy TEMPERATURE (F) - AIR 53 F TRUCK NO: 841 TICI~ AIR CONTENT (%): N/A tm PLACEMENT LOCATION: Piers, Building A SAMPLE LOCATION: C-2. C-3, C-4 CYLINDER MEASURED MARKED SLUMP SET NO. (inches) I 1 4.75 I 2 4.75 1 3 '4.75 I 4 4.75 Technician time on report REPORT OF TESTS MAXIMUM DATE AGE LOAD TESTED (days) (lbs. force) 02/23/1998 7 103540 02/23/1998 7 105500 Average 03/16/1998 28 153290 03/16/1998 28 150540 Average 9805119. Technician: Brian Otis Report Distribution: (I) Lincoln Property Company (I) Butler Construction (I) O'Brien & Associates (I) AECC. Inc. Started: Finished: (I) City ofCoppcll/Bldg, lnsp. (I) City ofCoppcll/Constr. Insp. This report is exclusively tbr the use of the client indicated above and shall not be reproduced except in full without the w~ 97 ENGINEERII~, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 03/19/1998 Business Center II e Rd. & Lakeshore Dr. Texas ed field test and cast BATCHTIME: 10:05 am grian Otis drizzle iONCRETE: 68 F ;TNO: 633493 1T WEIGIIT (pet): N/A ?CUMULATIVE YARDS: 30 COMPRESSIVE STRENGTH (psi) 3660 3730 3700 5420 5320 5370 Eugene Harbour Vice President itten approval of HBC Engineering, Inc. 01AK Page I of 1