Loading...
Northlake 635(3)-LR 980410REPORT OF CONCRr E INSPECTION Date of Service: 03/31/1998 Client No.: 52617000 Client: Lincoln Property Company 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 Services: Concrete inspection Report No.: 9808562 8901 Carpenter Frwy., S~te 9100 Dallas, Texas 75247 Project No.: 43-2452 Project: Coppell Belt Lira Coppell, On this date, an HBC Engineering technician arrived at the above ref, jobsite as scheduled for a 3:00 am concrete inspection. Upon arrival departure, no representatives of the contractor were available. Tec] .97 Report Date 04/10/1998 Business Center II ;Rd. & Lakeshore Dr. Texas ~renced and mician waited and finally departed jobsite at 6:30 am. Technician: Damon Elrod RepoFt Distribution: (1) I~noo~ Prope~.y C.,(m~y (1) Bufl~' (1) (YBfien & Associmea (1) AECC, (1) City of C.q~ll/Bldg. Imp. (D City ~ co~l/c,:,~r, rasp. Pal Eng., Inc. This repot is exclusively for the use of the client indicated above and shall n~t be reproduced e~cept in full without lhe written fl D. Smith, P.E. [or Project Engineer ~proval of I-IBC F~inoering In~ Page 1 of 1 CONCRETE COMPRe" SIVE STRENGTH Date of Service: Client No.: Client: Services: 03/I 1/1998 Report No.: 980699' 52617000 Project No.: 43-2452 Lincoln Property Company 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 Project: Coppell Belt Lin Coppell Obtain samples of fresh concrete at the placement locations, perform requil compressive strength samples.** SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer Concrete PLANT: 22 SPECIFICATION REQUIREMENTS STRENGTH: 3500 psi ~ 28 Days 5" N/A ASTM C- ! 43 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9337 PLACEMENT DATE: 03/1 1/1998 TIME SAMPLED: 1:48 pm BY: [ WEATHER CONDITIONS: Clear, cc TEMPERATURE (F) - AIR 50 F C TRUCK NO: 756 TlC~ AIR CONTENT (%): N/A UN: PLACEMENT LOCATION: Piers, Building D SAMPLE LOCATION: 9-C, 9-D, 9-E CYLINDER MEASURED MARKED SLUMP SET NO. (inches) I 1 6.00 I 2 6.00 i 3 6.OO 1 4 6.00 Technician time on report REPORT OF TESTS MAXIMUM DATE AGE LOAD TESTED (days) (lbs. force) 03/18/1998 7 92590 03/18/1998 7 95890 Average 04/08/1998 28 124460 04/08/1998 28 130980 Average 9806990. AC Technician: Brian Otis Report Distribution: ( I ) Lincoln Property Company ( I ) Butler Construction ( I ) O'Brien & Associates (I) AECC, Inc. Started: Finished: { I ) City ofCoppell/BIdg, lnsp. ( I ) City of Coppell/Constr. Insp. This report is exclusively tbr thc use of the client indicated above and shall not be reproduced except in full without the wt ENGINEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 04/10/1998 -97 Business Center II e Rd. & Lakeshore Dr. Texas ed field test and cast BATCHTIME: 12:45 pm ,rian Otis ,Id DNCRETE: 62 F TNO: 652126 t WEIGHT (pc0: N/A CUMULATIVE YARDS: 30 UOMPRESSIVE STRENGTH (psi) 3270 3390 3330 4400 4630 4520 FRACTURE TYPE ~Harbour Vice President ten approval of HBC Engineering, Inc. 01AK Page I of 1 CONCRETE COMPR C'"SSIVE STRENGTH Date of Service: 04/01/1998 Report No.: 9808661 Client No.: 52617000 Project No.: 43-245~ Client: Lincoln Property Company Project: Coppell 3300 Lincoln Plaza/Larry Moon Belt Li~ 500 North Akard Street Dallas TX 75201-3394 Coppell Services: Obtain samples of fresh concrete at the placement locations, perform requi~ compressive strength samples.** SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer Concrete PLANT: 22 SPECIFICATION REQUIREMENTS STRENGTH: 3500 psi ~ 28 Days 5" N/A ASTM C- 143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9337 PLACEMENT DATE: 04/01 / 1998 TIME SAMPLED: 12:00 pm BY: WEATHER CONDITIONS: Clear a TEMPERATURE (F) - AIR 70 F TRUCK NO: 846 TICKI AIR CONTENT (%): N/A uN PLACEMENT LOCATION: Piers on Building D SAMPLE LOCATION: 1.5-A, I-A, I-A.5 CYLINDER MEASURED MARKED SLUMP DATE SET NO. (inches) TESTED 1 I 6.25 04/08/1998 1 2 6.25 04/08/1998 1 3 6.25 04/29/1998 1 4 6.25 04/29/1998 REPORT OF TESTS MAXIMUM AGE LOAD (days) (lbs. force) 7 91220 7 89730 Average 28 28 A( See Report 9808664 for technician time Technician: Brian Otis Report Distribution: (1) Lincoln Property Company (1) Butler Construction (1) O'Brien & Associates (1) AECC, Inc. Started: N/A (I) City ofCoppell/BIdg. Insp. (I) City of Coppell/Constr. Insp. Finished: N/A -97 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 04/10/1998 Business Center II e Rd. & Lakeshore Dr. Texas ed field test and cast BATCH TIME: 10:52 am Irian Otis d mild ONCRETE: 82 F :T NO: 646009 IT WEIGHT (pcO: N/A :CUMULATIVE YARDS: 20 COMPRESSIVE STRENGTH (psi) 3230 3170 3200 nc. FRACTURE TYPE This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the wr Vice President tten approval of HBC Engineering, Inc. 01AK Page I of I