Northlake 635(3)-LR 980406' CONCRETE COMPRf SIVE STRENGTH
Date of Service: 03/05/1998
Report No.: 980655!
Client No.: 52617000
Project No.: 43-2452
Client:
Lincoln Property Company
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Project: Coppell
Belt Lin
Coppell
Services: Obtain samples of flesh concrete at the placement locations, perform requi~
compressive strength samples.**
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 22
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi ~ 28 Days
4"
N/A
ASTM C-143
ASTM C- 172
ASTM C-39
PROJECT DATA
CONCRETE CLASS: 9349
PLACEMENT DATE: 03/05/1998
TIME SAMPLED: 6:20 am BY: J
WEATHER CONDITIONS: Cloudy,
TEMPERATURE (F) - Am 46 F (
TRUCK NO: 730 TICK]
AIR CONTENT (%): N/A u~
PLACEMENT LOCATION:
Slab-on-grade, Building C floor, lines 1-3, A
SAMPLE LOCATION: Line lC, 3 ft. north
CYLINDER MEASURED
MARKED SLUMP DATE
SET NO. (i riches) TESTED
I 1 5.00 03/12/1998 '
1 2 5.00 03/12/1998
1 3 5.00 04/02/1998
1 4 5.00 04/02/1998
Note: After the tag pour, uncompacted
REPORT OF TESTS
MAXIMUM
AGE LOAD
(days) (lbs. force)
7 88050
7 85970
Average
28 134660
28 127780
Average
soil was put down from line
A~
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the v
01AK Page I of 8
ENGINEERING, INC.
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
04/06/1998
.97
Business Center II
e Rd. & Lakeshore Dr.
Texas
ed field test and cast
BATCHTIME: 5:45 am
ack Farris
windy
ONCRETE: 60 F
:TNO: 651739
IT WEIGHT (pet): N/A
:CUMULATIVE YARDS: 260
COMPRESSIVE
STRENGTH
(psi)
3110
3040
3080
4760
4520
4640
'3, G-N.
FRACTURE
TYPE
itten approval of HBC Engineering, Inc.
CONCRETE COMPR SIVE STRENGTH
Date of Service: 03/05/1998 Report No.:
Client No.: 52617000 Project No.:
Client: Lincoln Property Company Project:
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
980655:
43-2452
Coppell
Belt Lin
Coppell,
Services: Obtain samples of fresh concrete at the placement locations, perform requi]
compressive strength samples.**
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 22
SPECW~CAT~ON REQUIREMENTS
STRENGTH: 4000 psi ~ 28 Days
4"
N/A
ASTM C-143
ASTM C- 172
ASTM C-39
PROJECT DATA
CONCRETE CLASS: 9349
PLACEMENT DATE: 03/05/1998
TIME SAMPLED: 7:00 am BY:
WEATHER CONDITIONS: Cloudy
TEMPERATURE (F} - AIR 50 F
TRUCK NO: 756 TICKI
AIR CONTENT (%): N/A UN
PLACEMENT LOCATION:
See page 1
SAMPLE LOCATION: Line 3E, 5 ft. south
CYLINDER
MARKED
SET NO.
REPORT OF TESTS
MEASURED MAXIMUM
SLUMP DATE AGE LOAD
(inch.) TESTED (days) (Ibs.~rce)
2 1 5.00 03/12/1998 7 94500
2 2 5.00 03/12/1998 7 92470
Average
2 3 5.00 04/02/1998 28 118780
2 4 5.00 04/02/1998 28 115810
Average
Note: See page 1
A(
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the wr
01AK Page 2 of 8
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
-97
Report Date
04/06/1998
Business Center II
e Rd. & Lakeshore Dr.
Texas
ed field test and cast
BATCH TIME: 6:00 am
ack Farris
windy
ONCRETE: 62 g
:TNO: 651744
IT WEIGHT (pcf}: N/A
iCUMULATIVEYARDS: 310
COMPRESSIVE
STRENGTH
(psi)
3340
3270
3310
4200
4100
4150
FRACTURE
TYPE
tten approval of HBC Engineering, Inc.
CONCRETE COMPR.r SIVE STRENGTH
Date of Service: 03/05/1998 Report No.:
Client No.: 52617000 Project No.:
Client: Lincoln Property Company Project:
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
980655
43-245;
Coppell
Belt Li~
Coppell
Services: Obtain samples of fresh concrete at the placement locations, perform requi
compressive strength samples.**
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 22
SPECIFICATION REQUIREMENTS
S'rREN(;TH: 4000 psi ~ 28 Days
4"
N/A
ASTM C- 143
ASTM C- 172
ASTM C-39
PROJECT DATA
CONCRETE CLASS: 9349
PLACEMEWr DATE: 03/05/1998
TIME SAMPLED: 8:46 am BY:
WEATHER CONDITIONS: Cloudy
TEMPERATURE (F) - AIR 59
TRUCK NO: 803 TICK]
AIR CONTENT (%): N/A
PLACEMENT LOCATION:
See page I
SAMPLE LOCATION: Line 1 G, 7 ft. N & 2 ft. W
CYLINDER
MARKED
SET NO.
REPORT OF TESTS
MEASURED MAXIMUM
SLUMP DATE AGE LOAD
(inches) TESTED (days) (lbs. force)
3 1 5.00 03/12/1998 7 93240
3 2 5.00 03/12/1998 7 91910
Average
3 3 5.00 04/02/1998 28 146440
3 4 5.00 04/02/1998 28 157460
Average
Note: See page 1
Al
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the ~
01AK Page 3 of 8
ENGINEERING, INC.
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
.97
Report Date
04/06/1998
Business Center II
te Rd. & Lakeshore Dr.
Texas
'ed field test and cast
BATCH TIME: 8:20 am
ack Farris
:ONCRETE: 70 F
STNO: 651768
IT WEIGHT (pc0: N/A
.~CUMULATIVE YARDS: 430
COMPRESSIVE
STRENGTH
(psi)
3300
3250
3280
5180
5570
5380
FRACTURE
TYPE
ittcn approval of HBC Engineering, Inc.
CONCRETE COMPR SIVE STRENGTH
Date of Service:
Client No.:
Client:
Services:
03/05/1998 Report No.: 9806551
52617000 Project No.: 43-2452
Lincoln Property Company
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Project:
Coppell
Belt Lit
Coppell
Obtain samples of fresh concrete at the placement locations, perform requi~
coin pressive strength samples.* *
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 22
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi ~ 28 Days
4"
N/A
ASTM C-143
ASTM C- 172
ASTM C-39
PROJECT DATA
CONCRETE CLASS: 9349
PLACEMENT DATE: 03/05/1998
TIME SAMPLED: 9:55 am BY:
WEATHER CONDITIONS: Cloudy
TEMPERATURE (F) - AIR 60 F
TRUCK NO: 860 TICKI
AIR CONTENT (%): N/A UN
PLACEMENT LOCATION:
Sec page 1
SAMPLE LOCATION: Line 3H, 2 ft. west
CYLINDER MEASURED
MARKED SLUMP DATE
SET NO. (inches) TESTED
4 I 4.00 03/12/1998
4 2 4.00 03/12/1998
4 3 4.00 04/02/1998
4 4 4.00 04/02/1998
Note: See page 1
REPORT OF TESTS
MAXIMUM
AGE LOAD
(days) (lbs. force)
7 127930
7 126990
Average
28 165350
28 159160
Average
A£
This report is exclusively for thc use of thc client indicated above and shall not be reproduced except in full without the wri
01AK Page 4 of 8
ENGINEERING, INC.
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
04/06/1998
-97
Business Center II
e Rd. & Lakeshore Dr.
Texas
ed field test and cast
BATCHTIME: 9:21 am
ack Farris
ONCRETE: 79 F
.TNO: 651789
~WEIGHT(pcO: N/A
CUMULATIVE YARDS:
COMPRESSIVE
STRENGTH
(psi)
4520
4490
4510
5850
5630
5740
550
FRACTURE
TYPE
ten approval of HBC Engineering, Inc.
CONCRETE COMPRr' SIVE STRENGTH
Date of Service: 03/05/1998 Report No.:
Client No.: 52617000 Project No.:
Client: Lincoln Property Company Project:
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
980655~
43-245~
Coppell
Belt Lit
Coppell
Services: Obtain samples of fresh concrete at the placement locations, perform requi
compressive strength samples.**
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 22
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi @ 28 Days
4"
N/A
ASTM C- 143
ASTM C- 172
ASTM C-39
SAMPLE LOCATION: Line 2I, 2 f~. west
PROJECT DATA
CONCRETE CLASS: 9349
PLACEMENT DATE: 03/05/1998
TIME SAMPLED: 10:58 am BY:
WEATHER CONDITIONS: Cloudy
TEMPERATURE (F) - AIR 61
TRUCK NO: 752 TICm
AIR CONTENT (%): N/A Up
PLACEMENT LOCATION:
See page 1
REPORT OF TESTS
CYLINDER MEASURED MAXIMUM
MARKED SLUMP DATE AGE LOAD
SET NO. (inches) TESTED (days) (lbs. force)
5 1 4.00 03/12/1998 7 117240
5 2 4.00 03/12/1998 7 119550
Average
5 3 4.00 04/02/1998 28 158130
5 4 4.00 04/02/1998 28 143870
Average
This report is exclusively tbr thc usc of the client indicated above and shall not be reproduced except in full without thc
01AK Page 5 of 8
ENGINEERING, INC.
8901 Carpenter Frwy., Suite #I00
Dallas, Texas 75247
Report Date
04/06/1998
-97
Business Center II
~e Rd. & Lakeshore Dr.
Texas
ed field test and cast
BATCH TIME: 10:30 am
ack Farris
iONCRETE: 72 F
;TNO: 651805
IT WEIGHT (pc0: N/A
;CUMULATIVE YARDS:
COMPRESSIVE
STRENGTH
(psi)
4150
4230
4190
5590
5090
5340
650
FRACTURE
TYPE
itten approval of HBC Engineering, Inc.
CONCRETE COMPRr'3SIVE STRENGTH
Date of Service:
Client No.:
Client:
03/05/1998
52617000
Lincoln Property Company
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Report No.: 9806551
Project No.: 43-245~
Project: Coppell
Belt Lin
Coppell
Services: Obtain samples of fresh concrete at the placement locations, perform requi~
compressive strength samples.**
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 22
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi ~ 28 Days
4"
N/A
ASTM C-143
ASTM C- 172
ASTM C-39
PROJECT DATA
CONCRETE CLASS: 9349
PLACEMENT DATE: 03/05/1998
TIME SAMPLED: 12:15 pm BY:
WEATHER CONDITIONS: Cloudy
TEMPERATURE (F) - AIR 60 V C
TRUCK NO: 849 TICKI
AIR CONTENT (%): N/A UN
PLACEMENT LOCATION:
See page I
SAMPLE LOCATION: Line 3K, 2 ft. south .
CYLINDER
MARKED
SET NO.
REPORT OF TESTS
MEASURED MAXIMUM
SLUMP DATE AGE LOAD
(inches) TESTED (days) (lbs. force)
6 1 4.00 03/12/1998 7 118710
6 2 4.00 · 03/12/1998 7 118000
Average
6 3 4.00 04/02/1998 28 156060
6 4 4.00 04/02/1998 28 146160
Average
Note: See page 1
A£
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the wri
01AK Page 6 of 8
ENGINEERING, L~.
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
-97
Report Date
04/06/1998
Business Center II
e Rd. & Lakeshore Dr.
Texas
:d field test and cast
BATCH TIME: 12:00 pm
ack Fan'is
windy
ONCRETE: 79 V
XNO: 651828
IT WEIGHT (pc0: N/A
CUMULATIVE YARDS:
COMPRESSIVE
STRENGTH
(psi)
4200
4170
4190
5520
5170
5350
760
FRACTURE
TYPE
.ten approval of HBC Engineering, Inc.
CONCRETE COMPR?'SSIVE STRENGTH
Date of Service: 03/05/1998 Report No.:
Client No.: 52617000 Project No.:
Client: Lincoln Property Company Project:
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
980655
43-245~
Coppell
Belt Lit
Coppell
Services: Obtain samples of fresh concrete at the placement locations, perform requi
compressive strength samples.**
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 22
SPECIE[CATION REQUIREMENTS
STRENGTH: 4000 psi ~ 28 Days
4"
N/A
ASTM C-143
ASTM C- 172
ASTM C-39
PROJECT DATA
CONCRETE CLASS: 9349
PLACEMENT DATE: 03/05/1998
TIME SAMPLED: 1: 15 pm BY: 3
WEATHER CONDITIONS: Cloudy
TEMPERATURE(F)- AIR 60 F (
TRUCK NO: 858 TICK]
AIR CONTENT (%): N/A u~
PLACEMENT LOCATION:
See page I
SAMPLE LOCATION: Line IL
CYLINDER MEASURED
MARKED SLUMP DATE
SET NO. (i AChes) TESTED
7 1 4.00 03/12/1998
7 2 4.00 03/12/1998
7 3 4.00 04/02/1998
7 4 4.00 04/02/1998
Note: See page 1
REPORT OF TESTS
MAXIMUM
AGE LOAD
(days) (lbs. force)
7 106230
7 108610
Average
28 121380
28 119120
Average
A(
This report is exclusively for the usc of the client indicated above and shall not bc reproduced except in full without thc w
01AK Page 7 of 8
ENGINEERING, INC.
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
04/06/1998
.97
Business Center II
e Rd. & Lakeshore Dr.
Texas
ed field test and cast
BATCHTIME: 12:35 pm
ack Farris
ONCRETE: 75 F
:T NO: 651844
IT WEIGHT (pcf): N/A
:CUMULATIVE YARDS: 850
COMPRESSIVE
STRENGTH
(psi)
3760
3840
3800
4290
4210
4250
FRACTURE
TYPE
tten approval of HBC Engineering, lAC,
cONCRETE COMP SIVE STRENGTH
Date of Service:
Client No.:
Client:
03/05/1998
52617000
L i ncoln Property Company
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Report No.: 9806552
Project No.: 43-2452
Project: Coppeli
Belt Lin
Copper
Services: Obtain samples of fresh concrete at the placement locations, perform requil
compressive strength samples.**
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 22
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi ~ 28 Days
4"
N/A
ASTM C- 143
ASTM C- 172
ASTM C-39
SAMPLE LOCATION:
Line 2P, I ft. south
PROJECT DATA
CONCRETE CLASS: 9349
PLACEMENT DATE: 03/05/1998
TIME SAMPLED: 2:55 pm BY: J:
WEATHER CONDITIONS: Cloudy
TEMPERATURE (F) - Am 60 F C
TRUCK NO: 802 TICK[
AIR CONTENT (%): N/A
PLACEMENT LOCATION:
See page I
CYLINDER
MARKED
SET NO.
MEASURED
SLUMP
(inches)
8 1 4.25
8 2 4.25
8 3 4.25
8 4 4.25
Note: See page 1
REPORT OF TESTS
DATE
TESTED
03/12/1998
03/12/1998
MAXIMUM
AGE LOAD
(days) (Ibs.~rce)
7 115760
7 116300
Average
28 167980
28 164250
Average
04/02/1998
04/02/1998
AC
Technician: Jack Farris
Report Distribution:
(1) Lincoln Property Company
( 1 ) Butler Construction
(1) O'Brien & Associates
(I) AECC, Inc.
Started: 5:30 am
(1) City of Coppell/BIdg. Insp.
(1) City of Coppell/Constr. Insp.
Finished: 4:30 pm H~
This report is exclusively Ibr the use of the client indicated above and shall not be reproduced except in full without the wi
ENGINF~RING, INC.
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
04/06/1998
-97
Business Center II
e Rd. & Lakeshore Dr.
Texas
ed field test and cast
BATCH TIME: 2:35 pm
~ck Farris
~NCRETE: 75
TNO: 651863
TWEIGHT(pc0: N/A
CUMULATIVE YARDS:
SOMPRESSIVE
STRENGTH
(mi)
4090
4110
4100
5940
5810
5880
920
FRACTURE
TYPE
E~ Inc.
~ne Harbour
Vice President
ten approval of HBC Engineering, Inc.
01AK Page 8 of 8
CONCRETE COMPRt SIVE STRENGTH TE. 7
Date of Service: 03/26/1998 Report No.:
Client No.: 52617000 Project No.:
Client: Lincoln Property Company Project:
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
980819
43-245:
Coppel
Belt Li~
Coppel
Services: Obtain samples of fresh concrete at the placement locations, perform requi
compressive strength samples.**
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 27
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi ~ 28 Days
3-5"
N/A
ASTM C-143
ASTM C- 172
ASTM C-39
PROJECT DATA
CONCRETE CLASS: 9349
PLACEMENT DATE: 03/26/1995
TIME SAMPLED: 4:30 am BY:~
WEATHER CONDITIONS: Partly C
TEMPERATURE (F) - Am 66 ~* ~
TRUCK NO: 652 TICK
AIR CONTENT (%): N/A un
PLACEMENT LOCATION:
Building B slab-on-g/n~dc between lines A. 1-
SAMPLE LOCATION: C.2/1.5
REPORT OF TESTS
CYLINDER MEASURED MAXIMUM
MARKED SLUMP DATE AGE LOAD
SET NO. (inches) TESTED (days) (1~. force)
1 1 5.00 04/02/1998 7 97470
I 2 5.00 04/02/1998 7 92730
Average
1 3 5.00 04/23/1998 28
! 4 5.00 04/23/1998 28
This report is exclusively for thc usc of the client indicated above and shall not be reproduced except in full without the ~
fIAK Page 1 of 6
8901 Carpenter Frwy., SUite #100
Dallas, Texas 75247
-97
Report Date
04/06/1998
Business Center II
te Rd. & Lakeshore Dr.
Texas
ed field test and cast
BATCH TIME: N/A
2harlie Shurtleff
[oudy
2ONCRETE: 73 F
CTNO: 664711
liT WEIGHT (pc0: N/A
2.5 & 1.1-10.9
2CUMULATIVE YARDS: 40
COMPRESSIVE
STRENGTH
(psi)
3450
3280
3370
FRACTURE
TYPE
ittcn approval of HBC Engineering, Inc.
· CONCRETE COMPR?BSIVE STRENGTH TE?
Date of Service:
Client No.:
Client:
03/26/1998
52617000
Lincoln Property Company
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Report No.: 9808191
Project No.: 43-2452
Project: Coppell
Belt Lin
Coppell
Services: Obtain samples of fresh concrete at the placement locations, perform requii
compressive strength samples.**
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 27
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi ~ 28 Days
3-5"
N/A
ASTM C-143
ASTM C- 172
ASTM C-39
SAMPLE LOCATION: B.5/2.8
PROJECT DATA
CONCRETE CLASS: 9349
PLACEMENT DATE: 03/26/1998
TIME SAMPLED: 5:30 am BY:
WEATHER CONDITIONS: Cloudy
TEMPERATURE (1~ - AIR 66 F C
TRUCKNO: 546 TICm
AIR CONTENT (%): N/A un
PLACEMENT LOCATION:
See page I
CYLINDER
MARKED
SET NO.
REPORT OF TESTS
MEASURED MAXIMUM
SLUMP DATE AGE LOAD
(inches) TESTED (days) (lbs. force)
2 1 6.00* 04/02/1998 7 80740
2 2 6.00' 04/02/1998 7 92440
Average
2 3 6.00* 04/23/1998 28
2 4 6.00' 04/23/1998 28
A(
* Note: No water added at jobsite. Contractor and subcontractor no
This report is exclusively tbr the use of the client indicated above and shall not be reproduced except in full without the wfi
01AK Page 2 of 6
ENGINEERING, INC.
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
.97
Report Date
04/06/1998
Business Center II
e Rd. & Lakeshore Dr.
Texas
'ed field test and cast
BATCH TIME: 4:20 am
:harlie Shurtleff
ONCRETE: 74 F
664718
~WEIGHT(pc0:N/A
'CUMULATIVEYARDS: Il0
COMPRESSIVE
STRENGTH FRACTURE
(psi) TYPE
2860
3270
3070
~ified.
tten approval of HBC Engineering, Inc.
CONCRETE COMPRESSIVE STRENGTH
Date of Service: 03/26/1998 Report No.:
Client No.: 52617000 Project No.:
Client: Lincoln Property Company Project:
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
980819~
43-245~
Coppell
Belt Li~
Coppell
Services: Obtain samples of fresh concrete at the placement locations, perform requi]
compressive strength samples.**
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 27
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi ~ 28 Days
3-5"
N/A
ASTM C-143
ASTM C- 172
ASTM C-39
SAMPLE LOCATION: A.5/4.2
PROJECT DATA
CONCRETE CLASS: 9349
PLACEMENT DATE: 03/26/1991
TIME SAMPLED: 6:45 am BY:
WEATHER CONDITIONS: Cloudy
TEMPERATURE (F) - AIR 67 F c
TRUCK NO: 407 TICKI
AIR CONTENT (%): N/A uN
PLACEMENT LOCATION:
See page I
REPORT OF TESTS
CYLINDER MEASURED MAXIMUM
MARKED SLUMP DATE AGE LOAD
SET NO. (inches) TESTED (days) Obs. force)
3 I 7.00* 04/02/1998 7 81230
3 2 7.00* 04/02/1998 7 85380
Average
3 3 7.00* 04/23/1998 28
3 4 7.00' 04/23/1998 28
A(
Note: See page 2
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the wri
01AK Page 3 of 6
ENGINF__ERING, INC.
8901 Carpenter Frwy., Suite gl00
Dallas, Texas 75247
-97
Report Date
04/06/1998
Business Center II
e Rd. & Lakeshore Dr.
Texas
ed field test and cast
BATCH TIME: N/A
:harlie Shurtleff
ONCRETE: 74
',T NO: 664727
IT WEIGHT (pc0: N/A
:CUMULATIVE YARDS: 200
COMPRESSIVE
STRENGTH FRACTURE
(psi) TYPE
2870
3020
2950
~ '
ttcn approval of HBC Engineering, Inc.
CONCRETE COMPI %SIVE STRENGTH
Date of Service:
Client No.:
Client:
Services:
03/26/1998 Report No.: 980819,
52617000 Project No.: 43-245~
Lincoln Property Company
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Project:
Coppell
Belt Lit
Coppell
Obtain samples of fresh concrete at the placement locations, perform requi
compressive strength samples.**
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 27
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi ~ 28 Days
3-5"
N/A
ASTM C-143
ASTM C- 172
ASTM C-39
PROJECT DATA
CONCRETE CLASS: 9349
PLACEMENT DATE: 03/26/1998
TIME SAMPLED: 7:45 am BY:
WEATHER CONDITIONS: Cloudy
TEMPERATURE (F) - Am 69
TRUCK NO: 1803 TICK~
AIR CONTENT (%): N/A us
PLACEMENT LOCATION:
See page I
SAMPLE LOCATION: C/5.6
REPORT OF TESTS
CYLINDER MEASURED MAXIMUM
MARKED SLUMP DATE AGE LOAD
SET NO. (inches) TESTED (days) (lbs. force)
4 1 6.00* 04/02/1998 7 109230
4 2 6.00' 04/02/1998 7 100360
Average
4 3 6.00* 04/23/1998 28
4 4 6.00* 04/23/1998 28
A(
* Note: See page 2
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the w
01AK Page 4 of 6
ENGINEERING, INC.
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
04/06/1998
.97
Business Center II
e Rd. & Lakeshore Dr.
Texas
ed field test and cast
BATCHTIME: 7:10 am
~harlie Shurtleff
ONCRETE: 76 F
:T NO: 664741
Fl' WEIGHT (pc0: N/A
!CUMULATIVE YARDS: 31 0
COMPRESSIVE
STRENGTH
(psi)
3860
3550
3710
FRACTURE
TYPE
approval of HBC Engineering, Inc.
'CONCRETE COMP1Lr'3SIVE STRENGTH TEf" .
Date of Service: 03/26/1998 Report No.:
Client No.: 52617000 Project No.:
Client: Lincoln Property Company Project:
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
980819(
43-2452
Coppell
Belt Lin
Coppell,
Services: Obtain samples of fresh concrete at the placement locations, perform requil
compressive strength samples.**
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 27
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi ~ 28 Days
3-5"
N/A
ASTM C-143
ASTM C- 172
ASTM C-39
PROJECT DATA
CONCRETE CLASS: 9349
PLACEMENT DATE: 03/26/1998
TIME SAMPLED: 9:55 am BY: (~
WEATHER CONDITIONS: Cloudy,
TEMPERATURE (F) - AIR 76 F C
TRUCK NO: 545 TICI~
AIR CONTENT (%): N/A UN:
PLACEMENT LOCATION:
Sec page I
SAMPLE LOCATION: 6/B
CYLINDER
MARKED
SET NO.
REPORT OF TESTS
MEASURED MAXIMUM
SLUMP DATE AGE LOAD
(inches) TESTED (days) (lbs. force)
5 I 7.25 * 04/02/1998 7 112510
5 2 7.25' 04/02/1998 7 106580
Average
5 3 7.25* 04/23/1998 28
5 4 7.25' 04/23/1998 28
AC
* Note: No water added.
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the wri
01AK Page 5 of 6
ENGINEERING, INC.
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
04/06/1998
¸97
Business Center II
.~ Rd. & Lakeshore Dr.
Texas
ed field test and cast
BATCH TIME: 9:15 am
'.harlie Shurtleff
very windy
9NCRETE: 69 V
TNO: 658761
T WEIGHT (pc0: N/A
CUMULATIVE YARDS: 420
COMPRESSIVE
STRENGTH
(psi)
3980
3770
3880
FRACTURE
TYPE
Xen approval of HBC Engineering, Inc.
CONCRETE COMPRr' SIVE STRENGTH TE?
Date of Service: 03/26/1998
Client No.: 52617000
Client: Lincoln Property Company
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Report No.: 980819~
Project No.: 43-2452
Project: Coppell
Belt Lin
Coppell
Services: Obtain samples of fresh concrete at the placement locations, perform requi~
compressive strength samples.**
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 27
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi ~ 28 Days
N/A
ASTM C- 143
ASTM C- 172
ASTM C-39
SAMPLE LOCATION: 9.5/A.5
PROJECT DATA
CONCRETE CLASS: 9349
PLACEMENT DATE: 03/26/1998
TIME SAMPLED: 12:35 pm aY:
WEATHER CONDITIONS: Cloudy
TEMPERATURE (F) - AIR 76
TRUCK NO: 648 TICK1
Am CONTENT (%): N/A UN
PLACEMENT LOCATION:
See page I
CYLINDER MEASURED
MARKED SLUMP DATE
SET NO. (inches) TESTED
6 1 7.00* 04/02/1998
6 2 7.00* 04/02/1998
REPORT OF TESTS
MAXIMUM
AGE LOAD
(days) (lbs. force)
7 111100
7 109120
Average
6 3 7.00* 04/23/1998 28
6 4 7.00' 04/23/1998 28
A(
* Note: No water added.
Additional technician: Brian Otis 9:00 am to 2:30 pm
.97
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
04/06/1998
Business Center II
e Rd. & Lakeshore Dr.
Texas
'ed field test and cast
FRACTURE
TYPE
Technician: Charlie Shurtleff Started: 3:00 am Finished: 9:00 am
1 a.~ ~ ~nglneerlli~lnc.
Report Distribution:
(I) Liqcoln Property Company (1) City ofCoppell/Bldg. Insp ......
(I) Butler Construction (1) City ofCoppell/Constr. Insp. 1 ~ge~rHarbour
(I) O'Brien & Associates IVice President
(I) AECC, Inc. 1
1
This report is exclusively for the use of the client indicated above and shall not b~ reproduced except in full without the wri~n approval of HBC Engineering,
0IAK Page 6 of 6 /
CUMULATIVE YARDS:
COMPRESSIVE
STRENGTH
(psi)
3930
3860
3900
BATCHTIME: 11:30 am
:harlie Shurtleff
very windy
ONCRETE: 71 F
XNO: 658787
IT WEIGHT (pcf): N/A
590
[nC.
CONCRETE COMPRr SIVE STRENGTH
Date of Service: 03/24/1998 Report No.:
Client No.: 52617000 Project No.:
Client: Lincoln Property Company Project:
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
980803:
43-245~
Coppell
Belt Lit
Coppeli
Services: Obtain smnples of fresh concrete at the placement locations, perform requi
compressive strength samples.**
SLUMP: .
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 27
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi ~ 28 Days
5"
N/A
ASTM C- 143
ASTM C-143
ASTM C-39
SAMPLE LOCATION:
4 line between B and C
PROJECT DATA
CONCRETE CLASS: 9349
PLACEMENT DATE: 03/24/1998
TIME SAMPLED: 8:30 am BY: ]
WEATHER CONDmONS: Clear ar
TEMPERATURE {F}- Am 69 F (
TRUCK NO: 823 TICK~
AIR CONTENT (%): N/A ur
PLACEMENT LOCATION:
Slab on grade, building B
CYLINDER MEASURED
MARKED SLUMP DATE
SET NO. (inches) TESTED
1 1 7.00 03/31/1998
I 2 7.00 03/31/1998
1 3 7.00 04/21/1998
1 4 7.00 04/21/1998
REPORT OF TESTS
MAXIMUM
AGE LOAD
(days) (lbs. force)
7 97170
7 91030
Average
28
28
NOTE: Concrete placed by pump truck.
Technician did not monitor this pour.
used. Technician made cylinders only.
All samples taken from point
Contractor' controlled water
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the
0iMP Page I of 3
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
-97
Report Date
04/06/1998
Business Center II
e Rd. & Lakeshore Dr.
Texas
ed field test and cast
BATCH TIME: 7:30 am
lrian Otis
d mild
iONCRETE: 71 g
;TNO: 664568
IT WEIGHT (pc0: N/A
A~ ;CUMULATIVE YARDS: 280
COMPRESSIVE
STRENGTH
(psi)
3440
3220
3330
FRACTURE
TYPE
of deposit.
nd slump
itten approval of HBC Engineering, Inc.
CONCRETE COMPRr' SIVE STRENGTH TEff
Date of Service:
Client No.:
Client:
03/24/1998
52617000
Lincoln Property Company
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Report No.: 980803:
Project No.: 43-2452
Project: Coppell
Belt Lit
Coppell
Services: Obtain samples of fresh concrete at the placement locations, perform requi:
compressive strength samples.**
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 27
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi ~ 28 Days
5"
N/A
.ASTM C- 143
ASTM C- 143
ASTM C-39
SAMPLE LOCATION:
7 line between A and B
PROJECT DATA
CONCRETE CLASS: 9349
PLnCEMENT DATV.: 03/24/1998
TIME SAMPLED: 10:19 am BY:
WEATHER CONDITIONS: Clear
TEMPERATURE (F) - AIR 71 F
TRUCK NO: 407 TICm
AIR CONTENT (%): N/A
PLACEMENT LOCATION:
See Page i
CYLINDER
MARKED
SET NO.
MEASURED
SLUMP
(inches)
REPORT OF TESTS
MAXIMUM
DATE AGE LOAD
TESTED (days) (lbs. force)
2 1 6.00 03/31/1998 7 105040
2 2 6.00 03/31/1998 7 99790
Average
2 3 6.00 04/21/1998 28
2 4 6.00 04/21 / 1998 28
A(
See Note page 1.
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the w
0IMP Page 2 of 3
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
-97
Report Date
04/06/1998
Business Center II
e Rd. & Lakeshore Dr.
Texas
ed field test and cast
BATCHTIME: 9:34 am
Irian Otis
d warm
ONCRETE: 70 F
:TNO: 664591
rr wv.m~rr (pcO: N/A
:CUMULATIVE YARDS: 430
COMPRESSIVE
STRENGTH
(psi)
3710
3530
3620
FRACTURE
TYPE
tten approval of HBC Engineering, Inc.
· cONCRETE COMPR SIVE STRENGTH TE .
Date of Service: 03/24/1998 Report No.:
Client No.: 52617000 Project No.:
Client: Lincoln Property Company Project:
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
980803~
43-2452
Coppell
Belt Lin
Coppell
Services: Obtain samples of fresh concrete at the placement locations, perform requi~
compressive strength samples.**
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 27
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi ~ 28 Days
5"
N/A
ASTM C- 143
ASTM C- 143
ASTM C-39
SAMPLE LOCATION:
9 line between B and C
PROJECT DATA
CONCRETE CLASS: 9349
PLACEMENT DATE: 03/24/1998
TIME SAMPLED: 12:30 pm BY:
WEATHER CONDITIONS: Clear a~
TEMPERATURE (F) - AIR 84 F 12
TRUCK NO: 526 TICKI
AIR CONTENT (%): N/A UN
PLACEMENT LOCATION:
See Page I
CYLINDER
MARKED
SET NO.
REPORT OF TESTS
MEASURED MAXIMUM
SLUMP DATE AGE LOAD
(inche~) TESTED (days) (Ib~. force)
3 1 7.50 03/31/1998 7 106870
3 2 7.50 03/31/1998 7 105730
Average
3 3 7.50 04/21/1998 28
3 4 7.50 04/21/1998 28
A(
See Note on Page 1. See Report 9808018 for technician time.
Technician: Brian Otis
Report Distribution:
(1) Lincoln Property Company
(I) Butler Construction
(I) O'Bricn & Associates
(l) AECC, Inc.
Started: N/A
(1) City ofCoppell/Bldg, lnsp.
(1) City of Copp¢ll/Constr. Insp.
Finished: N/A
.97
ENGINEERING, INC.
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
04/06/1998
Business Center II
e Rd. & Lakeshore Dr.
Texas
'ed field test and cast
BATCH TIME: 11:07 am
lrian Otis
d warm
ONCRETE: 73 F
;TNO: 664611
IT WEIGHT (pc0: N/A
:CUMULATIVE YARDS: 560
COMPRE~IVE
STRENGTH
(psi)
3780
3740
3760
FRACTURE
TYPE
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the wr
0IMP Page 3 of 3
Vic~ President
ttcn approval of HBC Engineering, Inc.
CONCRETE COMPRt'"gSIVE STRENGTH
Date of Service:
Client No.:
Client:
03/06/1998
52617000
Lincoln Property Company
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Report No.: 980663~.
Project No.: 43-2452
Project: Coppell
Belt Lin
Coppell
Services: Obtain samples of fresh concrete at the placement locations, perform reqm~
compressive strength samples.**
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 22
SPECHqCATION REQUIREMENTS
STRENCTH: 4000 psi ~ 28 Days
4"
N/A
ASTM C-143
ASTM C- 172
ASTM C-39
PROJECT DATA
CONCRETE CLASS: 9349
PLACEMENT DATE: 03/06/1998
TIME SAMPLED: 4:45 am BY:
WEATHER CONDITIONS: Cold
TEMPERATURE (F} - AIR 37 F
TRUCKNO: 736 TICI~
AIR CONTENT (%): N/A t~
PLACEMENT LOCATION:
Slab-on-grade, Building C floor, lines 5-7, A-
SAMPLE LOCATION: Line 6A
CYLINDER
MARKED
SET NO.
REPORT OF TESTS
MEASURED MAXIMUM
SLUMP DATE AGE LOAD
(inches) TESTED (days) (lbs. force)
1 1 4.50 03/13/1998 7 101480
I 2 4.50 03/13/1998 7 103550
Average
I 3 4.50 04/03/1998 28 145420
1 4 4.50 04/03/1998 28 137390
Average
Note: Uncompacted soil was placed at lines 5 & 6, D-E.
AC
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the x~
01AK Page 1 of 6
.97
ENGINEERING, INC.
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
04/06/1998
Business Center II
e Rd. & Lakeshore Dr.
Texas
'ed field test and cast
BATCH TIME: 4:15 am
ack Farris
ONCRETE: 60 F
:X NO: 651906
IT WEIGHT (pc0: N/A
CUMULATIVE YARDS: 50
COMPRESSIVE
STRENGTH
(psi)
3590
3660
3630
5140
4860
5000
FRACTURE
TYPE
[ttcn approval of I-IBC Engineering, Inc.
CONCRETE COMPRr'SSIVE STRENGTH
Date of Service: 03/06/1998 Report No.:
Client No.: 52617000 Project No.:
Client: Lincoln Property Company Project:
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
980663'
43-245:
Coppell
Belt Li~
Coppell
Services: Obtain samples of fresh concrete at the placement locations, perform requi
compressive strength samples.**
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 22
SPECIFICATION REQUIREMENTS
STRENaTH: 4000 psi ~ 28 Days
4"
N/A
ASTM C-143
ASTM C- 172
ASTM C-39
SAMPLE LOCATION: Line 5B, 2 ft. N & 2 ft. E
CYLINDER
MARKED
SET NO.
.97
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
This report is exclusively tbr the use of the client indicated above and shall not be reproduced except in full without thc
01AK Page 2 of 6
2 1 4.50 03/13/1998 7 107590
2 2 4.50 03/13/1998 7 106690
Average
2 3 4.50 04/03/1998 28 150340
2 4 4.50 04/03/1998 28 140780
Average
rr WEIGHT (pc0: N/A
~CUMULATIVE YARDS:
COMPRESSIVE
STRENGTH
(psi)
3800
3770
3790
5320
4980
5150
REPORT OF TESTS
MEASURED MAXIMUM
SLUMP DATE AGE LOAD
(inches) TESTED (days) (lbs. force)
PROJECT DATA
CONCRETE CLASS: 9349
PLACEMENT DATE: 03/06/1998
TIME SAMPLED: 5:20 am BY: 3lack Farris
WEATHER CONDITIONS: Cold 1
TEMPERATURE (F) - AIR 37 ~* ~ONCRETE: 60
TRUCKNO: 512 TICm~TNO: 651916
AIR CONTENT (%): N/A
PLACEMENT LOCATION:
See page I
'ed field test and cast
BATCHTIME: 5:00 am
150
FRACTURE
TYPE
ittcn approval of HBC Engineering, Inc.
Business Center II
~e Rd. & Lakeshore Dr.
Texas
Report Date
04/06/1998
CONCRETE COMPR r SIVE STRENGTH
Date of Service: 03/06/1998 Report No.:
Client No.: 52617000 Project No.:
Client: Lincoln Property Company Project:
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
980663~
43-2455
Coppell
Belt Lit
Coppell
Services: Obtain smnples of fresh concrete at the placement locations, perform requi
compressive strength samples.**
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUeeLIER: Pioneer Concrete
PLANT: 22
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi ~ 28 Days
4"
N/A
ASTM C-143
ASTM C- 172
ASTM C-39
PROJECT DATA
CONCRETE CLASS: 9349
PLACEMEh"r DATE: 03/06/1998
TIME SAMPLED: 6:47 am BY:
WEATHER CONDITIONS: Cold, ~
TEMPERATURE (F) - AIR 42 F ~
TRUCK NO: 752 TICK
AIR CONTENT (%): N/A ur
PLACEMENT LOCATION:
Sec page I
SAMPLE LOCATION: Line 5D, 5 ft. N
REPORT OF TESTS
CYLINDER MEASURED MAXIMUM
MARKED SLUMP DATE AGE LOAD
SET NO. (inches) TESTED (days) (lbs. force)
3 1 4.00 03/13/1998 7 112430
3 2 4.00 03/13/1998 7 106970
Average
3 3 4.00 04/03/1998 28 152350
3 4 4.00 04/03/1998 28 141070
Average
At
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the ~a
01AK Page 3 of 6
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
¸97
Report Date
O4/06/1998
Business Center II
e Rd. & Lakeshore Dr.
Texas
ed field test and cast
BATCH TIME: 6:02 am
'ack Farris
indy
:ONCRETE: 62 F
;TNO: 651926
ITWEIGHT (pcf): N/A
~CUMULATIVE YARDS: 250
COMPRESSIVE
STRENGTH
(psi)
3980
3780
3880
5390
4990
5190
FRACTURE
TYPE
itten approval of HBC Engineering, Inc.
CONCRETE COMPR 3SIVE STRENGTH
Date of Service: 03/06/1998 Report No.:
Client No.: 52617000 Project No.:
Client: Lincoln Property Company Project:
3300 Lincolu Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
980663'
43-245:
Coppell
Belt Li~
Coppell
Services: Obtain samples of fresh concrete at the placement locations, perform requi
compressive strength samples.**
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 22
SPECIFICATION REQUIREMENTS
STRENGTm 4000 psi ~ 28 Days
4"
N/A
ASTM C- 143
ASTM C- 172
ASTM C-39
PROJECT DATA
CONCRETE CLASS: 9349
Pt. nCEME~rr DATE: 03/06/1998
TIME SAMPLED: 7:55 am BY:
WEATHER CONDITIONS: Cold,
TEMPERATURE (F) - AIR 42 V
TRUCK NO: 1805 TICK~
AIR CONTENT (%): N/A u~
PLACEMENT LOCATION:
See page I
SAMPLE LOCATION: Line 7E
CYLINDER
MARKED
SET NO.
REPORT OF TESTS
MEASURED MAXIMUM
SLUMP DATE AGE LOAD
(inches) TESTED (days) (lbs. force)
4 1 5.00 03/13/1998 7 108680
4 2 5.00 03/13/1998 7 105220
Average
4 3 5.00 04/03/1998 28 157300
4 4 5.00 04/03/1998 28 146440
Average
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the
01AK Page 4 of 6
ENGINF_.F.~dNG, INC.
8901 Carpenter Frwy. Suite #100
Dallas, Texas 75247
,97
Report Date
O4/O6/1998
Business Center II
te Rd. & Lakeshore Dr.
Texas
'ed field test and cast
BATCH TIME: 7:20 am
ack Farris
[ndy
:ONCRETE: 62 F
:.T NO: 651938
IT WEIGHT (pcf): N/A
~CUMULATIVE YARDS: 350
COMPRESSIVE
STRENGTH
(psi)
3840
3720
3780
5560
5180
5370
FRACTURE
TYPE
ilten approval of HBC Engineering, Inc.
CONCRETE COMPR SIVE STRENGTH TE. Y
Date of Service:
Client No.:
Client:
03/06/1998
52617000
Lincoln Property Company
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Report No.: 980663
Project No.: 43-245:
Project: Coppel]
Belt Li~
Coppell
Services: Obtain samples of fresh concrete at the placement locations, perform requi
compressive strength samples.**
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 22
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi ~ 28 Days
4"
N/A
ASTM C- 143
ASTM C- 172
ASTM C-39
SAMPLE LOCATION:
Line 5G
PROJECT DATA
CONCRETE CLASS: 9349
PLACEME~rr DATE: 03/06/1998
TIME SAMPLED: 9:15 am BY:
WEATHER CONDITIONS: Cloudy
TEMPERATURE (F) - AIR 42 F (
TRUCK NO: 551 TICK
AIR CONTENT (%): N/A ur
PLACEMENT LOCATION:
See page I
CYLINDER
MARKED
SET NO.
REPORT OF TESTS
MEASURED MAXIMUM
SLUMP DATE AGE LOAD
(inches) TESTED (days) (lbs. force)
5 I 4.25 03/13/1998 7 114470
5 2 4.25 03/13/1998 7 117940
Average
5 3 4.25 04/03/1998 28 146720
5 4 4.25 04/03/1998 28 135980
Average
Al
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the ~
01AK Page 5 of 6
ENGINEERING, [NC.
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
04/O 6/1998
.97
Business Center II
te Rd. & Lakeshore Dr.
Texas
~d field test and cast
BATCH TIME: N/A
'ack Farris
cold
:ONCRETE: 60 F
~TNO: 651955
IT WEIGHT (pc0: N/A
.~CUMULATIVE YARDS:
COMPRESSIVE
STRENGTH
(psi)
4050
4170
4110
5190
4810
5000
450
FRACTURE
TYPE
itten approval of HBC Engineering, Inc.
CONCRETE COMPRr SIVE STRENGTH
Date of Service: 03/06/I 998 Report No.:
Client No.: 52617000 Project No.:
Client: Lincoln Property Company Project:
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Services:
Obtain samples of fresh concrete at the placement locations, perform requi
compressive strength samples.**
CONTRACTOR:
CONCRETE SUPPLIER:
PLANT:
SPECIFICATION REQUIREMENTS
STRENC;TH: 4000 psi ~ 28 Days
Butler Construction
Pioneer Concrete
22
PROJECT DATA
~97
CONCRETE CLASS: 9349
PLACEMENT DATE: 03/06/1998
TIME SAMPLED: 10:57 am BY: J
WEAriER CONDITIONS: Cloudy,
TEMPERATURE (F) - AIR
SLUMP:
AIR:
TEST METHOD:
SAMPLE LOCATION:
N/A
ASTM C-143
ASTM C- 172
ASTM C-39
Line 4I, 3 ft. N
CYLINDER
MARKED
SET NO.
MEASURED
SLUMP
(inches)
6 1 4.00
6 2 4.00
6 3 4.00
6 4 4.OO
Technician: Jack Farris
Report Distribution:
(I) Lincoln Property Company
(l) Butler Construction
( I ) O'Brieu & Associates
(l) AECC, Inc.
TRUCK NO: 806
AIR CONTENT (%): N/A
PLACEMENT LOCATION:
See page !
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
REPORT OF TESTS
MAXIMUM
DATE AGE LOAD
TESTED (days) (lbs. force)
03/13/1998 7 100810
03/13/1998 7 102420
Average
04/03/1998 28 128910
04/03/1998 28 135130
Average
980663!
43-245;
Coppell Business Center II
Belt Lit e Rd. & Lakeshore Dr.
Coppell Texas
ed field test and cast
BATCH TIME: 10:10 am
ack Farris
cold
42 F CONCRETE: 65 F
TICK]
UN
Started: 3:00 am Finished: 12:30 I--~
(l) City ofCoppell/BIdg. Insp.
(I) City of Coppcll/Constr. Insp.
:TNO: 651977
IT WEIGHT (pcl): N/A
CUMULATIVE YARDS:
COMPRESSIVE
STRENGTH
(psi)
3560
3620
3590
4560
4780
4670
:~ugene Harbour
vice President
Report Date
04/06/1998
A(
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the w
540
FRACTURE
TYPE
Ien approval of HBC Engineering, Inc.
01AK Page 6 of 6
CONCRETE COMPRr'SSIVE STRENGTH TE,e'w
Date of Service: 03/05/1998 Report No.:
Client No.: 52617000 Project No.:
Client: Lincoln Property Company Project:
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
980657
43-245~
Coppell
Belt Lin
Coppel[
Services: Obtain samples of fresh concrete at the placement locations, perform requi~
compressive strength samples.**
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 22
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi ~ 28 Days
5"
N/A
ASTM C- 143
ASTM C- 172
ASTM C-39
PROJECT DATA
CONCRETE CLASS: 9349
PLACEMENT DATE: 03/05/1998
TIME SAMPLED: 11:17 am BY: [
WEATHER CONDITIONS: Cloudy,
TEMPERATURE (F) - AIR 68 F C
TRUCK NO: 858 TICK[
AIR CONTENT (%): N/A UN
PLACEMENT LOCATION:
Piers on Building C
SAMPLE LOCATION: 7-0.9, 7-0.5, 7-0, 7-N.6
REPORT OF TESTS
CYLINDER MEASURED MAXIMUM
MARKED SLUMP DATE AGE LOAD
SET NO. (inches) TESTED (days) (lbs. force)
1 1 6.25 03/12/1998 7 104810
1 2 6.25 03/12/1998 7 108100
Average
1 3 6.25 04/02/1998 28 123250
I 4 6.25 04/02/1998 28 119300
Average
Note: 3500 psi mix is required; 4000 psi mix used.
Technician time on report 9806577.
A£
Technician: Brian Otis
Report Distribution:
Started: Finished:
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
.97
Report Date
04/06/1998
Business Center II
~ Rd. & Lakeshore Dr.
Texas
ed field test and cast
BATCHTIME: 10:18 am
;rian Otis
windy
DNCRETE: 70 F
TNO: 651812
~T WEIGHT (pcO: N/A
CUMULATIVE YARDS:
COMPRESSIVE
STRENGTH
(psi)
3710
3820
3770
4360
4220
4290
10
FRACTURE
TYPE
., Eng~c.
(I) Lincoln Property Company (1) City of Coppell/Bldg. lnsp.
Iug arbour
I ) Butler Construction (1) City of Coppell/Constr. lnsp. ~
(
(i) O'Brien & Associates Vice President
(I) AECC, Inc.
This report is exclusively fur the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
01AK Page I of 1
Certificate of Calibration
The scales listed below (or on atlached listl have been check
weights sealed by Texas Department of Agriculture Metrolog¥ Labo
reference number A-000007841.
The Standards of Texas Department of Agriculture are
the National Institute of Standarsds and Technology through NIST
39569, 40093, 179355, 241548 and 251996.
Scales listed have been calibrated to ·/'/ of
on this date of fi-'7- a/c~ . Scales are the
And are located at i~'.~L-'~ c.I ~F_ ~ ~
with test
under
traceable to
numbers
%
of
SCALE SERIAL
SCALE SERIAL NO.
SCALE SERIAL NO.
SCALE SERIAL NO.
SCALE SERIAL NO.
SCALE SERIAL NO.
,nspectedby: ,~. ~ ~
Licenses No. ~7 ~ _~ .7 ~c~ i ~-~ ~' ~
GARY KINCAID SCALE CO.
118 INDUSIRIAL DR.
FORNEY, TX 75126
972-564-2685