Northlake 635(3)-LR 980320REPORT OF REPORt"OF DRILLED BELLE IERS
Date of Service:
Client No.:
Client:
Services:
03/13/1998
52617000
Lincoln Proper~y Company
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Drilled pier inspection
Report No.: 98072
Project No.: 43-245
Project: Coppell
Belt Lk
Coppell
On this date, an HBC
jobsite as scheduled
recorded data.
Engineering technician arrived at the above fei
for drilled pier inspection. See attached shee
Technician time: 6:00 am to 4:00 pm
T~..hnldan: Brian
Repo~ Dis~Fibuflon:
(1) Lincoln P~p~y Company
(1) Bmla-
(1) 0~ & ~
(1) ~cc, m~
(1) City of C-.~ppcll/Bld~. Insp.
(1) City of coppelFC~tr. Insp.
.97
8901 Carpenter Frwy., S~te #100
Dallas, T--9~ 75247
Report Date
03/20/1998
Business Center I1
e Rd. & Lakeshore Dr.
Texas
~renced
t for
[ -~ ~eering,
Pa
Tiffs report/s ~cludvely fc~ ihe use c/'the climt ind/caled above and shall not be reproduced except in full wlthout the wr/lle~
al D. Smith, P.E.
ior Project Engineer
~proval ofHBC Eng/neer/ng, Inc.
99M~ Page 1 of 1
REPORT OF DRILLED BELLED PIERS
Project:
Project No.:
Coppell Business Center II, Belt Line Rd. & Lakeshore Dr.
Coppell, Texas
43 -2452-97
ENGINEERING, INC.
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report No.: 9807218
Date of Service: 03/13/98
Technician: Brian Otis
Page: 1 of l
Pier Identification
Pier Diameter (in.)
1-B
24
1-B.4
24
Bell Diameter (in.) 54.0 54.0
1-B.6 1-C
24 24
54.0 60.0
1-C.4
24
54.0
1-C.6
24
54.0
1-D
24
60.0
1-D.4
24
54.0
Top of Pier Elevation (ft)
93.5
95.0
95.0
95.0
95.0
95.0
95.0
95.0
1-D.6 1-E
24 i 24
54.0 160.0
95.0 ! 95.0
Req. Depth From Exist. Grade (ft)_
Initial Depth of Pier From Existing
Grade (ft)
Final Depth of Pier From Existing
_ Grade (fi)
Depth From Top of Concrete (ft)
Condition of Bottom (wet or dry)
Plumb Within Tolerance (yes or no)
Casing Diameter (in)
Cased Depth (ft)
Number of Vertical Bars (ea.)
Reinforcing Bar Size (#)
12.0
14.0
14.17
12.57
D
Y
NA
NA
6
12.0
13.5
13.5
12.0
D
Y
NA
12.0
12.75
12.75
11.25
D
Y
NA
12.0
12.0
12.08
10.58
Y
NA
13.0 12.42
13.0 12.5
11.5 11.0
D D
Y Y
NA NA
NA NA
6 6
6 6
12.0 12.0 12.0
14.08
14.17
12.67
D
Y
NA
NA
6
6
11.0
12:45 PM
02:40 PM
14.0 12.17
14.0 12.25
12.5 10.75
D D
Y Y
NA NA
NA NA
6 6
6 6
6
NA
NA
NA
Length of Vertical Bars (ft.)
Time Drilling Was Completed
Time Concrete Was Placed
12.07
11:30AM
02:10 PM
11.5
11:36 AM
02:18 PM
10.75
11:42 AM
02:23 PM
10.08
11:52 AM
02:32 PM
12.0 12.0 12.0
12.08
12,25
10.75
D
Y
NA
NA
6
6
10.5 12.17 12.0 10.25 ' 10.25
12:56 PM 01:10 PM 01:19 PM 01:28 PM 01:38 PM
03:05 PM 03:13 PM 03:20 PM 03:28 PM 03:37 PM