Northlake 635(3)-LR 980403iN-PLACE DENSITY ESTING
Date of Service: 03/22/1998
Client No.:
Client:
Services:
52617000
Lincoln Property Company
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
In-place density testing.
CONTRACTOR: Butler Construction
MOISTURE DENSITY RELATIONS:
M/D No. Description
1 Lt gray/red/med brn/shaley cl
2 Gray limestone
TEST
NO TEST LOCATION
Bldg. B Plumbing
551 Final lift, 50'S/N
552 1' below surface, 52'S/N
553 2' below surface, 55'S/N
554 3' below surface, 65'S/N
555 4' below surface, 67'S/N
556 5' below surface, 70'S/N
557 6' below surface, 72'S/N
558 Final lift, 150'S/N
559 1' below surface, 152'S/N
560 2' below surface, 155'S/N
561 3' below surface, 165'S/N
Report No.: 980786
Project No.: 43-245:
Project: Coppel]
Belt Lil
Coppell
PROJECT DATA
Laboratory Test Method:
Field Test Method:
ASTI~
ASTN
ASTN
Maximum
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
.97
Report Date
04/03/1998
Business Center II
te Rd. & Lakeshore Dr.
Texas
iD-698
ID-2922
[D-3017
Project Requirements
Moisture % Density pcf
23.5 98.5
16.0 111.5
FIELD DENSITY TESTS
M/D MOISTURE
No. (%)
2 17.6
2 17.0
1 27.0
1 26.9
1 26.7
1 26.8
1 26.9
2 17.3
2 17.6
1 27.0
I 27.3
This rcport is exclusively tbr thc usc of thc client indicated above and shall not be reproduced except in full without thc wri
Moisture Density
+3% 92%
-/+2% 95%
DRY DENSITY DENSITY
(pci) (% max)
109.4 98
110.1 99
93.7 95
92.9 94
93.5 95
94.2 96
94.0 95
109.8 99
109.2 98
94.2 96
93.7 95
ttcn approval of tiBC Engineering, Inc.
07MP Page 1 of 2
Report No.: 9807869
TEST
NO
TEST LOCATION
M/D MOISTURE
No. (%)
562 4' below surface, 170'S/N
563 5' below surface, 172'S/N
564 6' below surface, 175'S/N
565 Final lift, 275'S/N
566 i' below surface, 27TS/N
567 2' below surface, 280'S/N
568 3' below surface, 285'S/N
569 4' below surface, 290'S/N
570 Final lift, 380'S/N
571 1' below surface, 382'S/N
572 2' below surface, 385'S/N
I 27.2
1 26.9
1 26.9
2 17.5
I 27.3
I 27.8
1 27.5
I 27.1
2 16.9
1 27.0
1 26.8
Test results on this report meet project specification.
DRY DENSITY DENSITY
(pcf) (% max)
93.6 95
93.8 95
93.3 95
110.3 99
94.3 96
94.0 95
94.1 96
93.7 95
112.7 101
93.3 95
93.7 95
Technician: Tex King
Report Distribution:
(1) Lincoln Property Company
(I) Butler Construction
(I) O'Brien & Associates
(I) AECC, luc.
(1) City ofCoppcll/Bldg, lnsp.
( 1 ) City of Coppell/Constr. lnsp.
This report is exclusively for the usc of thc client indicated above and shall not bc reproduced except in thll without thc writ
I~ Eni~ng, Inc.
Pa ul D. Smith, P.E.
Scl dor Project Engineer
~en approval of HBC Engineering, Inc.
07MP Page 2 of 2
'CONCRETE COMPR oSIVE STRENGTH TED
Date of Service: 03/04/1998
Report No.: 980644~
Client No.: 52617000 Project No.: 43-2452
Client: Lincoln Property Company Project:
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Coppell
Belt Lin
Coppell
Services: Obtain samples of fresh concrete at the placement locations, perform requi]
compressive strength samples.**
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLA~rr: 22
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi ~ 28 Days
5"
N/A
ASTM C- 143
ASTM C- 172
ASTM C-39
PROJECT DATA
CONCRETE CLASS: 9349
PLACEMENT DAT~: 03/04/1998
TIME SAMPLED: 4:45 am BY:
WEATHER CONDITIONS: Windy,
TEMPERATURE (F) - AIR 40 F (
TRUCK NO: 1805 TICKI
AIR CONTENT (%): N/A
PLACEMENT LOCATION:
Slab-on-grade, Building A floor, lines 1-1 l,
SAMPLE LOCATION: 10E, 2 ft. W of line E
CYLINDER
MARKED
SET NO.
REPORT OF TESTS
MEASURED MAXIMUM
SLUMP DATE AGE LOAD
(inches) TESTED (days) Obs. force)
01 1 4.75 03/11/1998 7 103110
01 2 4.75 03/I 1/1998 7 106660
Average
01 3 4.75 04/01/1998 28 138600
01 4 4.75 04/01/1998 28 133720
Average
A(
This report is exclusively for thc use of thc client indicated above and shall not be reproduced except in full without the ~
01AK Page I of 10
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
.97
Report Date
04/03/1998
Business Center II
e Rd. & Lakeshore Dr.
Texas
ed field test and cast
BATCHTIME: 4:05 am
ack Farris
:old
'ONCRETE: 62 V
:THO: 651548
IT WZIG~rr (pc0: N/A
:CUMULATIVE YARDS: 50
COMPRESSIVE
STRENGTH
(psi)
3650
3770
3710
4900
4730
4820
FRACTURE
TYPE
itten approval of HBC Engineering, Inc.
*CONCRETE COMPRI'" SIVE STRENGTH
Date of Service:
Client No.:
Client:
03/04/1998
52617000
Lincoln Property Company
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Report No.: 9806445
Project No.: 43-2452
Project: Coppell
Belt Lin
Coppell,
Services: Obtain samples of fresh concrete at the placement locations, perform re. quit
compressive strength samples.**
SLUMP:
AIR:
TEST METHOD:
CONTanCTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLA~r: 22
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi ~ 28 Days
5"
N/A
ASTM C-143
ASTM C- 172
ASTM C-39
SAMPLE LOCATION:
Line 8C, 6 ft. N & 5 ft. E
PROJECT DATA
CONCRETE CLASS: 9349
PLACEME~rr DATE: 03/04/1998
TIME SAMPLED: 5.'30am BY: J
WEATHER commons: Windy,
TEMPERATURE (F) - AlU 48 v c
TRUCK NO: 846 TIcK~
AIR co~rrEt~r (%): N/A UN
PLACEMENT LOCATION:
See page 1
CYLINDER
MARKED
SET NO.
REPORT OF TESTS
MEASURED MAXIMUM
SLUMP DATE AGE LOAD
(inches) TESTED (days) (lbs. force)
02 1 5.25 03/11/1998 7 106590
02 2 5.25 03/11/1998 7 102710
Average
02 3 5.25 04/01/1998 28 123770
02 4 5.25 04/01/1998 28 119300
Average
A(
This report is exclusively for thc usc of thc client indicated above and shall not be reproduced except in full without thc wr
01AK Page 2 of 10
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
-97
Report Date
04/03/1998
Business Center II
~ Rd. & Lakeshore Dr.
Texas
ed field test and cast
BATCH TIME: 4:59 am
~ck Farris
:old
DNCRETE: 69 F
TNO: 651557
WEIGHT (pct'): N/A
CUMULATIVE YARDS: 140
COMPRESSIVE
STRENGTH
(p~i)
3770
3630
3700
4380
4220
4300
tten approval of HBC Engineering, In~.
CONCRETE COMPRr'3SIVE STRENGTH
Date of Service:
Client No.:
Client:
Services:
03/04/1998
52617000
Lincoln Property Company
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Report No.: 980644~
Project No.: 43-2452
Project: Coppell
Belt Lin
Coppell
Obtain samples of fresh concrete at the placement locations, perform requi~
compressive strength samples.**
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 22
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi ~ 28 Days
5"
N/A
ASTM C-143
ASTM C- 172
ASTM C-39
PROJECT DATA
CONCRETE CLASS: 9349
PLACEMENT OATZ: 03/04/1998
TIME SAMPLED: 6:50 am BY:
W~_~,THZR CONorrIONS: Cloudy
TEMPERATURE (F) - AIR 50 F
TRUCKNO: 373 TICKI
AIR CONTENT (%): N/A UN
PLACEMENT LOCATION:
Sec page I
SAMPLE LOCATION: Line 7E, 6 fi. N & 2 fi. W
CYLINDER
MARKED
SET NO.
REPORT OF TESTS
MEASURED MAXIMUM
SLUMP DATE AGE LOAD
(inches) TESTED (days) (lbs, force)
03 I 5.00 03/11/1998 7 95960
03 2 5.00 03 / 11 / 1998 7 92270
Average
03 3 5.00 04/01/1998 28 127090
03 4 5.00 04/01/1998 28 126080
Average
AC
This report is exclusively for thc use of thc clicnt indicated above and shall not be reproduced except in full without the
01AK Page 3 of 10
ENGINEERING, INC.
8901 Carpenter Frwy. Shire #100
Dallas, Texas 75247
Report Date
04/03/1998
.97
Business Center II
e Rd. & Lakeshore Dr.
Texas
ed field test and cast
BATCH TIME: 6:18 am
ack Farris
windy
ONCRETE: 62 F
,TNO: 651568
IT WEIGHT (pcO: N/A
CUMULATIVE YARDS: 230
COMPRESSIVE
STRENGTH
(psi)
3390
3260
3330
4490
4460
4480
ten approval of HBC Engineering, Inc.
CONCRETE COMP1L_ oSIVE STRENGTH
Date of Service: 03/04/1998 Report No.:
Client No.: 52617000 Project No.:
Client: Lincoln Property Company Project:
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
980644:
43-2455
Coppell
Belt
Coppell
Services: Obtain samples of fresh concrete at the placement locations, perform requi
compressive strength samples.**
PROJECT DATA
CONCaETE CLASS: 9349
PLACEMENT DATE: 03/04/1998
TIME SAMPLED: 7:55 am BY: .]
WEATHER CONDITIONS: Cloudy,
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 22
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi ~ 28 Days TEM~ERA~VlU~ (F) - AIR 54 F
SLUMP: 5" TRUCK NO: 730 TICKJ
AIR: N/A AIR CONTENT (%): N/A
TEST METHOD: AST1VI C- 143 PLACEMENT LOCATION:
See page 1
ASTM C- 172
ASTM C-39
Line 6C, 4 ft. N
SAMPLE LOCATION:
CYLINDER
MARKED
SET NO.
REPORT OF TESTS
MEASURED MAXIMUM
SLUMP DATE AGE LOAD
(inches) TESTED (daya) (lbs. force)
04 1 4.75 03/11/1998 7 99890
04 2 4.75 03/11/1998 7 98150
Average
04 3 4.75 04/01/1998 28 135740
04 4 4.75 04/01/1998 28 129760
Average
A~
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the ~
01AK Page 4 of 10
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
-97
Report Date
04/03/1998
Business Center II
e Rd. & Lakeshore Dr.
Texas
ed field test and cast
BATCH TIME:, 7:20 am
ack Farris
windy
:ONCRETE: 65 F
~no: 651580
IT WEIGHT (pc0: N/A
~CUMULATIVE YARDS: 340
COMPRESSIVE
STRENGTH
(psi)
3530
3470
3500
4800
4590
4700
itten approval of HBC Engineering, Inc.
CONCRETE COMPR t SIVE STRENGTH
Date of Service: 03/04/1998 Report No.:
Client No.: 52617000 Project No.:
Client: Lincoln Property Company Project:
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
9806441
43 -2452
Coppell
Belt Lit
Coppell
Services: Obtain samples of fresh concrete at the placement locations, perform requi:
compressive strength samples.**
PROJECT DATA
CONTRACTOR: Butler Construction CONCRETE CLASS: 9349
CONCRETE SUPPLIER: Pioneer Concrete PLACEMENT DATE: 03/04/1998
PLANT: 22 TIME SAMPLED: 8:40 am BY:
SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Cloudy,
STRENGTH: 4000 psi ~ 28 Days TEMPERATURE (F)- AIR 56 F
SLUMP: 5" TRUCK NO: 760 TICK]
AIR: N/A AIR CONTENT ('/.): N/A
TEST METHOD: ASTM C- 143 PLACEMENT LOCATION:
See page 1
ASTM C- 172
ASTM C-39
SAMPLE LOCATION:
Line 5D, 3 fi. N&3 fi. E
REPORT OF TESTS
CYLINDER MEASURED MAXIMUM
MARKED SLUMP DATE AGE LOAD
SET NO. (iaehe~) TESTED (days) (Ib~. force)
05 1 4.00 03/11/1998 7 137100
05 2 4.00 03/11/1998 7 134650
Average
05 3 4.00 04/01/1998 28 158440
05 4 4.00 04/01/1998 28 155240
Average
At
This report is exclusively for thc usc of thc clicnt indicatcd above and shall not ~ rcproduccd cxccpt in full without the ~
01AK Page 5 of 10
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
-97
Report Date
04/03/1998
Business Center II
e Rd. & Lakeshore Dr.
Texas
ed field test and cast
BATCH TIME: 8.'05 am
ack Farris
windy
'ONCRETE: 65 F
:TNO: 651591
IT WEIGHT (pcf): N/A
:CUMULATIVE YARDS: 440
COMPRESSIVE
STRENGTH
(psi)
4850
4760
4810
5600
5490
5550
FRACTURE
TYPE
itt~n approval of HBC Enginccring Inc.
CONCRETE COMPICr SIVE STRENGTH
Date of Service: 03/04/1998 Report No.:
Client No.: 52617000 Project No.:
Client: Lincoln Property Company Project:
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
980644:
43-2452
Coppell
Belt Lin
Coppell,
Services: Obtain samples of fresh concrete at the placement locations, perform requil
compressive strength samples.**
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 22
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi ~ 28 Days
5"
N/A
ASTM C- 143
ASTM C- 172
ASTM C-39
PROJECT DATA
CONCRETE CLASS: 9349
PLACEMENT OATE: 03/04/1998
TIME SAMPLED: 9:20 am aY: J
WEATHER CONDITIONS: Cloudy,
TEMPERATURE (F) o AIR 57 F c
TRUCK NO: 853 TICK[
AIR CONTENT (%): N/A UN
PLACEMENT LOCATION:
See page I
SAMPLE LOCATION: Line 4D, 2 fi. N
CYLINDER
MARKED
SET NO.
REPORT OF TESTS
MEASURED MAXIMUM
SLUMP DATE AGE LOAD
(inches) TESTED (days) (lbs. force)
06 1 4.25 03/11/1998 7 101670
06 2 4.25 03/11/1998 7 105840
Average
06 3 4.25 04/01/1998 28 138810
06 4 4.25 04/01/1998 28 142930
Average
A(
This report is exclusively for thc usc of thc client indicated above and shall not be reproduced except in full without the wri
01AK Page 6 of 10
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
.97
Report Date
04/03/1998
Business Center II
e Rd. & Lakeshore Dr.
Texas
'ed field test and cast
BATCH TIME: 8:45 am
ack Fan'is
windy
ONCRETE: 62 F
T NO: 651602
IT WEIGHT (PC0: N/A
CUMULATIVE YARDS:
COMPRESSIVE
STRENGTH
3600
3740
3670
4910
5050
4980
550
tten approval of HBC Engineering, Inc.
CONCRETE COMP SIVE STRENGTH
Date of Service: 03/04/1998 Report No.:
Client No.: 52617000 Project No.:
Client: Lincoln Property Company Project:
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
980644.'
43-2452
Coppeli
Belt Lin
CoppelL
Services: Obtain samples of fresh concrete at the placement locations, perform requi~
compressive strength samples.**
SLUMP:
AIR:
TEST METHOD:
conTRaCtOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLAlVr: 22
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi ~ 28 Days
5"
N/A
ASTM C-143
ASTM C- 172
ASTM C-39
SAMPLE LOCATION:
Line 4A
PROJECT DATA
CONCRetE CLASS: 9349
PLACEMENT DATE: 03/04/1998
TIME SAMPLED: 10:55 am BY: J
WEATHER CONDITIONS: Cloudy,
TEMPERATURE (F) - AIR 59 F C
TRUCK NO: 373 TICK~
AIR CONTENT (%): N/A UN
PLACEMENT LOCATION:
See page I
REPORT OF TESTS
CYLINDER MEASURED MAXIMUM
MARKED SLUMP DATE AGE LOAD
SET NO. (inches) TESTED (days) (lbs. force)
07 I 5.00 03/11/1998 7 94240
07 2 5.00 03/11/1998 7 97810
Average
07 3 5.00 04/01/1998 28 125440
07 4 5.00 04/01/1998 28 112800
Average
AC
This report is exclusively for the use of thc client indicated above and shall not be reproduced except in full without the wri
01AK Page 7 of 10
ENG--, INC.
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
-97
Report Date
04/03/1998
Business Center II
~ Rd. & Lakeshore Dr.
Texas
ed field test and cast
BATCH TIME: 10:09 am
~ek Farris
windy
DNCRETE: 69 F
TNO: 651619
~T WEIGHT (poi): N/A
CUMULATIVE YARDS: 640
COMPRESSIVE
STRENGTH
(psi)
3330
3460
3400
4440
3990
4220
FRACTURE
TYPE
tten approval of HBC Engineering, Inc.
CONCRETE COMPResSIVE STRENGTH
Date of Service: 03/04/1998 Report No.:
Client No.: 52617000 Project No.:
Client: Lincoln Property Company Project:
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394 ,.
980644.'
43-2452
Coppell
Belt Lin
Coppell:
Services: Obtain samples of fresh concrete at the placement locations, perform requil
compressive strength samples.**
SLUMP:
AIR:
TEST METHOD:
conTRaCtOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 22
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi ~ 28 Days
N/A
ASTM C- 143
ASTM C- 172
ASTM C-39
PROJECT DATA
CONCRETE CLASS: 9349
PLACEMENT DAT~: 03/04/1998
TIME SAMPLED: 12:05 pm BY: J
WEATHER CON,meNs: Cloudy,
TEMPERATURE (F) - AIR 60 F C
TRUCK NO: 730 TICK[
AIR CONTENT (%): N/A UN
PLACEMENT LOCATION:
See page I
SAMPLE LOCATION: Line 3E
CYLINDER MEASURED
MARKED SLUMP DATE
SET NO. (inches) TESTED
08 1 4.75 03/11/1998
08 2 4.75 03/11/1998
08 3 4.75 04/01/1998
08 4 4.75 04/01/1998
REPORT OF TESTS
MAXIMUM
AGE LOAD
(days) (lbs. force)
7 114240
7 117660
Average
28 135530
28 142140
Average
AC
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the wri
01AK Page 8 of 10
ENGINF_ERING, INC.
8901 Carpenter Frwy. Suite #100
Dallas, Texas 75247
,97
Report Date
04/03/1998
Business Center II
e Rd. & Lakeshore Dr.
Texas
ed field test and cast
BATCHTIME: 11:30 am
~ek Farris
windy
ONCRETE: 70 F
TNO: 651638
TWEIGHT (prO: N/A
CUMULATIVE YARDS: 750
COMPRESSIVE
STRENGTH
(psi)
4040
4160
4100
4790
5030
4910
~en approval of H BC Engineering Inc.
CONCRETE COMPR,t" SIVE STRENGTH
Date of Service: 03/04/1998 Report No.:
Client No.: 52617000 Project No.:
Client: Lincoln Property Company Project:
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
980644~
43-2452
Coppell
Belt Lin
Coppel[
Services: Obtain samples of fresh concrete at the placement locations, perform requil
compressive strength samples.**
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 22
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi ~ 28 Days
5"
N/A
ASTM C- 143
ASTM C- 172
ASTM C-39
PROJECT DATA
CONCRETE CLASS: 9349
PLACEMV_~r DATE: 03/04/1998
TIME SAMPLED: 1:30 pm BY: J
WEATHER CONDITIONS: Sunny, ~
TV. MPE~JRE(~)-Am 61 g C
TRUCK NO: 512 TICK[
AIR CONTENT (%): N/A UN
PLACEMENT LOCATION:
See page I
SAMPLE LOCATION: Line 2A, 4 ft. E
CYLINDER MEASURED
MARKED SLUMP DATE
SET NO. (inches) TESTED
09 1 5.00 03/11/1998
09 2 5.00 03/11/1998
09 3 5.00 04/01/1998
09 4 5.00 04/01/1998
REPORT OF TESTS
MAXIMUM
AGE LOAD
(days) (11~. force)
7 106260
7 109740
Average
28 130430
28 136470
Average
AC
This report is cxclusivcly for thc usc of thc clicnt indicated above and shall not be reproduced except in full without the wri'
01AK Page 9 of 10
ENGINEERING, INC.
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
,97
Report Date
04/03/1998
Business Center II
e Rd. & Lakeshore Dr.
Texas
ed field test and cast
BATCHTIME: 12:55 pm
ack Farris
tindy
DNCRETE: 72 F
TNO: 651656
[TWEIGHT (pc0: N/A
CUMULATIVE YARDS: 840
COMPRESSIVE
STRENGTH
(psi)
3760
3880
3820
4610
4830
4720
FRACTURE
TYPE
ten approval of HBC Engineering, Inc.
CONCRETE COMPR? SIVE STRENGTH
Date of Service: 03/04/1998 Report No.: 9806445
Client No.:
Client:
52617000
Lincoln Property Company
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Project No.: 43-2452
Project: Coppell
Belt Lin
Coppell,
Services: Obtain samples of fresh concrete at the placement locations, perform requit
compressive strength samples.**
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 22
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi (~ 28 Days
5"
N/A
ASTM C-143
ASTM C- 172
ASTM C-39
PROJECT DATA
CONCRETE CLASS: 9349
PLACEMENT DATE: 03/04/1998
TIME SAMPLED: 2:40 pm ny: J~
WEATHER CONOrrIONS: Sunny, v
TEMPERATURE (F) - AIR 61 F c
TRUCK NO: 1805 TICKE
AIR CONTENT (%): N/A UN]
PLACEMENT LOCATION:
See page I
SAMPLE LOCATION: Line ID, 5 ff. N
8901 Carpenter Frwy., Suite #100
Dallas, Texas 7S247
Report Date
04/03/1998
-97
Business Center II
: Rd. & Lakeshore Dr.
Texas
ed field test and cast
BATCH TIME: 2:10 pm
tek Farris
,indy
~)NCRETE: 76 F
rno: 651673
T WEIGHT (P~0: N/A
CYLINDER MEASURED
MARKED SLUMP DATE
SET NO. (inches) TESTED
10 I 5.00 03/11/1998
10 2 5.00 03/11/1998
10 3 5.00 04/01/1998
10 4 5.00 04/01/1998
REPORT OF TESTS
MAXIMUM
AGE LOAD
(days) (lbs. force)
7 90800
7 89730
Average
28 130770
28 129480
Average
Note: Between lines 2 & 3 and D & E, rutting occurred.
added, plus additional reinforcing steel.
Started: 3:00 am
(1) City ofCoppell/Bldg. Insp.
(I) City ofCoppell/Constr, lnsp.
Technician: Jack Farris
Report Distribution:
(1} Lincoln Property Company
{ i } Butler Construction
(1) O'Brien & Associates
(1) AECC, Inc.
Finished: 4:00 pm
AC
Uncompacted
CUMULATIVE YARDS: 930
COMPRESSIVE
STRENGTH
(~i)
3210
3170
3190
4620
4580
4600
TYPE
This rcport is cxclusivcly for the usc of thc client indicated abovc and shall not 5c reproduced cxeept in full without thc wt
soil was
Eng..
!ugene HarlY6ur
Vice President
ten approval of HBC Engineering Inc.
01AK Page 10 of 10
7 ~
I0
CONCRETE COMPRESSIVE STRENGTH
Date of Service: 03/25/1998
Client No.: 52617000
Client: Lincoln Property Company
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Report No.: 9808095
Project No.: 43-2452
Project: Coppell
Belt Lin
Coppell,
Services: Obtain samples of fresh concrete at the placement locations, perform requir
corn pressive strength samples.* *
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 27
SPECIFICATION REQUIREMENTS
STREN(;T~: 4000 psi ~ 28 Days
5"
3-6%
ASTM C- 143
ASTM C- 172
ASTM C-39
PROJECT DATA
CONCRETE CLASS: 3349
PLACEMENT DATE: 03/25/1998
TIME SAMPLED: 4:15 am BY: [~
WEATHER CONDITIONS: Partly cl,
TEMPERATURE (F) - AIR 64 F C,
TRUCK NO: N/A TICKE
AIR CONTENT (%): N/A
PLACEMENT LOCATION:
Building C slab, I-Q, 3-5
SAMPLE LOCATION: 4.5, 1.5
CYLINDER
MARKED
SET NO.
REPORT OF TESTS
MEASURED MAXIMUM
SLUMP DATE AGE LOAD
(inches) TESTED (days) (lbs. force)
1 1 5.00 04/01/1998 7 108640
I 2 5.00 04/01/1998 7 113650
Average
1 3 5.00 04/22/1998 28
1 4 5.00 04/22/1998 28
AC
This report is exclusively t'or the use of the client indicated above and shall not be reproduced except in full without thc wril
01AK Page 1 of 5
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
04/03/1998
-97
Business Center II
~ Rd. & Lakeshore Dr.
Texas
ed field test and cast
BATCH TIME: N/A
ddie Elrod
Judy, cool
)NCRETE: 70 F
r NO: N/A
T WEIGHT (PC0: N/A
UUMULATIVE YARDS:
~OMPRESSIVE
STRENGTH
(psi)
3840
4020
3930
10
FRACTURE
TYPE
ten approval of HBC Engineering, lac.
'CONCRETE COMPR,_ SIVE STRENGTH
Date of Service: 03/25/1998 Report No.:
Client No.: 52617000 Project No.:
Client: Lincoln Property Company Project:
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
980809:
43-2452
Coppell
Belt Lin
Coppell
Services: Obtain samples of fresh concrete at the placement locations, perform requi~
compressive strength samples.**
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 27
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi ~ 28 Days
5"
3-6%
ASTM C-143
ASTM C- 172
ASTM C-39
PROJECT DATA
CONCRETE CLASS: 3349
PLACEMENT DATE: 03/25/1998
TIME SAMPLED: 6:45 am BY:
WEATHER CONDITIONS: Partly
TEMPERATURE {F/- Am 64 F c
TRUCK NO: 749 TICKI
AIR CONTENT (%): N/A UN
PLACEMENT LOCATION:
See page I
SAMPLE LOCATION: 4.K
REPORT OF TESTS
CYLINDER MEASURED MAXIMUM
MARKED SLUMP DATE AGE LOAD
SET NO. (inches) TESTED (days) (lbs. force)
2 1 5.00 04/01/1998 7 119110
2 2 5.00 04/01/1998 7 116760
Average
2 3 5.00 04/22/1998 28
2 4 5.00 04/22/1998 28
A(
This report is exclusively tbr the use of the client indicated above and shall not be reproduced except in full without the
01AK Page 2 of 5
ENG--, INC.
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
.97
Report Date
04/03/1998
Business Center II
e Rd. & Lakeshore Dr.
Texas
'ed field test and cast
BATCH TIME: N/A
;ddie Elrod
audy, cool
ONCRETE: 68 F
:T NO: 664670
IT WEIGHT (pcl): N/A
:CUMULATIVE YARDS: 260
COMPRESSIVE
STRENGTH
(psi)
4210
4130
4170
ittcn approval of HBC Engineering, Inc.
"CONCRETE COMPResSIVE STRENGTH TED
Date of Service: 03/25/1998
Client No.: 52617000
Client: Lincoln Property Company
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Report No.: 9808095
Project No.: 43-2452.
Project: Coppell
Belt Lin,
Coppell,
Services: Obtain samples of fresh concrete at the placement locations, perform requir
compressive strength samples.**
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 27
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi ~ 28 Days
5"
3-6%
ASTM C- 143
ASTM C- 172
ASTM C-39
PROJECT DATA
CONCRETE CLASS: 3349
PLACEMENT DAT~: 03/25/1998
TIME SAMPLED: 8:00 am BY: l~
WEATHER CONDITIONS: Partly el,
TEMPERATURE (lq- AIR 66 F C
TRUCK NO: 749 TICK~
AIR CONTENT (%): N/A UN]
PLACEMENT LOCATION:
See page I
SAMPLE LOCATION: 4.7, M
CYLINDER
MARKED
SET NO.
REPORT OF TESTS
MEASURED MAXIMUM
SLUMP DATE AGE LOAD
(inches) TESTED (days) (lbs. force)
3 1 7.00 04/01 / 1998 7 100060
3 2 7.00 04/01/1998 7 101490
Average
3 3 7.00 04/22/1998 28
3 4 7.00 04/22/1998 28
AC
This report is exclusively for the usc of the client indicated above and shall not be reproduced except in full without thc
01AK Page 3 of 5
ENGINEERING, INC.
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
04/03/1998
.97
Business Center II
~ Rd. & Lakeshore Dr.
Texas
~d field test and cast
BATCH TIME: N/A
ddie Elrod
~udy, cool
)NCRETE: 70 F
NO: 664685
WEIGHT (pc0: N/A
CUMULATIVE YARDS: 360
COMPRESSIVE
STRENGTH
(psi)
3540
3590
3570
FRACTURE
TYPE
ten approval of HBC Engineering, Inc.
CONCRETE COMPR""SSIVE STRENGTH
Date of Service: 03/25/l 998
Client No.: 52617000
Report No.: 9808091
Project No.: 43-2452,97
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
04/03/1998
Client:
Services:
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 27
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi ~ 28 Days
3-6%
ASTM C- 143
ASTM C- 172
ASTM C-39
SAMPLE LOCATION: 4.5, N.2
CYLINDER
MARKED
SET NO.
Lincoln Property Company Project: Coppell
3300 Lincoln Plaza/Larry Moon Belt Lin
500 North Akard Street
Dallas TX 75201-3394 Coppell
Obtain samples of fresh concrete at the placement locations, perform requi~
compressive strength samples.**
PROJECT DATA
CONCRETE CLASS: 3349
PLACEMENT DATE: 03/25/1998
TIME SAMPLED: 9:45 am BY:
WEATHER CONDITIONS: Partly
TEMPERATURE (F) - AIR 70 F £ ONCRETE: 72
TRUCK NO: 803 TICK] ',T NO: 66470
AIR CONTENT (%): N/A
PLACEMENT LOCATION:
See page 1
REPORT OF TESTS
MAXIMUM
MEASURED
SLUMP DATE AGE LOAD
(inches) TESTED (days) (Ibs. brce)
4 I 5.25 04/01/1998 7 114100
4 2 5.25 04/01/1998 7 112510
Average
01AK
4 3 5.25 04/22/1998 28
4 4 5.25 04/22/1998 28
Business Center II
e Rd. & Lakeshore Dr.
Texas
This report is cxclnsivcly tbr thc usc of the client indicated above and shall not be reproduced cxccpt in full without thc wri
Page 4 of 5
ed field test and cast
BATCH TIME: 9:07 am
;ddie Elrod
audy, cool
ten approval of HBC Engineering, Inc.
CUMULATIVE YARDS: 450
COMPRESSIVE
STRENGTH
(psi)
4030
3980
4010
UN IT WEIGHT (pc0: N/A
' CONCRETE COMPRff'SSIVE STRENGTH
Date of Service:
Client No.:
Client:
Services:
CONTRACTOR:
CONCRETE SUPPLIER:
PLANT:
03/25/i 998
52617000
Lincoln Property Company
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Report No.: 980809~.
Project No.: 43-245~
Project: Coppell
Belt Lin
Coppell
Obtain samples of fresh concrete at the placement locations, perform requi~
eom pressive strength samples.**
-97
ENGINEERING, INC.
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
04/03/1998
SLUMP:
AIR:
TEST METHOD:
Butler Construction
Pioneer Concrete
27
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi (~ 28 Days
5"
3-6%
ASTM C- 143
ASTM C- 172
ASTM C-39
SAMPLE LOCATION: 4, 0.5
CYLINDER MEASURED
MARKED SLUMP
DATE
Business Center II
e Rd. & Lakeshore Dr.
Texas
ed field test and cast
PROJECT DATA
CONCRETE CLASS: 3349
PLACEME~rrOATE: 03/25/1998 aATCHTIME: 10:10 am
TIME SAMPLED: 11:10 am BY: ',ddie Elrod
WEATHER CONDITIONS: Partly ~udy, cool
TEMPERATURE (F) - AIR 72 F ¢ONCRETE: 80 F
TRUCK NO: 549
AIR CONTENT (%): N/A
PLACEMENT LOCATION:
See page I
TICK!
UN
;TNO: 651168
IT WEIGHT (peO: N/A
SET NO. (inches) TESTED
5 I 5.00
5 2 5.00
5 3 5.00
5 4 5.00
04/01 / 1998
04/01 / 1998
04/22/1998
04/22/1998
REPORT OF TESTS
MAXIMUM
AGE LOAD
(days) (lbs. force)
7 129760
7 123260
Average
CUMULATIVE YARDS: 500
COMPRESSIVE
STRENGTH FRACTURE
(psi) TYPE
4590
4360
4480
28
28
A(
Technician: Eddie Elrod
Report Distribution:
(I) Lincoln Property Company
(I) Butler Construction
(I) O'Brien & Associates
(I) AECC, Inc.
01AK
Started: 3:00 am
(l) City of Coppell/BIdg. lnsp.
( l ) City of Coppell/Constr. lnsp.
Finished: 1:00 pm
This report is exclusively tbr the use of the client indicated above and shall not be reproduced except in full without the wr
Page 5 of 5
]ugene Harbour
Vice President
tten approval of HBC Engineering, Inc.
cONCRETE COMPR?'$SIVE STRENGTH TE 'F
Date of Service: 03/25/1998 Report No.: 9808111
Client No.: 52617000 Project No.: 43-2452
-97
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
04/03/I 998
Client:
Services:
SLUMP:
AIR:
TEST METHOD:
Lincoln Property Company
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Project: Coppell
Belt Lin
Coppell
Obtain samples of fresh concrete at the placement locations, perform requi~
compressive strength samples.**
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 29
SPECIFICATION REQUIREMENTS
STRENGTH: 3500 psi ~ 28 Days
5"
N/A
ASTM C-143
ASTM C- 172
ASTM C-39
I 1-E.6, l l-F, 1 I-F.4
SAMPLE LOCATION:
CYLINDER MEASURED
MARKED SLUMP
SET NO. (inches)
PROJECT DATA
CONCRETE CLASS: 9337
PLACEMENT DATE: 03/25/1998
TIME SAMPLED: 3:05 pm BY: F
WEATHER CONDITIONS: Clear, v{
TEMPERATURE (F) - AIR 76 F C
TRUCK NO: 879 TICK~
AIR CONTENT (%): N/A UN]
PLACEMENT LOCATION:
Piers, Building D
REPORT OF TESTS
MAXIMUM
DATE AGE LOAD
TESTED (days) (lbs. force)
1 1 6.00
1 2 6.00
04/01/1998 7 115010
04/01 / 1998 7 110540
Average
1 3 6.00
I 4 6.00
Technician time on report
Technician: Brian Otis
Report Distribution:
(1) Lincoln Property Company
(1) Butler Construction
(i) O'Brien & Associates
(1) AECC, Inc.
04/22/1998 28
04/22/1998 28
Business Center II
e Rd. & Lakeshore Dr.
Texas
'ed field test and cast
BATCHTIME: 1:53 pm
,rian Otis
9808117.
Al
Started: Finished: I-~
(1) City ofCoppell/Bldg. Insp.
(I) City ofCoppell/Constr. Insp. F
This report is exclusively tbr the use of the client indicated above and shall not be reproduced except in full without the writ
:ry windy
9NCRETE: 80 F
TNO: 651205
T WEIGHT (pcf): N/A
:CUMULATIVE YARDS: 10
2OMPRESSIVE
STRENGTH
{psi)
4070
3910
3990
,ugene Harbour
Vice President
FRACTURE
TYPE
en approval of HBC Engineering, Inc.
01AK Page I of I
CONCRETE COMPRr'SSIVE STRENGTH TE Y.
Date of Service:
Client No.:
Client:
Services:
03/04/1998 Report No.: 980646!
52617000 Project No.: 43-2452
Lincoln Property Company
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Project:
Coppell
Belt Lin
Coppell.
Obtain samples of fresh concrete at the placement locations, perform requi~
compressive strength samples.**
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 22
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi ~ 28 Days
5"
N/A
ASTM C- 143
ASTM C- 172
ASTM C-39
SAMPLE LOCATION:
11-E.5, i I-F, 10.5~F
CYLINDER
MARKED
SET NO.
MEASURED
SLUMP
(inches)
I 1 5.75
1 2 5.75
I 3 5.75
I 4 5.75
Technician time on report
DATE
TESTED
03/11/1998
03/11/1998
04/01 / 1998
04/01 / 1998
9806468.
PROJECT DATA
CONCRETE CLASS: 9349
PLACEM~Wr DAT~: 03/04/1998
TIME SAMPLED: 1 1:07 am BY: l~
WEATHER CONDITIONS: Cloudy,
TEMPERATURE (F) - Am 62 F C
TRUCK NO: 846 TICK~
AIR CONTENT (%): N/A UN]
PLACEMENT LOCATION:
Piers, Building B
REPORT OF TESTS
MAXIMUM
AGE LOAD
(days) (lbs. force)
7 114920
7 113530
Average
28 142090
28 137670
Average
Al
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
04/03/1998
.97
Business Center II
e Rd. & Lakeshore Dr.
Texas
ed field test and cast
BATCH TIME: 10:33 am
rian Otis
Mndy
9NCRETE: 70 F
rNO: 651626
T WEIGHT (pc0: N/A
~CUMULATIVEYARDS:10
UOMPRESSIVE
STRENGTH
(psi)
4060
4010
4O40
5020
4870
4950
FRACTURE
TYPE
Technician: Brian Otis
Report Distribution:
(I) Lincoln Property Company
{ I) Butler Construction
(I) O'Brien & Associates
(I) AECC, hie.
Started:
( I ) City of Coppell/BIdg. lnsp.
(I) City of Coppell/Constr. lnsp.
Finished:
'Fhis report is exclusively lbr thc use of thc client indicated above and shall not bc reproduced except in full without thc wr
;ugene Harbour
Vice President
~n approval of HBC Engineering, Inc.
01AK Page I of 1