Loading...
ST9604-CN 980623 June 23, 1998 City of Coppell P. O. Box 478 Driver Pipeline Co., Inc. Coppoll, Texas 75019 2o~ 9 Ruder Dallas, Texas 75212 (:~14) 638-7131 Attn: Mr, Ken Griffin (214)638-7136Fax Director Of Engineering & Public Works Mr. Griffin, Please accept the following revised estimate to expose Explorer's pipeline, inspect, and construct concrete cap as per Explorer Pipeline's specs between Pav. Sta, 9+23.33 and Pay. Sta. 8+78.94 on proposed street in the City of Coppell. The following revision in price is necessary due to the developer placing 10 ft. of fill on top of the existing 5 ft. of fill already covering Explorer's line and constructing new street up to Explorer Pipeline's right of way. This will require us to to break out, remove and haul off approximately 740 sq. ft. of concrete of the new street in order to maintain proper sloping of the ditch sides while working on the pipeline. This estimate does not include replacing the paving, backfilling, or repairing any damage to the pipeline or its coating. Revised Estimated Cost $ 33,000.00 Terms of Payment: Invoices are due and payable Net 30 days upon receipt of invoice, If this agreement meets with your approval, please sign and fax back to me, then follow with the original in the mail. Thank You, Driver Pipeline Co., Inc. ,.~~..C2ty of Coppell ---,_---- Signature: Scott Driver Name:3; Vice President Title: ~" Date: \PiDellne Construclion '~ TOTRL P. 02