Northlake Wood-CS 920916The Cfty with A Beautiful Future
255 Parkway Blvd.
pO Box 478
Copp*l,. Texas 7~19
PROPERTY WITHIN FLOODPLAIN
STATE OF TEXAS :
COUI4TYOF DALLAS :
CITY OF COPPELL:
The above named permittee applied for a DEVELOPM~T PEP44IT on ~/t~'/~
The application has been reviewed by the ADHINkSTRATOR and it is his _,,~
determination that the propos~ develo~ment,~IS~,~lqc~ted within an~
The ADHINISTRATOR has reviewed plans and specifications of the proposed
development for conformance with the development standards required by
COPPELL flood plain management regulations. You are hereby authorized to
proceed with the following described work:
on the following described property:
To maintain compliance with the development standards of COPPELL flood
plain management regulations and to eliminate or minimize flood damage
potential to the proposed development, you are hereby directed to
construct your proposed development in accordance with the following
special provisions:
( ) For residential structures, the lowest floor (including basement)
must be elevated to two [2l feet above the 100-year base flood
elevation. Hinimum finished floor elevations must be shown on the
plat for the development as approved by the City Engineer. (The
lowest floor must be elevated two (2) feet above BYE. or one (1) foot
above ultimate condition whichever is hipher).
) For non-residential structures, the lowest floor (including basement)
must be elevated or floodproofed to two (2) feet above the 100-year
base flood elevation. Hlnimum finished floor elevations must be
shown on the plat or site plan as approved by the City Engineer.
(The lowest floor must be elevated two (2] feet above BFE, or one (1]
foot above ultimate condition whichever is higher.
( ] Permittee must submit a certification from a registered professional
engineer, architect, or land surveyor that the finished floor level
of the residential structure has been constructed two (2J feet above
the 100-year base flood elevation, or 6ne (1) foot above ultimate
condition ~h£chever is higher.
( J For non-residential floodpruofing, a registered professional engineer
or architect must certify that the floodproofing methods are adequate
to withstand the flood depths, pressures, velocities, impact and
uplift forces and other factors associated with the base flood.
] For fill activities, the permittee must submit a certification from
an engineer or land surveyor that the level of the compacted fill
material is at or above the elevation of the Base Flood.
( ) Provide certified copy of all final plans or As-Built Drawings to
the ~JI4IN~STRATOR.
SIGNATURE OF ADMINISTRAT~ ~- $~~l~~ DATE
HOLD HARMLR.~S AGREEMENT
I~ ~,, ~~'c'.. ~ ~ ~. ~
tJL~.~ o, ,~ ~'~',~'~ ~°°'
~ ~ ~ 100 - . ~- 100'
~. ~ ·
k~ ~
...-./ .
~t.~' , '
, ~ : 1~' 1~. ~
~ " NOR r~,.
No~rHLAKE I~OODLANO$ ~ FI~T~ $Ecrlo~ ADD~ ~