Loading...
Northlake 635(3)-LR 980320REPORT OF REPORt"OF DRILLED BELLE IERS Date of Service: Client No.: Client: Services: 03/13/1998 52617000 Lincoln Proper~y Company 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 Drilled pier inspection Report No.: 98072 Project No.: 43-245 Project: Coppell Belt Lk Coppell On this date, an HBC jobsite as scheduled recorded data. Engineering technician arrived at the above fei for drilled pier inspection. See attached shee Technician time: 6:00 am to 4:00 pm T~..hnldan: Brian Repo~ Dis~Fibuflon: (1) Lincoln P~p~y Company (1) Bmla- (1) 0~ & ~ (1) ~cc, m~ (1) City of C-.~ppcll/Bld~. Insp. (1) City of coppelFC~tr. Insp. .97 8901 Carpenter Frwy., S~te #100 Dallas, T--9~ 75247 Report Date 03/20/1998 Business Center I1 e Rd. & Lakeshore Dr. Texas ~renced t for [ -~ ~eering, Pa Tiffs report/s ~cludvely fc~ ihe use c/'the climt ind/caled above and shall not be reproduced except in full wlthout the wr/lle~ al D. Smith, P.E. ior Project Engineer ~proval ofHBC Eng/neer/ng, Inc. 99M~ Page 1 of 1 REPORT OF DRILLED BELLED PIERS Project: Project No.: Coppell Business Center II, Belt Line Rd. & Lakeshore Dr. Coppell, Texas 43 -2452-97 ENGINEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report No.: 9807218 Date of Service: 03/13/98 Technician: Brian Otis Page: 1 of l Pier Identification Pier Diameter (in.) 1-B 24 1-B.4 24 Bell Diameter (in.) 54.0 54.0 1-B.6 1-C 24 24 54.0 60.0 1-C.4 24 54.0 1-C.6 24 54.0 1-D 24 60.0 1-D.4 24 54.0 Top of Pier Elevation (ft) 93.5 95.0 95.0 95.0 95.0 95.0 95.0 95.0 1-D.6 1-E 24 i 24 54.0 160.0 95.0 ! 95.0 Req. Depth From Exist. Grade (ft)_ Initial Depth of Pier From Existing Grade (ft) Final Depth of Pier From Existing _ Grade (fi) Depth From Top of Concrete (ft) Condition of Bottom (wet or dry) Plumb Within Tolerance (yes or no) Casing Diameter (in) Cased Depth (ft) Number of Vertical Bars (ea.) Reinforcing Bar Size (#) 12.0 14.0 14.17 12.57 D Y NA NA 6 12.0 13.5 13.5 12.0 D Y NA 12.0 12.75 12.75 11.25 D Y NA 12.0 12.0 12.08 10.58 Y NA 13.0 12.42 13.0 12.5 11.5 11.0 D D Y Y NA NA NA NA 6 6 6 6 12.0 12.0 12.0 14.08 14.17 12.67 D Y NA NA 6 6 11.0 12:45 PM 02:40 PM 14.0 12.17 14.0 12.25 12.5 10.75 D D Y Y NA NA NA NA 6 6 6 6 6 NA NA NA Length of Vertical Bars (ft.) Time Drilling Was Completed Time Concrete Was Placed 12.07 11:30AM 02:10 PM 11.5 11:36 AM 02:18 PM 10.75 11:42 AM 02:23 PM 10.08 11:52 AM 02:32 PM 12.0 12.0 12.0 12.08 12,25 10.75 D Y NA NA 6 6 10.5 12.17 12.0 10.25 ' 10.25 12:56 PM 01:10 PM 01:19 PM 01:28 PM 01:38 PM 03:05 PM 03:13 PM 03:20 PM 03:28 PM 03:37 PM