Loading...
Northlake Wood-CS 920916The Cfty with A Beautiful Future 255 Parkway Blvd. pO Box 478 Copp*l,. Texas 7~19 PROPERTY WITHIN FLOODPLAIN STATE OF TEXAS : COUI4TYOF DALLAS : CITY OF COPPELL: The above named permittee applied for a DEVELOPM~T PEP44IT on ~/t~'/~ The application has been reviewed by the ADHINkSTRATOR and it is his _,,~ determination that the propos~ develo~ment,~IS~,~lqc~ted within an~ The ADHINISTRATOR has reviewed plans and specifications of the proposed development for conformance with the development standards required by COPPELL flood plain management regulations. You are hereby authorized to proceed with the following described work: on the following described property: To maintain compliance with the development standards of COPPELL flood plain management regulations and to eliminate or minimize flood damage potential to the proposed development, you are hereby directed to construct your proposed development in accordance with the following special provisions: ( ) For residential structures, the lowest floor (including basement) must be elevated to two [2l feet above the 100-year base flood elevation. Hinimum finished floor elevations must be shown on the plat for the development as approved by the City Engineer. (The lowest floor must be elevated two (2) feet above BYE. or one (1) foot above ultimate condition whichever is hipher). ) For non-residential structures, the lowest floor (including basement) must be elevated or floodproofed to two (2) feet above the 100-year base flood elevation. Hlnimum finished floor elevations must be shown on the plat or site plan as approved by the City Engineer. (The lowest floor must be elevated two (2] feet above BFE, or one (1] foot above ultimate condition whichever is higher. ( ] Permittee must submit a certification from a registered professional engineer, architect, or land surveyor that the finished floor level of the residential structure has been constructed two (2J feet above the 100-year base flood elevation, or 6ne (1) foot above ultimate condition ~h£chever is higher. ( J For non-residential floodpruofing, a registered professional engineer or architect must certify that the floodproofing methods are adequate to withstand the flood depths, pressures, velocities, impact and uplift forces and other factors associated with the base flood. ] For fill activities, the permittee must submit a certification from an engineer or land surveyor that the level of the compacted fill material is at or above the elevation of the Base Flood. ( ) Provide certified copy of all final plans or As-Built Drawings to the ~JI4IN~STRATOR. SIGNATURE OF ADMINISTRAT~ ~- $~~l~~ DATE HOLD HARMLR.~S AGREEMENT I~ ~,, ~~'c'.. ~ ~ ~. ~ tJL~.~ o, ,~ ~'~',~'~ ~°°' ~ ~ ~ 100 - . ~- 100' ~. ~ · k~ ~ ...-./ . ~t.~' , ' , ~ : 1~' 1~. ~ ~ " NOR r~,.  No~rHLAKE I~OODLANO$ ~ FI~T~ $Ecrlo~ ADD~ ~