Northlake 635(3)-LR 980324'CONCRETE COMP C' SIVE STRENGTH
Date of Service:
Client No.:
Client:
03/13/1998
52617000
Lincoln Property Company
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Report No.: 980719
Project No.: 43-245~
Project: Coppell
Belt Lin
Coppell,
Services: Obtain samples of fresh concrete at the placement locations, perform requit
compressive strength samples.**
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 22
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi ~ 28 Days
5"
3-6%
ASTM C- ! 43
ASTM C- 172
ASTM C-39
PROJECT DATA
CONCRETE CLASS: 9351
PLACEMENT DATE: 03/13/1998
TIME SAMPLED: 5:10am BY: J,
WEATHER CONDITIONS: Cold, rai
TEMPERATURE (F) - AIR 45 F C
TRUCKNO: 736 TICKE
AIR CONTENT (%): 4.0 UN]
PLACEMENT LOCATION:
Paving, parking dock between Buildings B &
SAMPLE LOCATION: From expan, joint E, 7'W/2'N
REPORT OF TESTS
CYLINDER MEASURED MAXIMUM
MARKED SLUMP DATE AGE LOAD
SET NO. (inches) TESTED (days) (lbs. force)
1 1 5.50 03/20/1998 7 95270
1 2 5.50 03/20/1998 7 90010
Average
I 3 5.50 04/10/1998 28
l 4 5.50 04/10/1998 28
AC
This report is exclusively for the usc of the client indicated above and shall not bc reproduced except in full without the wri
01AK Page I of 9
-97
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
03/24/1998
Business Center II
: Rd. & Lakeshore Dr.
Texas
ed field test and cast
BATCH TIME: 4:40 am
lek Farris
DNCRETE: 60 F
TNO: 652310
T WEIGHT (pcO: N/A
iUMULATIVE YARDS: 40
COMPRESSIVE
STRENGTH
(psi)
3370
3180
3280
~cn approval of H. BC Engineering, Inc.
' CONCRETE COMPRr' SIVE STRENGTH
Date of Service:
Client No.:
Client:
Services:
03/13/1998 Report No.: 980719
52617000
Project No.: 43-245~
Lincoln Property Company
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Project: Coppell
Belt Lin
Coppell
Obtain samples of fresh concrete at the placement locations, perform requi~
compressive strength samples.**
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 22
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi ~ 28 Days
5"
3-6%
ASTM C- 143
ASTM C- 172
ASTM C-39
SAMPLE LOCATION: Froro NE corner, 5'S/6'W
CYLINDER
MARKED
SET NO.
PROJECT DATA
CONCRETE CLASS: 9351
PLACEMENT DATE: 03/13/1998
TIME SAMPLED: 7:15 am BY:
WEATHER CONDrrIONS: Cloudy
TEMPERATURE (F) - AIR 41 F
TRUCK NO: 514 TICKI
AIR CONTENT (%): 3.0 UN
PLACEMENT LOCATION:
See page I
REPORT OF TESTS
MEASURED MAXIMUM
SLUMP DATE AGE LOAD
(inches) TESTED (days) (lbs. force)
3 I 5.00 03/20/1998 7 122100
3 2 5.00 03/20/1998 7 120290
Average
3 3 5.00 04/10/1998 28
3 4 5.00 04/10/1998 28
AC
This report is exclusively tbr the use of thc client indicated above and shall not be reproduced except in full without the wri
01AK Page 3 of 9
ENGINEERING, INC.
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
03/24/1998
Business Center II
e Rd. & Lakeshore Dr.
Texas
'ed field test and cast
BATCH TIME: 6:45 am
ack Farris
cold
ONCRETE: 60 F
,TNO: 629716
IT WEIGHT (pc0: N/A
CUMULATIVE YARDS: 230
COMP~IVE
STRENGTH
(psi)
4320
4250
4290
FRACTURE
TYPE
~en approval of HBC Engineering, Inc.
' CONCRETE COMPRr"SSIVE STRENGTH
Date of Service:
Client No.:
Client:
03/13/1998
52617000
Lincoln Property Company
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Report No.: 9807191
Project No.: 43-2452
Project: Coppeli
Belt Lin
Coppell
Services: Obtain samples of fresh concrete at the placement locations, perform reqm~
compressive strength samples.**
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 22
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi ~ 28 Days
5"
3-6%
ASTM C- 143
ASTM C- 172
ASTM C-39
PROJECT DATA
CONCRETE CLASS: 9351
PLACEMENT DAT~: 03/13/1998
TIME SAMPLED: 7:50 am BY:
WEATHER CONDITIONS: Cloudy
TEMPERATURE (F) - AIR 41 F
TRUCK NO: 1805 TICKI
AIR CONTENT (%): 3.2 UN
PLACEMENT LOCATION:
See page I
SAMPLE LOCATION: From NW comer, 6'S/9'E
CYLINDER
MARKED
SET NO.
REPORT OF TESTS
MEASURED MAXIMUM
SLUMP DATE AGE LOAD
(inches) TESTED (days) (lbs. force)
4 I 5.50 03/20/1998 7 102460
4 2 5.50 03/20/1998 7 105840
Average
4 3 5.50 04/10/1998 28
4 4 5.50 04/10/1998 28
A(
Tiffs report is exclusively tbr the use of the client indicated above and shall not be reproduced except in full without the ~n
01AK Page 4 of 9
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
03/24/1998
-97
Business Center II
e Rd. & Lakeshore Dr.
Texas
ed field test and cast
BATCH TIME: 7:25 am
ack Farris
cold
ONCRETE: 60 F
:TNO: 652355
[T WEIGHT (pc0: N/A
iCUMULATIVE YARDS: 330
COMPRESSIVE
STRENGTH
(psi)
3620
3740
3680
tten approval of HBC Engineering, Inc.
CONCRETE COMPI ' SIVE STRENGTH
Date of Service: 03/13/1998 Report No.:
Client No.: 52617000 Project No.:
Client: Liucoln Property Company Project:
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
980719
43-245;
Coppell
Belt Lit
Coppell
Services: Obtain samples of fresh concrete at the placement locations, perform requi
compressive strength samples.**
PROJECT DATA
CONCRETE CLASS: 9351
PLACEMENT DATE: 03/13/1998
TIME SAMPLED: 9:40 am BY: .J
WEATHER CONI)ITIONS: Cloudy,
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 22
SPECIFICATION REQUIREMENTS
STRENaTm 4000 psi ~ 28 Days TEMPERATURE (F) - AIR 47 F (
SLUMP: 5" TRUCK NO: 841 TICKJ
AIR: 3-6% AIR CONTENT (%): 3.0 tJ~
TEST METROD: ASTM C-143 PLACEMENT LOCATION:
ASTM C- 172 See page I
ASTM C-39
SAMPLE LOCATION: From NE corner, 3'S/5'W
CYLINDER
MARKED
SET NO.
REPORT OF TESTS
MEASURED MAXIMUM
SLUMP DATE AGE LOAD
(inches) TESTED (days) (lbs. force)
5 1 5.50 03/20/1998 7 100660
5 2 5.50 03/20/1998 7 105790
Average
5 3 5.50 04/10/1998 28
5 4 5.50 04/10/1998 28
Al
This report is exclusively tbr tile use of the client indicated above and shall not be reproduced except in full without thc ~
01AK Page 5 of 9
ENGINEERING, INC.
8901 Carpenter Frwy., Snite #100
Dallas, Texas 75247
-97
Report Date
03/24/1998
Business Center II
te Rd. & Lakeshore Dr.
Texas
ed field test and cast
BATCHTIME: 9:16 am
ack Farris
cold
:ONCRETE: 60 F
~TNO: 652382
IT WEIGHT (pef): N/A
:CUMULATIVE YARDS: 440
COMPRESSIVE
STRENGTH
(psi)
3560
3740
3650
FRACTURE
TYPE
ttcn approval of HBC Engineering, Inc.
CONCRETE COMPRr"SSIVE STRENGTH
Date of Service: 03/13/1998 Report No.:
Client No.: 52617000 Project No.:
Client: Lincoln Property Company Project:
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
980719]
43-2452
Coppell
Belt Lin
Coppell
Services: Obtain samples of fresh concrete at the placement locations, perform requll
compressive strength samples.**
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 22
SPECIFICATION REQUIREMENTS
STR~NGTm 4000 psi ~ 28 Days
5"
3-6%
ASTM C- 143
ASTM C- 172
ASTM C-39
SAMPLE LOCATION:
From SE comer, 6'N/4'W
PROJECT DATA
CONCRETE CLASS: 9351
PLACEMENT DATE: 03/13/1998
TIME SAMPLED: 11:10 am BY:
WEATHER CONDITIONS: Cloudy
TEMPERATURE (F) - AIR 47
TRUCK NO: 802 TICK!
AIR CONTENT (%): 4.2 UN
PLACEMENT LOCATION:
See page 1
CYLINDER
MARKED
SET NO.
REPORT OF TESTS
MEASURED MAXIMUM
SLUMP DATE AGE LOAD
(inches) TESTED (days) (lbs. force)
6 1 6.00 03/20/1998 7 72070
6 2 6.00 03/20/1998 7 75260
Average
6 3 6.00 04/10/1998 28
6 4 6.00 04/10/1998 28
A(
This report is exclusively tbr the use of the client indicated above and shall not be reproduced except in full without the a
01AK Page 6 of 9
8901 Carpenter Frwy., Suite #100
· Dallas, Texas 75247
-97
Report Date
03/24/1998
Business Center II
e Rd. & Lakeshore Dr.
Texas
'ed field test and cast
BATCH TIME: 10:40 am
ack Farris
cold
ONCRETE: 60 F
:T NO: 652402
Fl' WEIGHT (pcO: N/A
!CUMULATIVE YARDS: 550
COMPR~IVE
STRENGTH
(psi)
2550
2660
2610
FRA~U~
TYPE
~n approval of HBC Engineering, Inc.
CONCRETE COMPRESSIVE STRENGTH
Date of Service:
Client No.:
Client:
Services:
03/i 3/1998 Report No.:
52617000 Project No.: 43-245~-97
Lincoln Property Company
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Project:
Coppell
Belt Lit
Coppell
Obtain samples of fresh concrete at the placement locations, perform requi~
compressive strength samples.**
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
P~ANT: 22
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi @ 28 Days
5"
3-6%
ASTM C- 143
ASTM C- 172
ASTM C-39
PROJECT DATA
CONCRETE CLASS: 9351
PLACEMENT DATE: 03/13/1998
TIME SAMPLED: 12:40 pm BY:
WEATHER CONDITIONS: Cloudy:
TEMPERATURE (F) - AIR 49 r C
TRUCK NO: 736 TICKI~
AIR CONTENT (%): 4.2 UN
PLACEMENT LOCATION:
See page !
SAMPLE LOCATION: From SE comer, 15'N/12'W
REPORT OF TESTS
CYLINDER MEASURED
MARKED SLUMP DATE
SET NO. (inches) TESTED
7 1 5.75 03/20/1998
7 2 5.75 03/20/1998
7 3 5.75 04/10/1998 28
7 4 5.75 04/10/1998 28
MAXIMUM
AGE LOAD
(days) (lbs. force)
7 98200
7 93030
Average
AC
This report is exclusively tbr the use of thc client indicated above and shall not be reproduced except in full without thc writ
01AK Page 7 of 9
ENGINEERING, INC.
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
03/24/1998
Business Center II
e Rd. & Lakeshore Dr.
Texas
ed field test and cast
BATCH TIME: 12:00 pm
ack Farris
cold
ONCRETE: 60 F
T NO: 652422
· WEIGrIT (PC0: N/A
CUMULATIVE YARDS: 620
UOMPRESSIVE
STRENGTH
(psi)
3470
329O
3380
en approval of HBC Engineering, Inc.
CONCRETE COMPRr'SSIVE STRENGTH
Date of Service: 03/13/1998 Report No.:
Client No.: 52617000 Project No.:
Client: Lincoln Property Company Project:
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
980719
43-2452
Coppell
Belt Lin
Coppeil
Services: Obtain samples of fresh concrete at the placement locations, perform requi~
compressive strength samples.**
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 22
SPECIFICATION REQUIREMENTS
STR~.NGTH: 4000 psi @ 28 Days
3-6%
ASTM C- 143
ASTM C-172
ASTM C-39
SAMPLE LOCATION:
From SW comer, 10'N/6'E
CYLINDER
MARKED
SET NO.
PROJECT DATA
CONCRETE CLASS: 9351
PLACEMENT DATE: 03/13/1998
TIME SAMPLED: 1:55 pm BY: J
WEATHER CONDITIONS: Cloudy,
TEMPERATURE (F) - AIR 50 F C
TRUCK NO: 769 TICK[
AIR CONTENT (%): 4.2 UN:
PLACEMENT LOCATION:
See page 1
REPORT OF TESTS
MEASURED MAXIMUM
SLUMP DATE AGE LOAD
(inches) TESTED (days) (lbs. force)
8 1 5.50 03/20/1998 7 74240
8 2 5.50 03/20/1998 7 77570
Average
8 3 5.50 04/10/1998 28
8 4 5.50 04/10/1998 28
AC
This report is exclusively tbr the use of the client indicated above and shall not be reproduced except in full without the wi'il
01AK Page 8 of 9
ENGINEERING, INC.
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
03/24/1998
-97
Business Center II
e Rd. & Lakeshore Dr.
Texas
ed field test and cast
BATCH TIME: 1:17 pm
ick Farris
:old
[}NCRETE: 62 g
TNO: 652447
:T WEIGHT (peO: N/A
CUMULATIVE YARDS: 730
UOMPRESSIVE
STRENGTH
(psi)
2630
2740
2690
FRACTURE
TYPE
o
ten approval of HBC Engineering, Inc.
'CONCRETE
Date of Service:
Client No.:
Client:
Services:
SLUMP:
AIR:
TEST METHOD:
COMPR? SIVE STRENGTH
03/13/1998
52617000
Lincoln Property Company
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Report No.: 980719!
Project No.: 43-2452
Project: Coppell
Belt Lin
Coppell,
Obtain samples of fresh concrete at the placement locations, perform requi~
compressive strength samples.**
Butler Construction
CONTRACTOR:
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 22
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi @ 28 Days
5"
3-6%
ASTM C- 143
ASTM C- 172
ASTM C-39
DATE
TESTED
03/20/1998
03/20/1998
04/10/1998
04/10/1998
SAMPLE LOCATION:
Started: 3:00 am
(I) City ofCoppell/BIdg. Insp.
( I ) City of Coppell/Constr. Insp.
From SW corner, 2'N/4'E
CYLINDER MEASURED
MARKED SLUMP
SET NO. (inches)
9 I 5.00
9 2 5.00
9 3 5.00
9 4 5.00
Technician: Jack Farris
Report Distribution:
(I) Lincoln Property Company
(1) Butler Construction
(1) O'Brien & Associates
(1) AECC, Inc.
PROJECT DATA
CONCRETE CLASS: 9351
PLACEMENT DATE: 03/13/1998
TIME SAMPLED: 3:50 pm BY: J~
ENGINF_F_I~ING, INC.
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
WEATHER CONDITIONS: Cloudy,
TEMPERATURE (F) - Am 50 F C
TRUCK NO: 373 TICK[
AIR CONTENT (%): 3.0 UN]
PLACEMENT LOCATION:
See page I
REPORT OF TESTS
MAXIMUM
AGE LOAD
(days) (Ib~. force)
7 96450
7 92500
Average
28
28
Finished: 4:30 pm I'~
This report is exclusively tbr the use of the client indicated above and shall not be reproduced except in full without the wr
AC
Report Date
03/24/1998
-97
Business Center II
e Rd. & Lakeshore Dr.
Texas
ed field test and cast
BATCH TIME: 3:10 pm
tck Farris
:old
~}NCRETE: 61
~'NO: 652469
T WEIGHT (pct'}: N/A
UUMULATIVE YARDS:
2OMPRESSIVE
STRENGTH
(psi)
3410
3270
3340
;ugene Harbour
Vice President
840
FRACTURE
TYPE
:eh approval of HBC Engineering, Inc.
01AK Page 9 of 9