Loading...
Northlake 635(3)-LR 980325CONCRETE COMPRr' SIVE STRENGTH Date of Service: Client No.: Client: Services: 03/12/1998 Report No.: 9807101 52617000 Projeet No.: 43-2452 Lincoln Property Company 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 Project: Coppell Belt Lin Coppell Obtain samples of fresh concrete at the placement locations, perform requil compressive strength samples.** CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer Concrete PLANT: 22 SPECIFICATION REQUIREMENTS STRENGTH: 3500 psi ~ 28 Days SLUMP: 4" AIR: N/A TEST METHOD: ASTM C- 143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9337 PLACEMENT DATE: 03/12/1998 TIME SAMPLED: 1:48 pm BY: [ WEATHER CONDITIONS: Cloudy, TEMPERATURE (lq') - AIR 56 V C TRUCK NO: 556 TICK~ AIR CONTENT (%): N/A UN PLACEMENT LOCATION: Piers, Building D SAMPLE LOCATION: 6-K, 6-L, 4-B REPORT OF TESTS CYLINDER MEASURED MARKED SLUMP DATE SET NO. (inches) TESTED 1 I 5.75 03/19/1998 1 2 5.75 03/19/1998 I 3 5.75 04/09/1998 I 4 5.75 04/09/1998 MAXIMUM AGE LOAD (days) (lbs. force) 7 111150 7 114860 Average 28 28 AC Technician time on report 9807107. Technician: Brian Otis Report Distribution: (1) Lincoln Property Company (1) Butler Construction (1) O'Brien & Associates (1) AECC, Inc. Started: Finished: (1) City ofCoppell/Bldg, lnsp. ( 1 ) City of Coppell/Constr. Insp. This report is exclusively tbr the use of the client indicated above and shall not be reproduced except in full without the wi .97 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 03/25/1998 Business Center II e Rd. & Lakeshore Dr. Texas ed field test and cast BATCH TIME: 1:27 pm .rian Otis ~vindy, Pool DNCRETE: 62 g TNO: 652231 T WEIGHT (pc0: N/A CUMULATIVE YARDS: COMPRESSIVE STRENGTH (psi) 3930 4060 4000 10 FRACTURE TYPE Vice President ten approval of I-IBC Engineering, Inc. 01AK Page I of I CONCRETE COMPRP SIVE STRENGTH TEff'Y Date of Service: 03/13/1998 Report No.: Client No.: 52617000 Project No.: Client: Lincoln Property Company Project: 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 980721' 43-2452 Coppell Belt Lin CoppelL Services: Obtain samples of fresh concrete at the placement locations, perform requi~ compressive strength samples.** SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer Concrete PLANT: 22 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi ~ 28 Days 5" N/A ASTM C- 143 ASTM C- ! 72 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9351 PLACEMENT DATE: 03/13/1998 TIME SAMPLED: 3:15 pm aY: E WEATHER CONDITIONS: Cloudy, TEMPERATURE (F)- AIR 56 F C TRUCK NO: 769 TICKI~ AIR CONTENT (%): N/A PLACEMENT LOCATION: Piers, Building D SAMPLE LOCATION: I-B, l-B.4, 1-B.6 CYLINDER MEASURED MARKED SLUMP DATE SET NO, (inches) TESTED 1 1 6.25 03/20/1998 1 2 6.25 03/20/1998 I 3 6.25 04/10/1998 1 4 6.25 04/10/1998 REPORT OF TESTS MAXIMUM AGE LOAD (days) (lbs. force) 7 86990 7 89670 Average 28 28 AC Note: Mix used is for paving. Technician time on report 9807218. Technician: Brian Otis Report Distribution: (I) Lincoln Property ComPany (I) Butler Construction (I) O'Brien & Associates (I) AECC, Inc. Started: (I) City of Coppell/Bldg. lnsp. (I) City of Coppell/Constr. lnsp. Finished: 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 03/25/1998 ~97 Business Center II e Rd. & Lakeshore Dr. Texas ed field test and east BATCH TIME: 2:20 pm rian Otis :ool ~NCRETE: 69 F TNO: 652463 T WEIGHT (@c0: N/A CUMULATIVE YARDS: STRENGTH (psi) 3080 3170 3130 10 ~ugene Harbour Vice President FRACTURE TYPE This report is exclusively lbr the use of the client indicated above and shall not be reproduced except in full without the m approval of HBC Engineering, Inc. 01AK Page 1 of 1 CONCRETE COMPRP$SIVE STRENGTH TE V Date of Service: Client No.: Client: Services: 02/20/1998 Report No.: 980553 52617000 Project No.: 43-245~ Lincoln Property Company 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 Project: Coppell Belt Lit Coppell Obtain samples of fresh concrete at the placement locations, perform requi~ compressive strength samples.** .97 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer Concrete PLANT: 22 SPECIFICATION REQUIREMENTS STRENGTH: 3500 psi ~ 28 Days N/A ASTM C- 143 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: 7-C.3, 7-C.8, 7-D CYLINDER MARKED SET NO. MEASURED SLUMP (inches) I 1 5.75 1 2 5.75 1 3 5.75 I 4 5.75 Technician time on report DATE TESTED 02/27/1998 02/27/1998 03/20/1998 03/20/1998 9805532. Technician: Brian Otis Started: TRUCK NO: 730 AIR CONTENT (%): N/A PLACEMENT LOCATION: Piers, Building C Report Date 03/25/1998 Business Center II e Rd. & Lakeshore Dr. Texas ed field test and cast PROJECT DATA CONCRETE CLASS: 9337 PLACEMENT DATE: 02/20/1998 BATCH TIME: 10:05 am TIME SAMPLED: f0:53 am BY: ~rian Otis WEATHER CONDITIONS: Clear, lid TEMPERATURE (F} - AIR 69 F CONCRETE: 68 F TIC~a.T NO: 633688 UN IT WEIGHT (PC0: N/A AC REPORT OF TESTS CUMULATIVE YARDS: COMPRESSIVE STRENGTH (psi) 3920 4060 3990 5220 5380 5300 Report Distribution: (I) Li,coln Property Company (I) Butler Construction (I) O'Brien & Associatcs (I) AECC, Inc. (I) City of Coppell/Bldg. lnsp. (I) City of Coppell/Constr. Insp. MAXIMUM AGE LOAD (days) (lbs. force) ;ugene Harbour Vice President 10 7 110960 7 114830 Average 28 147510 28 152010 Average Finished: This report i~ exclusively tbr thc usc of thc client indicated above and shall not bc reproduced except in full without thc wr FRACTURE TYPE Ien approval of HBC Engineering, Inc. 01AK Page 1 of I