Northlake Wood-CS 940216 P.O. Box 478
Coppell, Texas 75019
The City With A Beautiful Future 214-462-0022
February 16, 1994
Mr. Robert Wright
Needham, Wright and Laskey
10290 Monroe Suite 305
Dallas, TX 75529
RE: Northlake Woodlands Block 1, Lots S through 10
Development Fee Assessment
Dear Mr. Wright:
Enclosed is a copy of the City of Coppell development fee assessment list, along with a copy of the
development fee calculations for Northlake Woodlands Block 1, Lots 5 through 10.
Please provide a check made payable to the City of Coppell in the amount of $14,310.00 and
forward it to Mr. Alan Johnson, Acting Finance Director, along with a copy of the fee assessment
list. Please provide our office a copy of the engineer's estimate or contract for this project so the
construction inspection fee can be verified.
By providing a copy of your paid receipt to our office, it will help us to verify payment of the
required fees and insure a successful beginning of this project.
We look forward to working with you on this project. If you have any questions, please do not
hesitate to contact me.
Sincerely,
Kenneth M. Griffin, P.E.
City Engineer
cc: Steve Goram, Director of Public Works
Alan Johnson, Acting Finance Director
Greg Sones, Building Official
Doug Stevens, Engineering Technician
CITY OF COPP~L
DE~OPMENT FEES
Date: February 16, 1994
Project: Northlake Woodlands Block 1, Lots 5 through 10
TOTAL AMOUNT DUE
ASSESSMENT PRIOR TO
COUNCIL
APPROVAl.
Water Impact Fee $3,900.00 $3,900.00
(100% due prior to Council Approval)
Water Tap Inspection Fee $(:~0.00 -O-
(lO0%due at Issuance of Building Permit)
Wastewater Impact Fee (MUD) $2,700.00 $2,700.00
(100% due prior to Council Approval)
Sewer Tap Inspection Fee $600.00 -0-
(100%due at Issuance of Building Permit)
Utility Final Inspection Fee $300.00 -0-
(10055due at Issuance of Building Permit)
Water Meter Fee (Lots) $133.50 -0-
(10055 due at Issuance of Building Permit)
Water Meter Fee (Irrigation & Fire) -0- -0-
(10055 due at Issuance of Water Meters)
Water Meter Deposit $180.00 -0-
(10055due at Issuance of Building Permit)
Irrigation Meter Deposit -0- -0-
(10055due at Issuance of Water Meters)
Street Sign Fee -0- -0-
(10055due prior to Acceptance of Project)
Street Light Fee * -0-
(10055due prior to Acceptance of Project)
Park Fee $7,710.00 $7,710.00
(10055 due prior to Council Approval)
TOTAL $16,123.50
TOTAL AMOUNT DUE PRIOR TO $14,310.00
COUNCIL APPROVAL
+ Construction Inspection Fee
(255 of Project Cost due prior to
preconstruction meeting)
· This fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project.
Once the plan is submitted, $292.60 per light will be assessed.
~E~OR~NDU~
DATE: February 14, 1994
TO: Engineering Department
FROM: Public Works Staff
RE: Development Fees for Northlake Woodlands Blk 1, Lots 5
through 10
The following fees should be assessed and collected on the above
referenced project.
Water Impact Fee:
6 - 5/8" x 3/4" Domestic Meter/s = 6 ESU's
N/A - Irrigation Meter/s = ESU's
N/A - Fireline Meter/s = ESU's
Total 6 ESU's ~ $650.00 ea = S3,900.00
100% due prior to Council approval of the final plat.
Wastewater Impact (MUD)
N/A - Domestic Meter/s = ESU's
Total ESU's ~ $225.00 ea = S
100% due prior to Council approval of final plat.
Wastewater Impact (City)
6 - 5/8" x 3/4" Domestic Meter/s = 6 ESU's
Total 6 ESU's ~ $450.00 ea = $ 2,700.00
100% due prior to Council approval of the final plat.
Water Tap Inspection Fee
6 Connections @ $100.00 each = $ 600.00
100% due prior to issuance of building permit for residential. (Or in
the case of multi-family, commercial, retail, industrial, fee is due
prior to issuance of meter).
Development Fees
Page 2
Sewer Tap Inspection Fee
6 Connections ~ $100.00 each = $ 600.00
10O% due prior to issuance of building permit. (Residential only)
Utility Final Inspection Fee (All Development)
6 lots ~ $50.00/lot = $ 300.00
100% due prior to issuance of building permit.
Water Heter Fee (Domestic)
6 - 5/8" x 3/4" Domestic Meters ~ 22.25 ea = $ 133.50
100% due prior to issuance of building permit for residential only.
All other development fees are due prior to issuance of meter/s.
Water Meter Fee (Irrigation/Fireline)
N/A - Irrigation Meter/s @ S ea = S
N/A - Fireline Meter/s ~ $ ea = $
100% due prior to issuance of water meter/s.
Water Meter Deposit (Residential)
6 Meters ~ $30.00 ea = $ 180.00
100% due prior to issuance of building permit.
Water Meter Deposit (Multi-Family or Non-Residential)
N/A Meters @ $35.00 ea = $
100% due prior to issuance of water meters.
Irrigation Meter Deposit
N/A Meters ~ $35.00 ea = $
100% due prior to issuance of water meters.
Development Fees
Page 3
Park Fee
For those developments having preliminary plat approval after October
26, 1993 the following assessment is determined:
6 Residential Lots at $1,285.00 each = $ 7.710.00
Units (Multi-Family) at $1,285.00 each = $
100% of the amount specified above shall be paid by the Developer
prior to Council approval of final plat.
Please advise the Developer of these fees and due dates.
If you have any questions regarding these assessments please advise.
Street Lighting Fee
Shall be assessed and paid prior to final acceptance of project.
Note: This fee cannot be assessed until after TU Electric submits
the lighting plan for the proposed project. Once plan is
submitted $292.60 per light will be assessed.
Street Signs Fee
See attached Street Sign Assessment sheet.
100% due prior to final acceptance of project.
cc: Steven G. Goram, Director of Public Works
G. Greg Jones, Chief Building Official