Northlake 635(3)-LR 980321CONCRETE COMPRESSIVE STRENGTH Date of Service: 02/18/1998 Report No.: Client No.: 52617000 Project No.: Client: Lincoln Property Company Project: 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 Services: Obtain samples of fresh concrete at the placement locations, perform requil compressive strength samples.** SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer Concrete PLANT: 22 SPECIFICATION REQUIREMENTS STRENGTH: 3500 psi ~ 28 Days 5" N/A ASTM C- 143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCm~TE CLASS: 9337 PLACEMENT ~)ATE: 02/18/1998 TIME SAMPLED: 12:24 pm BY: WEATHER CONDITIONS: Clear, TEMPERATURE (F) - AIR 63 TRUCKNO: 736 TICKI AIR CONTENT (%): N/A UN PLACEMENT LOCATION: Piers, Building A SAMPLE LOCATION: Piers A/9, A-9.5, A-10 CYLINDER MARKED SET NO. MEASURED SLUMP (inches) 1 1 5.00 I 2 5.00 ! 3 5.00 I 4 5.00 Technician time on report REPORT OF TESTS MAXIMUM DATE TESTED 02/25/1998 02/25/1998 03/18/1998 03/18/1998 985315. AGE LOAD (days) (Ibs.~rce) 7 105250 7 103550 Average 28 144380 28 143890 Average ENGINEERINg, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 980531( Report Date 03/21/1998 43-2459,97 Coppell Business Center II Belt Lin e Rd. & Lakeshore Dr. Coppell: Texas ed field test and cast BATCH TIME: 11:45 am ;rian Otis lid F CONCRETE: 64 F TNO: 633579 IT WEIGHT (pcO: N/A A( CUMULATIVE YARDS: 30 COMPRESSIVE STRENGTH (psi) 3720 3660 3690 5110 5090 5100 FRACTURE TYPE Technician: Brian Otis Report Distribution: (1) Lincoln Property Company (1) Butler Construction (l) O'Brien & Associates (1) AECC, Inc. 01AK Started: (l) City of Coppell/BIdg. Insp. (I} City ofCoppell/Constr. Insp. Finished: g, Inc. This report is exclusively tbr the use of the client indicated above and shall not be reproduced except in full without the wt Page 1 of 1 ~ugene Harbour Vice President ~ten approval of HBC Engineering, Inc. CONCRETE COMPR .3SIVE STRENGTH Date of Service: 03/11/1998 Report No.: Client No.: 52617000 Project No.: Client: Lincoln Property Company Project: 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 Services: SLUMP: AIR: TEST METHOD: 980699] 43-2452 Coppell Belt Lin Coppell, Obtain samples of fresh concrete at the placement locations, perform requi~ compressive strength samples.** Butler Construction Pioneer Concrete 22 CONTRACTOR: CONCRETE SUPPLIER: PLANT: SPECIFICATION REQUIREMENTS STRENGTH: 3500 psi ~ 28 Days 5" N/A ASTM C-143 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: 9-C, 9-D, 9-E PROJECT DATA CONCRETE CLASS: 9337 PLACEMENT DATE: 03/11/1998 TIME SAMPLED: 1 .'48 pm BY: [ CYLINDER MARKED SET NO. WEATHER CONDITIONS: Clear, TEMPERATURE (F) - AIR 50 F TRUCK NO: 756 TICKI AIR CONTENT (%): N/A UN PLACEMENT LOCATION: Piers, Building D REPORT OF TESTS MEASURED MAXIMUM SLUMP DATE AGE LOAD (inches) TESTED (days) (Ibs.~rce) 1 I 6.00 03/18/1998 7 92590 1 2 6.00 03/18/1998 7 95890 Average 1 3 6.00 04/08/1998 28 1 4 6.00 04/08/1998 28 Technician time on report 9806990. AC 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 03/21/1998 -97 Business Center II ~ Rd. & Lakeshore Dr. Texas ed field test and cast BATCH TIME: 12:45 pm ,rian Otis .Id DNCRETE: 62 g TNO: 652126 iT WEIGHT (pc0: N/A CUMULATIVE YARDS: 30 COMPRESSIVE STRENGTH (psi) 3270 3390 3330 FRACTURE TYPE Technician: Brian Otis Started: Finished: H~ ~1 Report Distribution: (I) Lincoln Property Company (1) City of Coppell/Bldg. Insp. 1 ~;~Ug ne e Harbour (I) Butler Construction (1) City of Coppell/Constr. lnsp. (I) O'Brien & Associates [Vice President (I) AECC, Inc. This report is exclusively lbr thc use of the client indicated above and shall not be reproduced except in full without the wri~¢n approval of HBC Engineering, Inc. 1 OIAK Page I of I REPORT OF CONCRr' E INSPECTION Date of Service: Client No.: Client: Services: 03/10/1998 52617000 Lincoln Property Company 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 Concrete inspection Report No.: 980687 Project No.: 43-245: Project: Coppell Belt Li~ Coppell On this date, an HBC Engineering technician arrived at above referen as scheduled for concrete inspection. Placement had been cancelled notification to lab. Trip Charge: Minimum 2 Hours Technician: Terry L. Smith Report Distribution: (I) Lincoln Property Company (l) Butler Construction (1) O'Brien & Associates (I) AECC, Inc. ( 1 ) City of Coppell/Bldg. lnsp. (1) City ofCoppell/Constr, lnsp. Fl This report is exclusively ~br the use of the client indicated above and shall not be reproduced except in full without the wri ENGINEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 -97 Report Date 03/21 / 1998 Business Center II e Rd. & Lakeshore Dr. Texas :ed jobsite without prior En~ng, Inc. ,ul D. Smith, P.E. nior Project Engineer tten approval of HBC Engineering, Inc. 99AK Page 1 of I REPORT OF DRILLLf" BELLED PIER INSP I 8901 Carpenter Frwy., Suite #100 DiUas, Texas 75247 Date of Service: 03/11/1998 Client No.: 52617000 Client: Lincoln Property Company 3300 Lincoln Plaza/Lar~ Moon 500 No~_h Akard Street Dallas TX 75201-3394 Services: Drilled belled pier inspection Report No.: 980699 Project No.: 43-245: Project: Coppell Belt Lit Coppell D Report Date 03/21/1998 !-97 Business Center H te Rd. & Lakeshore Dr. Texas On this date, jobsite as scheduled for drilled pier inspection. recorded data. Technician time: 6:00 am to 6:30 pm Technician: Brian O~Js Report Distribution: (1) Lincoln Propmy C~mpmy (!) BW/~ C~m (1) O'Brim & Assoe~ O) Ar:cc, mo. an HBC Engineering technician arrived at the above re: See attached she~ (1) City of Coppell/Bldg, Insp. (1) C~ty of CoppemCct~r. tn~p. P This repot is excludvely for the use of the cl/mt indicated above md shall ncr be reproduced ex,pt in full without the wria erenced :t for , Inc. aul D. Smith, P.E. ~tior Project Eugineer approval of I-IBC Eagin~rin~. 99MP Page I of I REPORT OF DRILLED BELLED PIERS Project: Project No.: Coppell Business Center II, Belt Line Rd. & Lakeshore Dr. Coppell, Texas 43-2452-97 8901 Carpenter Fn, ty., Suite #100 Dallas, Texas 75247 Report NO.: 9806990 Date of Service: 03/11/98 Technician: Brian Otis Page: 1 of 4 Pier Identification Pier Diameter (in.) 9-C 24 9-D 24 9-E 24 9-F 24 9-G 24 9-1 9-J 24 9-K 24 9-L 24 8-B 24 8-C 24 24 Bell Diameter (in.) 54.0 54.0 54.0 54.0 54.0 54,0 54.0 54.0 54.0 54.0 54.0 Top of Pier Elevation (ft) 99.0 99.0 99.0 99.0 99.0 99.0 99.0 99.0 99.0 99.0 99.0 14,0 14.0 14.0 14.0 Req. Depth From Exist. Grade (ft) Initial Depth of Pier From Existing Grade (fi) Final Depth of Pier From Existing Grade (fi) ..... 14,0 14.0 14.0 14.0 14.0 14.0 14.0 . 14.42 13.42 14.42 14.67 14.58 15.67 14.42 15.0 15.0 15.0 14.0 14.5 13.42 14.42 14.75 14,58 15.83 14.42 15.0 15.17 15.0 14.08 Depth From Top of Concrete (ft) 14.0 12.92 13.92 14.25 14.08 15,33 13,92 14.5 14.67 14.5 13.58 Condition of Bottom (wet or dry) D D D D D D D D D D D Plumb Within Tolerance (yes or no) Y Y Y Y Y ,Y Y Y Y Y Y Casing Diameter (in) NA NA NA NA NA NA NA NA NA NA NA Cased Depth (ft) NA NA NA NA NA NA NA NA NA NA NA Number of Vertical Bars (ea.) 15 15 15 § 6 6 6 6 6 6 6 Reinforcing Bar Size (#) 6 6 6 6 6 6 6 6 6 6 6 Length of Vertical Bars (ft.) 13.5 12.42 13.42 13.75 13,58 14,83 13.42 14 14.17 14 13,08 Time Drilling Was Completed 10:35 AM 10:27 AM 10:18 AM 10:09 AM 10:01 AM 09:51 AM 09:42 AM 09:31 AM 09:15 AM 11:20 AM 11:49AM Time Concrete Was Placed 02:00 PM 02:08 PM 02:16 PM 02:25 PM 03:15 PM 03:23 PM 03:32 PM 03:42 PM 03:53 PM 04:10 PM 04:19 PM IL REPORT OF DRILLED BELLED PIERS ENGINEERING, INC. 8901 Carpenter Fr'.vv. Suite # 100 Dallas, Texas 75247 Project: Project No,: Coppell Business Center II, Belt Line Rd. & Lakeshore Dr. Coppell, Texas 43-2452-97 Report No.: 9806990 Date of Service: 03/11/98 Technician: Brian Otis Page 2 of 4 Pier Identification Pier Diame_te~r (~in,~) _ Be!! Diameter (in,) Top of Pier Elevation (ft) Req, Depth From Exist, Grade fit) Initial Depth of Pier From Existing Grade (fi) Final Depth of Pier From Existing Grade (fi) Depth From Top of Concrete fit) Condition of Bottom (wet or dry) Plumb Within Tolerance (yes or no) Casing Diameter (in) ~_a? e d De pt~h~{ft_}_) _Reinforcing Bar Size (#) _L__e. ng~th of Vertical Bars (ft,) Time Drilling Was Completed Time Concrete Was Placed 10-B 10-C 24 24 54.0 54.0 99.0 99.0 14.0 14.0 18.0 18.75 18.0 18.75 17.5 18.25 D D Y Y NA NA IO~D 10-E 24 24 54,0 54,0 99,0 99,0 14,0 14,0 18,0 18,0 18.08 18.0 17,58 17,5 D D Y Y NA NA 10-F 24 54.0 99.0 14,0 19.0 19.08 18.58 D Y NA 10-G 10-1 10-J 10-K i 10-L 24 24 24 24 ~ 24 54.0 54.0 99.0 99.0 14.0 17.58 17.67 17.17 D Y NA 14.0 17.33 17.33 16.83 99.0 14.0 18.75 18.83 99.0 99.0 14,0 14.0 18.75 18.75 18.0 18.08 17.58 54.0 99.0 14.0 14.08 14.08 13.58 D D ._ NA NA ..... _NA NA .NA- _ NA 0[0 6 6 [ 6 6 1. e ....... 6___ / 17 17.75 1_7_:._0_8 l 17 18.08 16.67 / 06:45 AM 07:10 AM 07:22 AM I 07:44 AM 07:55 AM 08:06 AM / 11:18AM 11:27AM 11:37AM t11:45AM 11:58AM 12:45 PM 18.33 18.25 Y Y Y Y Y NA NA NA NA NA NA NA .... NA NA ..... NA ..... t::i t5 ........ 6 6 6 ~ 6 6 16.33 17.83 17.75 17.08 13.08 08:25 AM 08:37 AM 08:54 AM 09:04 AM 10:46 AM 12:53 PM 01:05 PM 01:15 PM 01:26 PM 01:35 PM REPORT OF DRILLED BELLED PIERS ENGINEERING, INC. 890l Carpenter Frwy, Suite #100 Dallas, Texas 75247 Project: Project No.: Coppell Business Center II, Belt Line Rd. & Lakeshore Dr. Coppell, Texas 43-2452-97 Report No.: 9806990 Date of Service: 03/11/98 Technician: Brian Otis Page 3 of 4 Pier Identification ~!er .Diame~t_e__r (i~n._) ...... Be_Il _D i a _rn_ ~e_t_ _e r_ ! i_n ._) ............. 54..Q ..... _54__.~ .... Top of Pier Elevation (ft) Req. Depth From Exist. Grade (ft) Initial Depth of Pier From Existing Grade (fi) Final Depth of Pier From Existing Grade (ft) Depth From Top of Concrete (ft) Condition of Bottom (wet or dry) Plumb Within Tolerance (yes or no) Casing Diameter (in) Cased Depth (ft) Number of Vertical Bars (ea.) Reinforcing Bar Size (#) Length of Vertical Bars (ft.) T_!m.e.D_ ri!!i n~g W_.a_s com__p_le_t_e_d Time Concrete Was Placed 8-D 8oE 8-F 24 24 24 99,0 99,0 14,0 14,0 14,08 14,0 14,25 14,0 54.0 8-G 24 54.0 8-1 54.0 8-J 54.0 8-K 54,0 8-L 54.0 13.75 D Y 99.0 99.0 14.0 14.0 14.0 14.17 14.08 14.25 13.52 13.75 D D Y Y 13.5 D Y 99.0 14,0 14.25 14.33 13.83 D Y NA NA NA NA . NA _ N~ ......... N~A .........._1'4~ ...... N~A NA ~ ~ ~ 6 6 6 13.25 99.0 14.0 14.08 14.08 13.58 D Y 99,0 14,0 14.0 14.25 13.75 D Y 99.0 14.0 15.0 12:22 PM 05:10 PM 15,17 14.67 Y 7-B 6 6 6 13.25 13 13.08 11:59 AM 12:05 PM 12:14 PM 04:26 PM 04:38 PM 04:48 PM 24 54,0 99.0 14.0 14.42 14.42 13.92 D Y 7-C 54.0 99,0 14,0 14,0 · 7-D 54.0 99.0 14,0 14.42 14.25 14.42 13.75 13.92 D D Y Y NA NA 6 6 13.08 12:38 PM 05:31 PM NA NA NA NA NA NA 6 6 13,42 01:11 PM 6 6 13.25 14.17 12:47 PM 12:58 PM 05:40 PM 05:45 PM 6 05:54 PM 13.33 12:30 PM 05:22 PM NA NA NA NA 6 6 6 6 13.25 13.42 01:17 PM 01:24 PM 05:58 PM 06:08 PM LLI ...J --I ILl 1:13 ILl 0 0