Northlake 635(3)-LR 980402Bray R. blcD,~, Cha/rman
}oim bi. Baktx, Commir~ioner
~ D~n P~ano~, ~ecU~toeDirector
TEXAS NATURAL RESOURCE CONSERVATION COMMI
Prot~ctin~ 7~a~ 6y Reducing and P,,tnnting ~ttution
April 2, 1998
Mr. Dean T. Myers
F. avironmental Manager
Pioneer Concrete of Texa~, Inc.
8.50:5 Freeport Parkway, Suite 200
Irving, Texas 75063
Exemption RegisWafion No. 37476
Concrete Baw. h Plant
Coppell, Dallas Count7
.Account ID No. 92-0512-W
Dear Mr. Myers:
This is in response to your exemption registration, Form PI-7, conce
construction of a concrete batch plant m be located at 1401 South Belt'way
County.
After evaluation of the information which you have fvmisbrd, we have
proposed consU'UCtion is exempt from permilxing procedures under 30 'I
Code ('FAC) Sections 106.2U2 and 106.512 if constructed ami operated
registration. These exempflor~ were authorized by ~be Texas Natural Re
Commission (TNRCC) Executive Director pum,~,,,t to 30 TAC Chapter
ex.rip, om in effect at u'g time of this re~Umi~ i~ ~ncloscd. You mu~ o:
wi~ all requireg~n~s of ~be enclosed exemptions. Also enclosed is a notif
to complete and send ia prior to your move.
You are reminded that regardless of whefi~er a permit is required, rhese
compliance with all rules and regulations of the TNRCC and of
Protection Agency at all fim~s.
You are advised timt we will void th~ previous exemption rcgisl~tion f'fl
your facility. If you desire to move back to tiz previous sim, it wi]] be ne~
exemption or obtain a permit to operate at time site.
P.O, Box 13087 * Austin, T~xu 78711.3087 · 512/2394000 · Interact address:
]SION
~ the proposed
in Coppell, Dallas
:r~rmiv. cd ~ your
exu Administrative
,-, described in your
~ource Conservagon
06. A copy of ~be
era~ in accordance
:aflon form for you
~cilkies mu~ bc in
U.S. Environmental
upon relocation of
:ssary to register' for
~vw.tn rcc.st~te.~.us
Mr. De, anT. Myers
Page 2
~'i~ 2~ 1998
Re: Exemption Registration No. 37476
Your cooperation in fids matter is appreciated. If you have any questio=
exemptions, please call Ms. H¢lga Chatelle a! ($12) 239-1585 or write he
Resource Conservation Commission, Off'we of'Air Quality, New Sourc
Division (MC-162), P.O. Box 13087, Auslin, Teocas 78711-3087.
Sincerely,
Director
New Source Review Permits Division
Tmtas Natural Resource Conservation Commission
VH/HCIrl
Enclosures
cc: Mr. Jesse Macias, Air Program M~n~ger, Arlington
l~co~ No.~q42S
~ uo~/uug
concerning these
at Texas Natural
Review Permits
CONCRETE COMPI SSIVE STRENGTH TE'Y
Date of Service: 03/24/1998 Report No.:
Client No.: 52617000 Project No.:
Client: Lincoln Property Company Project:
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
980801
43-245'.
Coppel
Belt Li~
Coppel
Services: Obtain samples of fresh concrete at the placement locations, perform requi
compressive strength samples.**
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 27
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi ~ 28 Days
5"
N/A
ASTM C- 143
ASTM C- 172
ASTM C-39
PROJECT DATA
CONCRETE CLASS: 9349
PLACEMENT DATE: 03/24/1998
TIME SAMPLED: 1:25 pm BY:
WEATHER CONDITIONS: Clear,
TEMPERATURE (F) - AIR 78 F 1
TRUCK NO: 526 TICK
AIR CONTENT (%): N/A Ur
PLACEMENT LOCATION:
Piers, Building D
SAMPLE LOCATION: 1-E.4, l-E.6, I-F
CYLINDER MEASURED
MARKED SLUMP DATE
SET NO. (inches) TESTED
1 1 6.25 03/31/1998
1 2 6.25 03/31/1998
1 3 6.25 04/21 / 1998
I 4 6.25 04/21/1998
REPORT OF TESTS
MAXIMUM
AGE LOAD
(days) (lbs. force)
7 88010
7 84810
Average
28
28
AI
Technician time on report 9808018.
Technician: Brian Otis
Report Distribution:
(l) Lincoln Property Company
(1) Butler Construction
(I) O'Brien & Associates
(I) AECC, Inc.
Started:
(l) City of Coppell/BIdg. Insp.
(l) City of Coppell/Constr. Insp.
Finished:
-97
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
04/02/1998
Business Center II
te Rd. & Lakeshore Dr.
Texas
ed field test and cast
BATCHTIME: 12:08 pm
~rian Otis
farm
2ONCRETE: 74 g
CT NO: 664622
IIT WEIGHT (pc0: N/A
2CUMULATIVE YARDS: 10
COMPRESSIVE
STRENGTH FRACTURE
(psi) TYPE
3110
3000
3060
IEug~e Harbour
'this report is exclusively tbr the usc of the client indicated above and shall not be reproduced except in full without thc wi
Vice President
ittan approval of HBC Engineering, Inc.
01AK Page 1 of I
CONCRETE COMPR/ SIVE STRENGTH TE?
Date of Service: 03/23/1998 Report No.:
Client No.: 52617000 Project No.:
Client: Lincoln Property Company Project:
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
9807902
43-2452
Coppell
Belt Lin
Coppel[
Services: Obtain samples of fresh concrete at the placement locations, perform requi~
compressive strength samples.**
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 22
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi ~ 28 Days
6"
N/A
ASTM C-143
ASTM C- 172
ASTM C-39
PROJECT DATA
CONCRETE CLASS: 9349
PLACEMENT DATE: 03/23/1998
TIME SAMPLED: 1 1:23 am BY: [
WEATHER CONDITIONS: Clear, m
TEMPERATURE (F) - AIR 70 F C
TRUCK NO: 373 TICK[
AIR CONTENT (%): N/A UN
PLACEMENT LOCATION:
Piers, Building D
SAMPLE LOCATION: A-2.1, A-2, A-3
REPORT OF TESTS
CYLINDER MEASURED MAXIMUM
MARKED SLUMP DATE AGE LOAD
SET NO. (inches) TESTED (days) (lbs. force)
1 1 6.50 03/30/1998 7 115140
I 2 6.50 03/30/1998 7 114280
Average
I 3 6.50 04/20/1998 28
1 4 6.50 04/20/1998 28
A£
Note: Concrete placed in piers was taken from slab placement on Bui
Technician time on report 9807902.
Technician: Brian Otis
Report Distribution:
(1) Lincoln Property Company
(l) Butler Construction
(l) O'Brien & Associates
(l) AECC, Inc.
Started:
(I) City ofCoppell/BIdg. Insp.
( I ) C it3, of Coppell/Constr. Insp.
Finished:
ENGINEERING, INC.
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
04/02/1998
-97
Business Center II
: Rd. & Lakeshore Dr.
Texas
ed field test and cast
BATCH TIME: 10:45 am
.rian Otis
lid
~)NCRETE: 75 F
TNO: 645363
TWEIGHT (pcO: N/A
CUMULATIVE YARDS:
COMPRESSIVE
STRENGTH
(psi)
4070
4040
4060
[ding C.
ng, Inc.
Sugene Harbour
Vice President
10
This report is exclusively tbr the usc of the client indicated above and shall uot be reproduced except in full without the w
OIAK Page I of 1
FRACTURE
TYPE
ttcn approval of HBC Engineering, Inc.
CONCRETE COMPR( SIVE STRENGTH'
Date of Service: 03/23/1998 Report No.:
Client No.: 52617000 Project No.:
Client: Lincoln Property Company Project:
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
980790
43-245~
Coppell
Belt Li[
Coppeli
Services: Obtain samples of fresh concrete at the placement locations, perform requi
compressive strength samples.**
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 19
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi ~ 28 Days
5"
N/A
ASTM C-143
ASTM C- 172
ASTM C-39
SAMPLE LOCATION: A/4
CYLINDER
MARKED
SET NO.
PROJECT DATA
CONCRETE CLASS: 9349
PLACEMENT DATE: 03/23/1998
TIME SAMPLED: 8:55 am BY:
WEATHER CONDITIONS: Partly
TEMPERATURE (F) - AIR 60 F
TRUCK NO: 1823 TICm
AIR CONTENT (%): N/A Ul~
PLACEMENT LOCATION:
Slab, west end, Building C, A-H & 3-5
REPORT OF TESTS
MEASURED MAXIMUM
SLUMP DATE AGE LOAD
(inches) TESTED (days) (lbs. force)
I 1 5.00 03/30/1998 7 106230
1 2 5.00 03/30/1998 7 108020
Average
I 3 5.00 04/20/1998 28
1 4 5.00 04/20/1998 28
AC
This report is exclusively for thc usc of thc client indicatcd abovc and shall not be reproduced except in full without the ~
01AK Page I of 6
ENGINEERING, INC.
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
-97
Report Date
04/02/1998
Business Center II
e Rd. & Lakeshore Dr.
Texas
ed field test and cast
BATCHTIME: 7:55 am
)amon Elrod
oudy, sunny
IONCRETE: 64 F
;TNO: 630184
IT WEIGHT (pc/): N/A
:CUMULATIVE YARDS: 30
COMPRESSIVE
STRENGTH
(psi)
3760
3820
3790
FRACTURE
TYPE
tten approval of HBC Engineering, Inc.
· CONCRETE COMPR t' SIVE STRENGTH
Date of Service:
Client No.:
Client:
03/23/1998
52617000
Lincoln Property Company
3300 Lincoln Plaza~Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Report No.: 9807901
Project No.: 43-2452
Project: Coppell
Belt Lin
Coppell
Services: Obtain samples of fresh concrete at the placement locations, perform requi~
compressive strength samples.**
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 19
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi ~ 28 Days
5"
N/A
ASTM C- 143
ASTM C- 172
ASTM C-39
PROJECT DATA
CONCRETE CLASS: 9349
PLACEMV. NT DATE: 03/23/1998
TIME SAMPLED: 10:12 am BY:
WEATHER CONDITIONS: Partly
TEMPERATURE (ID - Am 61 F
TRUCK NO: 410 TICK!
AIR CONTENT (%): N/A uN
PLACEMENT LOCATION:
See page I
SAMPLE LOCATION: C.5/4.5
REPORT OF TESTS
CYLINDER MEASURED MAXIMUM
MARKED SLUMP DATE AGE LOAD
SET NO. (inches) TESTED (days) (lbs. force)
2 ! 5.25 03/30/1998 7 100940
2 2 5.25 03/30/1998 7 106220
Average
2 3 5.25 04/20/1998 28
2 4 5.25 04/20/1998 28
Note: Potter Concrete controlled water.
This report is exclusively tbr the use oftbe client indicated above and shall not be reproduced except in full without the v
01AK Page 2 of 6
8901 Carpenter Frwy., Suite gl00
Dallas, Texas 75247
-97
Report Date
04/O2/1998
Business Center II
e Rd. & Lakeshore Dr.
Texas
'ed field test and cast
BATCH TIME: 9:30 am
)amon Elrod
oudy, sunny
ONCRETE: 70 F
:TNO: 65346
IT WEIGHT (pcO: N/A
Al ~CUMULATIVE YARDS:
COMPRESSIVE
STRENGTH
(psi)
3570
3760
3670
130
FRACTURE
TYPE
itten approval of HBC Engineering, Inc.
CONCRETE COMPI:C. SIVE STRENGTH
Date of Service: 03/23/! 998 Report No.:
Client No.: 52617000 Project No.:
Client: Lincoln Property Company Project:
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
980790
43-245;
Coppeli
Belt Lit
Coppell
Services: Obtain samples of fresh concrete at the placement locations, perform requi~
compressive strength samples.**
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 19
SPECIFICATION REQUIREMENTS
STRENGTU: 4000 psi ~ 28 Days
5"
N/A
ASTM C-143
ASTM C- 172
ASTM C-39
SAMPLE LOCATION: D.5/3.5
-97
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
04/02/1998
Business Center II
e Rd. & Lakeshore Dr.
Texas
ed field test and cast
PROJECT DATA
CONCm~TE CLASS: 9349
PLACEMENT DATE: 03/23/1998
TIME SAMPLED: 11: ! 5 am BY: IDamon Elrod
WEARIER CONDmONS: Sunny, l~artly cloudy
TEMPERATURE (F} - AIR 70 F qONCRETE: 70 F
TRUCKNO: 802 TICKI~TNO: 645364
un IT WEIGHT (pcf): N/A
AIR CONTENT (%): N/A
PLACEMENT LOCATION:
See page i
BATCHTIME: 10:55 am
itten approval of HBC Engineering, Inc.
FRACTURE
TYPE
This report is exclusively tbr tile use of the client indicated above and shall not be reproduced except in full without the ~
01AK Page 3 of 6
Note: Potter Concrete controlled water.
3 3 6.00 04/20/1998 28
3 4 6.00 04/20/1998 28
3 l 6.00 03/30/1998 7 115950
3 2 6.00 03/30/1998 7 115110
Average
CYLINDER MEASURED MAXIMUM
MARKED SLUMP DATE AGE LOAD
SET NO. (inches) TESTED (days) (lbs. force)
REPORT OF TESTS
AC:CUMULATIVE YARDS: 230
COMPRESSIVE
STRENGTH
(psi)
4100
4070
4O90
'CONCRETE COMPR SIVE STRENGTH TE '
Date of Service: 03/23/1998
Client No.: 52617000
Client: Lincoln Property Company
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Report No.: 9807901
Project No.: 43-2452
Project: Coppell
Belt Lin
Coppell,
Services: Obtain samples of fresh concrete at the placement locations, perform requi~
compressive strength samples.**
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 19
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi ~ 28 Days
5"
N/A
ASTM C- 143
ASTM C- 172
ASTM C-39
SAMPLE LOCATION: F.5/4
PROJECT DATA
CONCRETE CLASS: 9349
PLACEMENT DATE: 03/23/1998
TIME SAMPLED: 1:25 pm BY: [
WEATHER CONDITIONS: Sunny tc
TEMPERATURE (F) - AIR 74 F C
TRUCK NO: 729 TICK~
AIR CONTENT (%): N/A UN]
PLACEMENT LOCATION:
See page 1
REPORT OF TESTS
CYLINDER MEASURED
MARKED SLUMP DATE
SET NO. (inches) TESTED
4 I 5.25 03/30/1998
4 2 5.25 03/30/1998
MAXIMUM
AGE LOAD
(days) (lbs. force)
7 112190
7 113670
Average
4 3 5.25 04/20/1998 28
4 4 5.25 04/20/1998 28
AC
Note: Potter Concrete controlled water.
This report is exclusively tbr thc usc of the client indicated above and shall not be reproduced except in full without thc wri~
01AK Page 4 of 6
ENGINEERING, INC.
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
O4/O2/1998
-97
Business Center II
~ Rd. & Lakeshore Dr.
Texas
ed field test and cast
BATCH TIME: 12:40 pm
,amon Elrod
partly cloudy
~)NCRETE: 78 F
TNO: 645394
T WEIGHT (pet): N/A
CUMULATIVE YARDS: 330
COMPRESSIVE
STRENGTH
(psi)
3970
4020
4000
FRACTURE
TYPE
ten approval of HBC Engineering, Inc.
CONCRETE COMP SIVE STRENGTH'
Date of Service: 03/23/I 998 Report No.:
Client No.: 52617000 Project No.:
Client: Lincoln Property Company Project:
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
980790
43-245~
Coppell
Belt Lit
Coppell
Services: Obtain samples of fresh concrete at the placement locations, perform requil
compressive strength samples.**
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 19
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi @ 28 Days
N/A
ASTM C- 143
ASTM C- 172
ASTM C-39
PROJECT DATA
CONCRETE CLASS: 9349
PLACEMENT DATE: 03/23/1998
TIME SAMPLED: 3:15 pm BY:
WEATHER CONDITIONS: Partly
TEMPERATURE (F) - AIR 76 F C
TRUCK NO: 802 TICK1
AIR CONTENT (%): N/A UN
PLACEMENT LOCATION:
See page I
SAMPLE LOCATION: G.5/5
REPORT OF TESTS
CYLINDER MEASURED MAXIMUM
MARKED SLUMP DATE AGE LOAD
SET NO. (inches) TESTED (days) (lbs. force)
5 1 5.50 03/30/1998 7 106340
5 2 5.50 03/30/1998 7 105530
Average
5 3 5.50 04/20/1998 28
5 4 5.50 04/20/1998 28
Note: Potter Concrete controlled water.
This report is exclusively tbr the use of the client indicated above and shall not be reproduced except in full without thc wri
01AK Page 5 of 6
ENGINEF_RING, INC.
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
-97
Report Date
04/02/1998
Business Center II
e Rd. & Lakeshore Dr.
Texas
ed field test and cast
BATCH TIME: 2:40 pm
)amon Elrod
oudy, sunny
ONCRETE: 80 F
',T NO: 645416
IT WEiG~rr (oeO: N/A
A 2CUMULATIVE YARDS: 430
COMPRESSIVE
STRENGTH
(~i)
3760
3730
3750
FRACTURE
TYPE
ttcn approval of HBC Engineering, Inc.
'CONCRETE COMPRr SIVE STRENGTH
Date of Service: 03/23/1998
Report No.: 9807901
Client No.: 52617000
Project No.: 43-2452,
Client: Lincoln Property Company Project:
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Coppell
Belt Lin,
Coppell,
Services: Obtain samples of fresh concrete at the placement locations, perform requir
compressive strength samples.**
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 19
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi ~ 28 Days
5"
N/A
ASTM C- 143
ASTM C- 172
ASTM C-39
PROJECT DATA
CONCRETE CLASS: 9349
PLACEMENT DATE: 03/23/1998
TIME SAMPLED: 6:20 pm nY: 12
WEATHER CONDITIONS: Partly ck
TEMPERATURE (F} - AIR 81 F
TRUCK NO: 1804 TICKE
AIR CONTENT (%): N/A UN!
PLACEMENT LOCATION:
Sec page I
SAMPLE LOCATION: P.5/2.5
CYLINDER
MARKED
SET NO.
REPORT OF TESTS
MEASURED MAXIMUM
SLUMP DATE AGE LOAD
(inches) TESTED (days) (lbs. force)
6 1 5.50 03/30/1998 7 122770
6 2 5.50 03/30/1998 7 129910
Average
6 3 5.50 04/20/1998 28
6 4 5.50 04/20/1998 28
AD
Note: Potter Concrete ordered 50 yds. more of concrete.
ENGINEERING, INC.
89Ol Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
04/02/1998
.97
Business Center II
~' Rd. & Lakeshore Dr.
Texa.5_
~d field test and cast
BATCH TIME: 5: 15 pm
smon Elrod
~udy, sunny
)NCRETE: 80 F
rNO: 635280
WEIGHT (pc0: N/A
UMULATIVE YARDS: 530
;OMPRESSIVE
STRENGTH
(psi)
4340
4590
4470
FRACTURE
TYPE
Technician: Damon Elrod
Report Distribution:
(l) Lincoln Property Company
(I) Butler Construction
(I) O'Brien & Associates
(I) AECC, inc.
01AK
Started: 7:00 am
( 1 ) City of Coppell/BIdg. Insp.
( 1 ) City of Coppell/Constr. lnsp.
Finished: 7:00 pm
This report is exclusively tbr the use of the client indicated above and shall not be reproduced except in full without the wril~
Page 6 of 6
Vice President
en approval of HBC Engineering, Inc.
CONCRETE COMPRr'SSIVE STRENGTH
Date of Service: 02/24/1998 Report No.:
Client No.: 52617000 Project No.:
Client: Lincoln Property Company Project:
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
980582~
43-2452
Coppeli
Belt Lin
Coppeli
Services: Obtain samples of fresh concrete at the placement locations, perform requl~
compressive strength samples.**
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 22
SPECIFICATION REQUIREMENTS
STRENaT}~: 3500 psi ~ 28 Days
5"
N/A
ASTM C- 143
ASTM C- 172
ASTM C-39
PROJECT DATA
CONCRETE CLASS: 9337
PLACEMENT DATE: 02/24/1998
TIME SAMPLED: 10:24 am BY:
WEATHER CONDITIONS: Clear,
TEMPERATURE (F) - AIR 64 F
TRUCK NO: 552 TICKI
AIR CONTENT (%): N/A un
PLACEMENT LOCATION:
Piers, Building B
SAMPLE LOCATION: 8E, 9E, 10E
CYLINDER
MARKED
SET NO.
MEASURED
SLUMP
(inches)
1 I 5.75
1 2 5.75
1 3 5.75
1 4 5.75
Technician time on report
REPORT OF TESTS
DATE
TESTED
03/03/1998
03/03/1998
MAXIMUM
AGE LOAD
(days) (lbs. force)
7 91190
7 89700
Average
28 113400
28 117510
Average
03/24/1998
03/24/1998
9805823.
Technician: Brian Otis
Report Distribution:
(I) Lincoln Property Company
(I) Butler Construction
(I) O'Brien & Associates
(I) AECC, Inc.
Started:
(I) City ofCoppell/BIdg. Insp.
( l ) City of Coppell/Constr. Insp.
Finished:
A(
.97
ENGINEERING, INC.
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
04/02/1998
Business Center II
e Rd. & Lakeshore Dr.
Texas
'ed field test and cast
BATCHTIME: 9:50 am
~rian Otis
lid
£ ONCRETE: 70 F
:TNO: 633871
[T WEIGHT (pet): N/A
:CUMULATIVE YARDS:
COMPRESSIVE
STRENGTH
(psi)
3220
3170
3200
4010
4160
4090
lnc.
This report is exclusively tbr the use of the client indicated above and shall not be reproduced except in full without the wr
Eugene Harbour
Vice President
10
FRACTURE
TYPE
ittcn approval of HBC Engineering, Inc.
01AK Page I of I
CONCRETE COMPRt ,SIVE STRENGTH
Date of Service:
Client No.:
Client:
Services:
03/03/1998
52617000
Lincoln Property Company
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Report No.: 980636~
Project No.: 43-2452
Project: Coppell
Belt Lin
Coppell,
Obtain samples of fresh concrete at the placement locations, perform requit
compressive strength samples.**
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 22
SPECIFICATION REQUIREMENTS
STRENGTH: 3500 psi ~ 28 Days
4"
N/A
ASTM C- 143
ASTM C- 172
ASTM C-39
PROJECT DATA
CONCRETE CLASS: 9337
PLACEMENT DATE: 03/03/1998
TIME SAMPLED: 9:32 am BY: ]~
WEATHER CONDITIONS: Clear, cc
TEMPERATURE (F) - AIR 48 F C~
TRUCK NO: 730 TICKE
AIR CONTENT (%): N/A UNI
PLACEMENT LOCATION:
Piers on Building B
SAMPLE LOCATION: F-9.9, F-9.5, F-9
CYLINDER
MARKED
SET NO.
MEASURED
SLUMP
(inches)
1 1 6.00
I 2 6.00
1 3 6.00
1 4 6.00
REPORT OF TESTS
MAXIMUM
DATE AGE LOAD
TESTED (days) (lbs. force)
03/10/1998 7 114190
03/10/1998 7 117910
Average
03/31/1998 28 134300
03/31/1998 28 139840
Average
AC
Technician: Brian Otis
Report Distribution:
(1) Lincoln Property Company
(1) Butler Construction
(!) O'Bricn & Associates
(!) AECC, Inc.
Started: Finished:
(I) City of Coppell/Bldg. Imp.
(I) City of Coppeli/Conslr. Imp.
This report is exclusively for the usc of the client indicated above and shall not be reproduced except in full without the wr
01AK
Page I of I
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
04/02/1998
.97
BuSiness Center II
~ Rd. & Lakeshore Dr.
Texas
ed field test and cast
BATCH TIME: 9:00 am
rian Otis
ol
)NCRETE: 60 F
rNo: 651450
T WEIGHT (pe0: N/A
UUMULATIVE YARDS:
~OMPRESSIVE
STRENGTH
(psi)
4040
4170
4110
4750
4950
4850
10
FRACTURE
TYPE
g~ riarbour
Vice President
ten approval of HBC
Engineering, Inc.