Northlake 635(3)-LR 98041304/13/98
18:44 FAX 214530707~-,,
21d6307070
HBC ENGINEERING
FAX TRANSMITTAL
DA TE:
TO:
PROJECT:
FROM:
Copp. nll Business Center It
Olivio fer Eq.. H.rbe.r
TIME:
FAX NO.
001/007
OFFICE:
ENG--, INC.
I.. B.lew
~ M-gmllff
8 7-S89-9618
.4821
-7610
-15'/0
Total Pages Including Cover:
Larry Moon
Brett
Tom AlbrJght
AECC,leo.
Lee Slope
Larq Davis
Li.coh Prel~ertygomp~.i_V
Bltler Colltrl~tietl
O'Brifl &
Gittof.Coppoll/Bldl, I,,p.
City.!f CopPelVl~oustr.
Roport Iio(!]:
9808190
214-740
972-788
972-96C
972-104
972-104
The information contained in this Pacsimile message'is iega#y privileged and confidential inform
for the use of the individual or entity named above. If the reader of this message is not the inte
the employee or agent responsible to deliver it to the intended recipient, you are hereby notifie~
nalion, distribution or copying of this communication is strictly prohibited, if you have received
tion in error, please immediately nofify us by telephone and return the original message to us a
ation intended only
nded recipient, or
r that any dissemF
'his communica-
I the address below
AUSTIN
3913 Todd Lauc
Suite #312
Austba, Texas 78744
Phone: (512) 442-1 t22
Fax: (512) 442-1181
HOUSTON
2313 W. Sa~ Houston Pkwy, bi.
Suite #107
Houston, Texas 77048
Phone: (713) 722-0700
Fax: (713) 722-0788
DALLAS
8901 Carpenter Freeway
Suite # 1 O0
Dallas, Texas 75247
Phone: (214) 630-1010
Fax; (214) 630-7070
via the US Postal aery/ce. Thank you,
ATLANTA
2470 Windy Hill Rd.
Suite #300
~Iarietta. Georgia 30067
Phone: (770) 618-3055
Fax: (770) 618-3015
04/13/98 18:45 FAX 2146307070
RBC ENGINEERING
CONCRETE COMPRESSIVE STRENGTH TEST
Date of Service: 03/26/1998
Client No.: 52617000
Client: Lincoln Property Company
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Report No.: 980819¢
Projeet No.: 43-2452
Project: Coppell
Belt Lin
Coppell,
Services: Obtain samples of fresh concrete at the placement locations, perform requi~
compressive strength smnples.**
STRENGTH:
SLUMP:
AIR;
TEST METHOD;
CONTanCTOR: Butler Construction
CONCRETE SUPPL ,IER: Pioneer Concrete
Pr~.NT: 27
SPECIFICATION REQUIR£MENTS
4000 psi ~ 28 Days
3-5"
N/A
ASTM C- 143
ASTM C-172
ASTM C-39
PROJECT DATA
CONC_~n~Tg CLASS: 9349
vt~CE~n£~rt DnXg: 03/26/1998
TIME SAMPLED; 4;30 am BY:
WFO, THgR CONOmons: P~Y
~Me~~-~ 66 ~ ~
~vc~o: 652 ~CK
~ co~ (%): N/A ~
p~~ LOCA~ON:
Building B slab~n-~d~ b~n Iln~ A, 1-
SAMPLE LOCATION: C.2/1.5
CYLIND£R
MARKED
SET NO.
REPORT OF TESTS
MEASURED MAXIMUM
SLUMP DATE AGE LOAD
(iachu) TEgTEO (dayt) Olin force)
5.00 04/02/1998 7 97470
5.00 04/02/1998 7 92730
Average
5.00 04723/1998 28
5.00 04/23/1998 28
This rcpon ~ cx¢lusivcly tbr thc usa of the clicnt indicated above and slla]l no~ be reproduced cxccpt in full wi~out the ~
01AK Page l of 6
002/007
ENGrN~, INC.
8901 Carpenlcr FrlsT., Suit~ #1fl0
Dallas, Texas 75247
Report Date
04/06/1998
.97
Business Center I1
~ Rd. & Lakeshore Dr.
Texas
'ed field test and cast
BATCH
:harlie Shurtleff
oudy
:ONCRET~: 73
· NO: 66471
T W~IGffr (pc0:
.5 & I.l-t0.9
A CCUMULATIVI5 YARI~: 40
CO~R~S~
~PR~GTH
(~0
3450
3280
3370
FRACTURE
TYPE
rrltten approval of l-IBC Engineering. Inc.
04/13/98 18:45 FAX 2146307070
HBC ENGINEERING
CONCRETE COMPRESSIVE STRENGTH TEST
Date of Service: 03/26/1998
Client No.: 52617000
Client: Lincoln Property Company
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Report No.: 9808190
Project No,: 43-2452.
Project: Coppell.
Belt Lira
Coppell,
Services: Obtain samples of fresh concrete at the placement locations, perform requir
compressive strength sampics.**
STR£NGTH;
$1,UMF:
AIR:
TEST METHOD:
CONTRACTOR; Butler Construction
CONCRETE SUPPLIER; Pioneer Concrete
PLANT: 27
SPECIFICATION REOUIREMENT$
4000 psi ~ 28 Days
3-5"
N/A
ASTM C- 143
ASTM C-172
ASTM C-39
PROJECT DATA
CONCRETE CLA~:
PLACEME~fl' DA"I~:
TIME SAMPLED: 5:30 am
W 15ATHI',R CONDITIONS:
TEMPERATUR~- (~ - AIR
TRUCK NO: 546
Am CONT~T (%): N/A
PLACEMENT LOCATION;
Sca pa~ I
9349
03/26/1998
BY: C
Cloudy
66 F c
TICK!
SAMPLE LOCATION:
REPORT OF TESTS
CY LIND ER MEASURED MAXIMUM
MARKED SLUMP DATE AGE LOAD
SKF NO. (inches) TKSTF~ (day,) Obs. force)
2 1 6.00' 04/02/I 998 7 80740
2 2 6.00* 04/02/1998 7 92440
Average
6.00* 04123/1998 28
6.00* 04/23/1998 28
A(
* Note: NO water added at job$ite. Contracto~ and subcont:actor n
This ,-epolx is exclusively for 'd~e use et'the rdient indicated above and sim[I not be rcpro~tuc, cd exempt in full without thc ~n
01AK Page 2, of 6
003/007
ENGINEERff~. INc.
8901 Carpenter Frwy~ Suite #100
Dallas, Texas 7S247
Report Date
04/06/1998
)7
~usiness Center II
Rd. & Lakeshore Dr.
texas
d field test and cast
BATCH TIME: 4:20 am
:harlie Shurtleff
DNCB_ETE: 74 g
a'nO: 664718
[T WEIGHT (pc0: N/A
:CUMU~T~q~
COMPRES$1VZ
STRENGTII
2860
3270
307~
,tified.
ritten approval afl.iBC .~gineerin&, Inc.
04/13/98 18:45 FAX 2146307070 HBC ENGINEERING
' CONCRETE COMPRESSIVE STRENGTH TEST
Date of Service: 03/26/1998
Client No.: 52617000
Client: Lincoln Property Company
3300 Lincoln Plaza/Lany Moon
500 North Akard Street
Dallas TX 75201-3394
Report No.: 9808190
Project No.: 43-2452-
Project: Coppell
Belt Lin,
Coppell,
Services: Obtain samples of fresh concrete at the placement locations, perform requir,
compressive strength smnples.**
SLUMP:
AIR:
TF.~T METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
pL~d~rf; 27
SPECIlqCAYION REQUIREMENTS
STRENGTH: 4000 psi ~ 28 Days
3-5"
N/A
ASTM C-143
ASTM Co172
ASTM C-39
PRO.I-ECT DATA
coNcRE'n~ cx~ss: 9349
PL~.~ OAT~: 03/26/1998
TIM£SAM~LIRD: 6:45 am aY: C
w~ CO~m~oNs: Cloudy
~u~so: 407 TIC~
~CEM~ LOCA~ON:
SAMPLE LOCKI'ION: A.5/4.2
REPORT OF TESTS
CY LIN 0 ER MEASURED MAXIMUM
MARleD SLUMP DATE AGE LOAD
SE.T NO. (incites) TF2TED (d.y~) (IM. feree)
3 I 7.00' 04/02/1998 7 81230
3 2 7.00* 04/02/I998 7 853 80
Average
3 3 ' 7.00* 04123/1998 28
3 4 7.00* 04/2311998 28
A(
* Note: See page 2
This tepo~ i$ exclusively ['or the usc of thc client indkated above and shall not bc reproduced except in full without thc ~
01AK Page 3 of 6
004/007
ENG]~1~dNG, INC.
8901 Carpenter I~rwy., Suite #100
Dallal, 'rczan 75247
Report Date
04/06/1998
~7
~usiness Center 11
: Rd. & Lakeshore DL'.
Texas
· ,d field test and cast
BATCH TIMId: N/A
harlie Shurtleff
:)NCKETE: 74
THO: 664727
T wEIGHT (poi):
,ctra~UtgTrW vamps: 200
COMPRE88IV~
STRENGTH
(~) TYPE
2870
3020
~950
'itlcn approval ofH~C EnE~r, gring, Inc.
04/13/98 18:46 FAX 2146307070 ItBC ENGINEERING
~ "~,
CONCRETE COMPRESSIVE STRENGTH TEST
Date of Service: 03/26/1998
Client No.: 52617000
Client: Lincoln Property Company
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Report No.: 9808190
Project No.: 43-2452
Project: Coppell
Belt Lin
Coppell,
Services: Obtain samples of fresh concrete at the placement locations, perform requi]
compressive strength samples.**
STRENGTH:
SLUMP:
AIR:
TIr,~l' METHOD:
COr~n~CTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
v~.*m': 27
SPEC~ff>,'rION REQUIREMENT5
4000 psi ~ 28 Days
3-5"
N/A
ASTM C-143
ASTM C- 172
ASTM C-39
PROJECT DATA
CONCRETE CLASS: 9349
PLACEMENT DATE: 03/26/1998
TIME SAMPLED: 7:4:5 am BY;
W~Tm[aco~moNS: Cloudy
TEMPERAT[,TRE (lr) - AIR 69
TRUCK NO: 1803 TICK
AiR co~rrE~ (%): N/A
PLACEMENT LOCATION:
Sec p~-~ I
SAMPLE LOCATION;
REPORT OF TESTS
CYLINDER MEASURED MAXIMUM
MARKED SLUMP DATE AGE LOAD
SET NO. (inche~) TESTED (days) (lbs. force)
4 1 6.00* 04/02/1998 7 109230
4 2 6.00* 04/02/1998 7 100360
Average
4 3 6.00* 04/23/1998 28
4 4 6.00* 04/23/1998 28
A
* Note: See page 2
This roper[ is cxclusivcly for thc use oldie cllent indlcaled abovc and shall not bo reproduced except in full wkhoot d~c
0IAK Page 4 of 6
005/007
CmTenter Frw~. 5idt~ #10O
Dallas, Texas 75247
Report Date
04/06/1998
.97
tusiness Center II
Kd. & Lakeshore Dr.
Texas
ed field Test and cast
BATCH TIME; 7:10 am
!harlie Shurtleff
DNCRETE: 76 F
~No: 664741
~TW~]CIIT(pt0:N/A
2CUMULATIVE YARDS: 310
COMPRESSIVE
STRENGTH
(psi)
38~0
3550
Y'/~O
~rittcn approved of HBC Engineering, Inc.
04/13/95 18:46 FAX 2146307070 RBC ENGINEERING
- CONCRETE COMPRESSIVE STRENGTIt TEST
Date of Service: 03/26/1998
Client No.: 52617000
Client: Lincoln Property Company
3300 Lincoln Plazn/Lar~ Moon
500 North Akard Street
Dallas TX 75201-3394
Report No.: 9808190
Project No.: 43-2452-
Project: Coppell
Belt Lin
Coppell,
Services: Obtain samples of fresh concrete at the placement locations, perform requir
compressive strength samples.**
SLUMP:
AIR;
'FEL~T METllOD:
co~cr~c-rog: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
eLANT: 27
SPECIFICA'rtON REQUIRKMKNTS
s'rR~.~CTm 4000 psi ~ 28 Days
3-5"
N/A
ASTM C-143
ASTM C-I72
ASTM C-39
PROJECT DATA
CONCRETE CLASS: 9349
PLACgMF, NT DATE: 03/26/1998
TmtZ smm, t. Eo: 9:55
w~ CO~OmON& Clo~y,
~C~ ~o: 54~ ~c~
~ CO~T (%): ~/A
SAMPLE LOCATION;
CYLINDER
MARKE;D
SET NO.
REPORT OF TESTS
MEASURF, D MAXIM~1M
SLUM~ DATE AGE LOAD
(inehe~) TEb'i'ED (days) (Ib~. force)
5 1 7.25* 04/02/1998 7 112510
5 2 7.25 * 04/02/1998 7 106580
Average
5 3 7.25* 04/2311998 28
5 4 7.25* 04/23/1998 28
A(
* Note: No water added.
Thi.~ report is exclusively for the usc of the clicm indir, ated above aad shall not be reproduced except in full without
01AK Page .~ of 6
~006/007
890l Carpenter Frwy. Suite #IO0
Dalln.,~ Texas '/5247
)7
Report Date
04/06/1998
3usiness Center II
~R~. & Lakeshore Dr.
~'exa~
field tes~ and cast
IIATCHTIMK: 9;15 am
:harlie Shurtleff
~,ery windy
:~NCRETIg: 69 F
Tam 658761
rr wExcwr (pcB; N/A
~CUMULATIVE YARDS: 420
COMPRESSIVE
STRIgNGTH
3980
3770
3880
ritten oproval of HBC Enginee¢ing, lac.
04/13/98 18:46 FAX 2146307070 HBC ENGINEERING
CONCRETE COMPRESSIVE STRENGTH TEST
Date of Service: 03/26/1998 ReportNo.: 9808190
Client No.: 52617000
Project No.: 43-2452
Client:
Lincoln Property Company
3300 Lincoln Plaza/Larry Moon
500 North Akard S~r~t
Dallas TX 75201-3394
Project: Coppell
Belt Lin,
Coppell,
Services: Obtain samples of fresh concrete at the placement locations, perform rcquiT
compressivc strength samples.**
SLUMP:
A[R:
TEST M15THOO:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrct~
rt~un't': 27
SPECt FICATION REQUIREMENTS
STgEI~GTI~: 4000 psi ~ 28 Days
N/A
' ASTM C- ] 43
ASTM C-172
AS~ C-39
PROJECT DATA
concRgr~ c~ss: 9349
PLACeMent DAX~: 03/26/1998
TIME SAMPLED: 12:35 pm ay:
w~'ra~a corn)meNs: Cloudy
"~MP~P,~T[.JRE ~-Am 76 F c
TRUCKNO: 645 ncaa
AZR co~r£~vr (%): N/A u~
PLACEMENT LOCATION;
See page I
SAMPLE LOCATION: 9.5/A.5
(:YLINDF..R MEASURED
MARKED SLUM~ DATE
SET NO. (inch.) ~TEb-TED
6 1 7.00* 04/02/1998
6 2 7.00* 04102/1998
REPORT OF TESTS
MAXIMUM
AGE LOAD
(dsy~) Obs. force)
7 111100
7 109120
Avcrnge
6 3 7.00* 04/23/1998 28
6 4 7.00* 04/23/1998 28
A(
* NoCe: No water added.
Additional technician: Brian Otis 9:00 am to 2:30 pm
Tedmiciaa: Charlie Shurtleff
Report Distributio.:
(I) Lincohl Property Company
(I) Butler Construction
(I) O'Bri¢fl &Associatcs
(I) AF. CC. Inc.
Started: 3:00 am
(I) City of CoppelltBtdg. Insp.
(l) City Of C0ppcll/Conslr. Insp.
Finished: 9:00 am H~
This mpon is exclusively I.br thc usc of thc clicm indicntad above and shall not bc reproduced except in full wilhout thc w,
007/007
F. NG~RINO,
8901 Carpenter Frwy., Suite #100
DalIM, Texas 7~47
Repo~ Date
04/06/1998
,97
Business Center Il
· ~ Rd. & Lakeshore Dr.
Texas
ad field test and cast
BATCHTIME: I 1:30 am
:harlie Shurtleff
very windy
INCRETE: 71 F
~o: 658787
I' wEIGN'r (per): N/A
COMPRF.~INrE
STRENGTH
(psi)
3930
3860
3900
FRA~URg
TYPE
Eugerg~PHarbour
Vice Prcsidcn!
'iRon approval ot'HBC Engineering inc.
Page 6 of 6
04/20/98 10:45 FAX 2146307070 IIBC ENGINEERING
CONCRETE COMPRESSIVE STRENGTH TEST
Date of Service: 04/02/1998
Report No.: 9808768
Client No.: 52617000
Client: Lincoln Property Company
3300 Lincoln Plaza/Lan~d Moon
500 North Akard Street
Dallas TX 75201-3394
Project No.: 43-2452
Project: Coppell
Belt Lin,
Coppel1,
Services: Obtain smnples of fresh concrete at rite placement locations, perform requiz
compressive strength samples.**
~RENGTH:
SLUMP:
AIR:
TESTMETHOD-'
comrP,~CrOm Butler Constxucfion
CONCR[TrE SUPPLIER' Pioneer Concrete
PLANT: :27
SPI~OFIC..ATION REUUIREMI~',N'£S
4000 psi ~ 28 Days
5"
N/A
ASTM C- i 43
ASTM C-172
ASTM C-39
PROJECT DATA
conc~"rg CLASS: 9349
PLACEM£nT DA~; 04/02/1998
TtME SAMPLED: 4:45 am
W KATHIF~ CONDITIONS: Partly
'rEMt,£RnTURE Ct~ -*~ 65 F
TRUCK NO: 652 ~ TlC~
~ co~ (%): N/A
p~~ LOCA~ON:
Bu~tdi~ D slab. J.M ~d 1-9
SAMPLE LOCATION: L.$- 1.5
REPORT OF TESTS
CYLINDER, M£ASURED MAXIMUM
MARKED SLUMP DATE AGE LOAD
SET -- - NO~' ' (inches) TESTED (days) (lei. force)
4.75 04/09/I 998 7 84 ! 80
4.75 04/09/1998 7 85120
Average
1 3 4.75 04/30/1998 28
I a 4.75 04/30/1998 28
This tcpO~r is cxchLnivcly tbr thc use of the ¢lien[ i~dicatcd above and shall not be reproduced except in full without thc ~
01AK Page I of 8
002/009
8901 Carpenter t~rwy., Suite
I)nlla~, 'texas 7RTA7
Report Date
04/13/1998
.97
~usiness Center II
Rd. & Lakeshore Dr.
rexas
ed fietd test and cast
BATCH TIM~;:
)amon Elrod
oudy
:or~cR~"r~: 72
,,'T ~O; 659085
tT w£iaar toa)=
~CUMLTLATfVK YARDS:
COMPRESSIVE
STRENGTH
2980
3010
3000
80
TYPE
,ritten approval of HBC Engineering, Inc.
04/20/98 10:45 FAX 2140307070 ~C ENGINEERING " ~
CONCRETE COMPRESSIVE STRENGTH TEST
Date of Service: 04/02/1998
Client No.: 52617000
Client: Lincoln Property Company
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Report No.: 9808768
Project No.: 43-2452
]Project: Coppell
Belt Lin
Gopp¢[l,
Services: Obtain samples of fresh concrete at the placement locations, perform requi:
compressive strength samples.**
PROJECT DATA
coNct~rE Ct~SS: 9349
I'LACF. d~IlI~ DATE: 04~02/1998
~ SAMPLED: 5:45 am aY:
COm'ancroa: Butler Construction
CONCRETE SUPPLIER: Pioneer Concret~
PLANT; 27
SPECIFICATION REQUIREMENTS WKATHER CONDITIONS: Partly
Sq'~l£NC'rm 4000 psi ~ 28 Days
SLUMP; 5" TRUCK NO: 582 TICK
AIR: N/A AIR CONTENT
'r~$'r MI'tHee: ASTM C- 143 PLAC£M ,ENT LOCATION;
ASTM C- ! 72
ASTM C-39
SAMPLE LOCATION '. J.5-2.5
CYLINDER
MARKED
SET
REPORT OF TESTS
MEASURED MAXIMUM
SLUMP DATE AGE LOAD
(inche..q) 'I'ES'fED (day~) (lin. force)
2 I 5.5 0 04/09/1998 7 75890
2 2 5.50 04/09/1998 7 77260
Average
2 3 5.50 04/30/1998 28
2 4 5.50 04/30/1998 28
Note: Technician was at one pump while concrete driver controlled
other pump.
Thi~ report is exclusively for the u~ oFthc client indicated above and shall not b~ r,~pmducM except in full without
01AK gage 2 of 8
003/009
8901 Cnrpenter Fr~nj~ Suite #I00
I)alla~, TexM TSiMT
Report Date
04/13/I998
-97
Business Center II
e Rd. & Lakeshore Dr.
Texas
'ed field test and cast
~iATCltTIME: 5:40 am
)amon Elrod
Ioudy
.~ONCRETE: 70 v
KTNO: 659105
WEIGHT (pcO: N/A
:CUMULATIVE YARI~:
COMI'RF~SIVE
STRENGTH
(psi)
2680
2730
2710
180
FRACTURE
TY~E
water from the
#ffiTCh approval of HBC Engineering, Inc.
04/20/98 10:46 FAX 2146307070 ItBC ENGIN~.ERING
CONCRETE COMPRESSIVE STRENGTH TEST
Date of Service: 04/02/1998 Report No.: 9808768
Client No.: 52617000 Project No.: 43-2452.
Client: ,L. incoln Property Company Project:
~300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Services: Obtain samples of fresh concrete at the placement locations, perform reqmr
compressive strength samples.**
STBF. aNGTH:
SLUMP:
AIR:
TEET ]~TI'[OD
CONTR~CTOt~ Butler Construction
CONCRZ'T~:SUPeLt~R: Pioneer Concrete
~'LANT: 27
SPECIFICATION RI;QUIREMENTS
4000 psi ~ 28 Days
N/A
ASTM C- 143
ASTM C- 172
ASTM C-39
PROJECT DATA
CONCREa~ Cz,~,~S: 9349
Pt,nCr, M~'r DAT~: 04/0~ 1998
TIME ~MeLED: 7:I0 am
WEA~ER CONO~IONS: P~ly
~g~ ~- Am 67
~u~o: 582
~ co~ (%)~ N/A
P~~ LOCA~ON;
S~ pa~ 1
~AMPLE LOCATION: L-3.5
CYLINDER
MARKED
SET NO.
REPORT OF TESTS
MEASURED MAXIM-tIM
SLUMP DATE AGE LOAD
(inch.) TE.~TED (days) (11~. farce)
3 I 5.00 04/09/1998 7 101560
3 2 5.00 04/09/1998 7 103330
Average
3 3 5,00 04/30/1998 28
3 4 5.00 04/30/1998 28
This rcpor[ 15 cxciLi$iv¢ly tbl* thc 0sc of[hc clicnz indicated ahavc ~nd shall not be rcproduced except in lbll wiLhou! [he
0IAK Page 3 of 8
~004/009
ENGINEERING, iNC.
8901 Carpenter Frwy., Suite #100
Dallar,, Texa.~ 75247
Repo~ Date
0~/I 3/1998
97
Coppell ~usin~s Center II
~elt Lin~ Rd. & ~ke~ore Dr.
Coppell, Tex~
~d field ~st ~d c~t
BATC~TIME: 6:3~ ~
~on Elrod
audy
F c ONCRS~: 70
T~C~;T ~O: 6~910S
~ ~ WEIGRT (pc~:
CUMULATIVE YARDS: 280
COMPRE$$1V£
STRENGTH FRACTURE
(psi)
3590
3650
3620
approval or HBC Enginccring, Ino.
04/~0/98 10:45 FAX Z1~$$07070 RBC ENGINEERING
CONCRETE COMPRESSIVE ST NGTH TEST
Date of Service: 04/02/1998 Report No.: 9808768
Client No.: 52617000
Project No.: 43-2452
Client: Lincoln Property Company Project:
3300 Lincoln plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Coppcll
Belt Lin
CoppelL
Services: Obtain samples of fresh concrete at the placement locations, perform requi]
compressive strength samples.**
STRENGTH.'
SLUMP:
AIR:
T~.~T METHOI):
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLanT; 27
se~'¢~ricA'nor~ REQUIREMENTS
4000 psi ~ 28 Days
5"
N/A
ASTM C- ~ 43
~STM C- 172
ASTM C-39
PROJECT DATA
CONCR~'E; CLASS: 9349
PLACEMT,~T DATE; 04/02/1998
TIME;SAMPLED: 8;05 ~ BY;
SAMPLE LOCATION: K.4.5
CYLINDER
MARK~
SET NO.
REPORT OF TESTS
MEAS~ED MAXIMUM
SLUMP DATE AGE LOAI)
(inchcO '£ ILS2~D (days) (lbs. force)
4 I 5.00 04/09/1998 7 85720
4 2 5.00 04/09/1998 7 84700
Average
4 J 5.00 04/30/1998 28
4 4 5,00 04/30/1998 28
A
This report hi exclusively for the usa of the client indicated above and sh~ll not be teproduCeCl except i~ full without the'
01AK Page 4 of 8
~ 005/009
8901 Carpenter FayS., Suite #10O
Dallal~ Texas
Report Date
04/13/1998
.97
Business Center Il
= Rd. & Lakeshor¢ 1~.
Texas
ed field test and east
BATCHTIME;~ N/A
)amen Ekod
oudy
0NCRI~I'E: 70 v
xso: 659116
~W~CHT(pc0:N/A
:CUMULATIVE; YAROS: 380
COMPRE88ZVI~
STRENGTH
(p~i)
3030
3000
3020
· itten app~ovaJ of I-IBC .F~gineeting. 111o.
04/20/95 10:46 FAX 2146307070 HBC ENGINEERING _ , ~,
CONCRETE COMPRESSIVE STRENGTH TEST
Date of Service: 04/02/1998 Report No.: 9808768
Client No.: 52617000
Project No.: 43-2452.
Client:
I, incoln Property Company
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Project: Coppell
Belt Lin,
Coppell,
Services: Obtain samples of fresh concrete at the Placement locations, perform requir
compressive strength samples.**
co~r~crog: Butler Construction
CONCRETF. SUPPLIER: Pioneer Concrete
Pt.ANT: 27
SPgClVlCATION ngOUlRrMENTS
STRENGTH: 4000 psi ~ 28 Days
SLUMP: 5"
nm: N/A
TEST ~nZT~On: ASTM C- 143
ASTM C- 172
ASTM C-39
PROJECT DATA
CONCRETE ct4~ss: 9349
PLACEMENT DATE: 04/02/1998
TIME ,~dVI~'LF..D: ! 0;05 a~ BY;
~vcgso: 808
Am CO~ (~): N/A
P~CE~ LOCATION:
Sec page !
SAMPLE LOCATION;
REPORT OF TESTS
CYLINDER MEASURED MAXIMUM
MARKED SLUMP DATE AGE LOAD
SET NO. (inchtn) 'rgST£D (daf) (lbs. force)
5.75 04/0911998 7 108650
5.75 04/09/1998 7 106180
Average
5 3 5.75 04/30/1998 28
5 4 5.75 04/30/1998 28
No'=e: Potter Concrete controlled water while technician was at
This rcpoa is ¢,-,:¢lusiv¢ly Ibr thc usc oflb¢ 0lien! indicated above and shall not b= repraduced except in full without thc v
01AK Page 5 ofl~
~006/009
ENGR~EERING, [NC.
8901 Carpenter Frwy., Suite #100
Dall~, Texas 7~247
Re~ Date
04/13/1998
97
~usiness Cent~ II
Kd. & ~keshore Dr.
Texas
~d field ~ ~d ~
BAT~ ~E: 9:57 ~
~on Elrod
uudy
g CONCh: 70 F
~;T ~0; 659126
UN ff WEIG~ (pcB: ~/A
A~ iCU~A~ YAR~: 480
COMP~S~
~fREN~ ~~
(~) ~
3840
3750
3800
Titmn approval off-IRC Engineering, lno.
04/20/98 10:47 FAX 2146307070 IIBC ENGINEERING
CONCRETE COMPRESSIVE STRENGTH TEST
Date of Service:
04/02/! 998
Report No.: 9808761
Client No.: 52617000
Project No.: 43-2452
Client: Lincoln Propcrty Compm~y Project:
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Coppell
Belt Lit
Coppell
Services: Obtain samples of fresh concrete at the placement locations, perform requi
compressive strength samples,**
SLtJMP:
AIR:
TT~T METHOD:
cowrsAcToa: Buder Construction
CONCRF;I'I~ SUPPLIER: Pioneer Concrete
rLA~rr: 27
SPECIFICATION REQUIREMENTS
$'rgENc-rx: 4000 psi ~ 28 Days
5"
N/A
ASTM C- 143
ASTM C- 172
ASTM C-39
PROJECT DATA
CONCRETE CLASS; 9349
ecAC£m~rt DATE: 04/02/1998
Te~S~Lr.~: 10:50 am ay.
SAIV~LE LOCATION: K.5-6.5
CYI,INOI~R
MARleD
SET NO.
REPORT OF TESTS
MEASURED MAXIMUM
SLUMP DATE AGE LOAD
(inchc~) TESTED {dayl) 0bi.
6 1 5.00 04/09/1998 7 102190
6 2 5.00 04/09/1998 7 106690
Average
6 3 5.00 04/30/1998 28
6 4 5,00 04130/I998 28
This rcpo~, is exclusively lbr the use office client indicated above and shall nor be reproduced except in full without the ·
0IAK Pap 6 of 8
007/009
ENOINEERIi~. INC.
8901 Carpenter Frwy., Suite #100
Dallas, Tez~ 75247
Report Date
04/13/1998
.97
Business Center II
e Rd. & Lakeshore Dr.
Texas
'ed field test and cast
BATCH 'rIME: 10:17 am
)amon Elrod
Ioudy
· ~ONCRETE: 80 F
~no: 659142
liT WEIGIIT (pc0; N/A
,,~mUL~xnre yAm)s: 580
COMPRF.~SIVE
STRF, NGTH
(~i)
3610
3-/70
3690
TYPE
fiRen appmvM ofHBC Engi~e~dng, Inc.
04/20/98 10:47 FAX 2146307070 I~C ENGI.NEERING
CONCRETE COMPRESSIVE STRENGTH TEST
Date of Service: 04/02/1998 ReportNo.: 9808768
Client No.: 52617000
Project No.: 43-2452-
Client: Lincoln Property Company Project:
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dalla~ TX 75201-3394
Services: Obtain samples of fresh concrete at the placement locations, perform requit
compressive strength samples.**
b~i'RENG'FH:
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER; Pioneer Concrete
PLANT: 27
SPECIFICATION REQUIR£MZNTS
4000 psi ~ 28 Days
N/A
ASTIv[ C- 143
ASTM C-172
ASTM C-39
PROJECT DATA
conc-~'r~ cta~,s: 9349
PLACEMENT DATE: 04/02/199 8
'FIM~MPL[D: 12:15 pm
W~ATH~R COND~IONS= P~ly
~o: 526
~ co~ (%~: ~/A
P~M~ LO~TION:
~ p~ I
SAMPLE LOCATION: J-7.5
REPORT OF TESTS
CYLINDER M EASt] RED MAXIMUM
MARKED SLUMP DATE ACE LOAD
$1~'i' - NO. (inch.) TF..~FED (day~) (Ib~ force)
7 I 5.25 04/09/1998 7 97620
7 2 5.25 04/09/199 $ 7 102390
Average
7 3 5.25 04/30/1998 28
7 4 5.25 04/30/1998 28
This rcpo~ i.~ cxclusivcly for z[~e use of thc clicn[ indic,~ed above and shall not be reproduced except in lull withouL the
01AK Pap 7 of 8
008/009
EN~, INC.
8901 Carpenter Ftnwj., Suite #100
Dallas, Te.~_a_~ 75247
Repo~ Da~
04/13/1998
97
Coppell ~ ~u~iness Center II
Belt Lin~ Rd. & ~k~hore Dr.
Coppell, Texas
~d field test and c~t
BATC~ TIME: N/A
~amon Elrod
~udy
g C ONC~; 80 F
~C~:T ~O: 659156
t~N ~ w[lG~ (pcO: ~/A
Al :CUMULATIVE YARDS: 680
COMPRF~SlVE
STRENGTK FRACTUI~
(psi) T~E
3450
3620
3540
ritten approval of HBC Engineering, Inc..
04/20/95 10:47 FAX 2146307070 HBC ENGIN~..ERING
CONCRETE COMPRESSIVE STRENGTH TEST
Date of Service: 04/02/I 998
Report No.: 9808768
Client No.: 52617000
Project No.: 43-2452.
Client:
Lincoln Property Company .
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Project: Coppell
Belt Lin
Coppeil,
Services: Obtain samples of fresh concrete at ~he placement locations, perform r~uir
compressive strength samples.**
~009/009
8901 Carpenter Frwy. Suite #100
Dallas, Texas 75Z47
Report Date
04/13/I998
97
3usiness Center I1
~ Rd. & Lakeshore Dr.
Texas
field test and cast
~fRENGTH:
SLUMP:
AIR:
TE~-F METHOD:
CONTRACTOR: Butler Construction
CONCRETI$ SUPPLIF...R: Pioneer Concrete
PLANT: 27
SPECIFICATION REQUIREMENTS
4000 psi (~ 28 Days
5"
N/A
ASTM C-143
ASTM C-172
ASTM C-39
SAMPLE LOCATION: L-8.5
CYL~DER
MARKED
S~t' NO.
MEASURED
SLUMP
(inchcs)
8 I $.00
8 2 5.00
8 3 5.00
8 4 5.00
PROJECT DATA
CONCreTE C~: 9349
PLACEMENT DATIr-: 04/0211998
· rIME SAMrL£D: 2:00 pm
wr~'r~R COnmT~OnS: Partly cl
TEMPERATURE (Fi
TRUCKNO: 658 TICIO
AiR CONTENT (%):
PLACEMENT LOCATION:
See psgo 1
REPORT OF TESTS
MAXIMUM
DATE AGE LOAD
TF,,b~TED (days) (lbs. force)
0410911998 7 96700
04/09/1998 7 98950
Average
04/30/1998 28
04/30/1998 28
Al
BATCI-ITIIg~: 12:55 pm
~amon Elrod
~udy
0NCRETE: 80 F
,T NO: 616:321
CF WEIGIIT (PC0: N/A
:CUMUI~A,TIYg YARDS: 780
COMPRESSIVE
STRENGTH
(psi)
3420
3500
3460
TYPE
T~hnlcla.: Damon EIr0d
Report Distribution:
(i) Lincoln Property Company
(I) Butlor Construction
(1) O'Bricn & As.socia:cs
(1) A~CC, ~nc,
01
Started: 3:00 am Finished: 6:00 pm .~
(I) Ci~, of Coppell/Btdl. Imp.
(I) City o£CoppelllConstr, inSp.
This rcporc is exclusively Iht thc usc of thc orient indicated above and shall not be reproduced except in full without thc
Page 8 ut'8
~-ugene Warlr6ur
Vice Prcsidant
rittan approval Of HBO Engineering. Inc.
REPORT OF DRILLE PIER INSPECTION
Date of Service:
Client No.:
Client:
03/26/1998
52617000
Lincoln Property Company
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Report No.: 9808227
Project No.: 43-2452.
Project: Coppell
Belt Lira
Coppell,
Services: Drilled pier inspection.
On this date, an HBC Engineering
jobsite as scheduled for drilled
layed out for drillers.
technician arrived at the above ref.
pier inspection. Once on the job,
Technician Time:
Technician: Brian Otis
Report Distribution:
(I) Lincoln Property Company
(I) Butler Construction
(I) O'Brien & Associates
(!) AECC, Inc.
6:00am to 9:00am
(1) City of Coppell/Bldg. lnsp.
(1) City of Coppell/Constr. Insp.
97
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
04/13/1998
3usiness Center II
: Rd. & Lakeshore Dr.
Texas
~renced
piers were
ng, Inc.
This report is exclusively tbr the use of the client indicated above and shall not be reproduced except in full without the wt
99MP Page 1 of I
Eugene Harbour
Vice President
ttten approval of HBC Engineering, Inc.
CONCRETE COMPResSIVE STRENGTH
Date of Service: 03/I 2/1998 Report No.:
Client No.: 52617000 Project No.:
Client: Lincoln Property Company Project:
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
9807108
43 -2452.
Coppell
Belt Lin,
Coppell,
Services: Obtain samples of fresh concrete at the placement locations, perform requir
compressive strength samples.**
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 22
SPECIFICATION REQUIREMENTS
STRENGTH: 3500 psi ~ 28 Days
4"
N/A
ASTM C- 143
ASTM C- 172
ASTM C-39
PROJECT DATA
CONCRETE CLASS: 933 7
PLACEMENT DATE: 03/12/1998
TIME SAMPLED: 1:48 pm BY: lq
WEATHER CONDITIONS: Cloudy,
TEMPERATURE (F) - AIR 56 F O
TRUCK NO: 556 TICKE
AIR CONTENT (%): N/A ONi
PLACEMENT LOCATION:
Piers, Building D
SAMPLE LOCATION: 6-K, 6-L, 4-B
CYLINDER
MARKED
SET NO.
MEASURED
SLUMP
(inches)
1 1 5.75
1 2 5.75
I 3 5.75
1 4 5.75
Technician time on report
REPORT OF TESTS
MAXIMUM
DATE AGE LOAD
TESTED (days) (lbs. force)
03/19/1998 7. 111150
03/19/1998 7 114860
Average
04/09/1998 28 138280
04/09/1998 28 134620
Average
9807107.
AC
Technician: Brian Otis
Report Distribution:
(1) Lincoln Property Company
(I) Butler Construction
(I) O'Brien & Associates
(I) AECC. Inc.
Started: Finished: I'~
(1) City of Coppell/BIdg. Insp.
( I ) CiW of Coppeli/Constr. lnsp.
This report is exclusively tbr the use of the client indicated above and shall not be reproduced except in full without the wr
01AK Page I of I
.97
ENGINF_.ERIN3, INC.
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
04/13/1998
Business Center II
: Rd. & Lakeshore Dr.
Texas
:d field test and cast
BATCH TIME: 1:27 pm
rian Otis
,dndy, cool
)NCRETE: 62 V
NO: 652231
'WEIGHT (pc0: N/A
UUMULATIVE YARDS:
2OMPRESSIVE
STRENGTH
(psi)
3930
4060
4000
4890
4760
4830
10
lnc.
Vice President
ten approval of HBC Engineering, Inc.
Date of Service: 04/01/1998
Client No.: 52617000
Report No.: 980866!
Project No.: 43-2452.97
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
04/13/1998
Client:
Services:
SLUMP:
AIR:
TEST METHOD:
Lincoln Property Company
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Project: Coppetl
Belt Lin
Coppell
Obtain samples of fresh concrete at the placement locations, perform requi~
compressive strength samples.**
Butler Construction
Pioneer Concrete
27
CONTRACTOR:
CONCRETE SUPPLIER:
PLANT:
SPECIFICATION REQUIREMENTS
STRENGTH: 3500 psi @ 28 Days
5"
3-6%
ASTM C- 143
ASTM C- 172
ASTM C-39
0iMP
SAMPLE LOCATION: Panel 82
PROJECT DATA
CONCRETE CLASS: 9337
PLACEMENT DATE: 04/01 / 1998
TIME SAMPLED: 4:35 am
WEATHER CONDITIONS: Clear,
TEMPERATURE (F) - AIR 53
TRUCK NO: 546
AIR CONTENT (%): N/A
PLACEMENT LOCATION:
Panels 80 - 92
REPORT OF TESTS
CYLINDER MEASURED MAXIMUM
MARKED SLUMP DATE AGE LOAD
SET NO. (inches) TESTED (days) (lbs. force)
Business Center II
e Rd. & Lakeshore Dr.
Texas
1 1 5.50 04/08/1998 7 104170
I 2 5.50 04/08/1998 7 106660
Average
1 3 5.50 04/29/1998 28
1 4 5.50 04/29/1998 28
ed field test and cast
BATCHTIME: 4:05 am
,ddie Elrod
,ol and starry
CUMULATIVE YARDS: 60
COMPRESSIVE
STRENGTH
(psi)
3680
3770
3730
FRACTURE
TYPE
:ten approval of HBC Engineering, Inc.
This rcport is exclusively/bt the use of the client indicated above and shall not be reproduced except in full without thc wri
Page 1 of 2
A£
F CONCRETE: 63 r.
TICmTNO: 659002
UN IT WEIGHT (pc0: N/A
-CONCRETE COMPR " SIVE STRENGTH TEL"
Date of Service: 04/01/1998
Client No.: 52617000
Client:
Lincoln Property Company
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Report No.: 980866:
Project No.: 43-245~
Project: Coppeil
Belt Lin
Coppell,
Services: Obtain samples of fresh concrete at the placement locations, perform requit
compressive strength samples.**
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 27
SPECIFICATION REQUIREMENTS
STRENGTH: 3500 psi ~ 28 Days
5"
3-6%
ASTM C- ! 43
ASTM C- 172
ASTM C-39
PROJECT DATA
CONCRETE CLASS: 9337
PLACEME~rr DATE: 04/01 / 1998
TIME SAMPLED: 5: 15 am BY: 1:
WEATHER CONDITIONS: Clear an~
TEMPERATURE (F) - AIR 53 F C
TRUCK NO: 1803 TIC~
AIR CONTENT (%): N/A UN~
PLACEMENT LOCATION:
Panels 80 - 92
SAMPLE LOCATION: Panel 88
CYLINDER MEASURED
MARKED SLUMP
SET NO. (inches)
2 I 5.00
2 2 5.00
2 3 5.00
2 4 5.00
REPORT OF TESTS
MAXIMUM
DATE AGE LOAD
TESTED (days) (lbs. force)
04/08/1998
04/08/1998
04/29/1998
04/29/1998
7 103820
7 100440
Average
28
28
AC
ENGINEERING, INC.
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
-97
Report Date
04/13/1998
Business Center II
~ Rd. & Lakeshore Dr.
Texas
ed field test and cast
BATCH TIME: 4:47 am
ddie Elrod
cool
NCRETE: 65 F
TNO: 659010
T WEIGHT (pcf): N/A
UUMULATIVE YARDS:
2OMPRESSIVE
STRENGTH
(psi)
.3670
3550
3610
140
FRACTURE
TYPE
Technician: Eddie Elrod
Report Distribution:
(I) Lincoln Property Company
(I) Butler Construction
(I) O'Brien & Associates
(1) AECC, Inc.
0IMP
Started: 3:00 am
(l) City of Coppell/BIdg. Insp.
(I) City of Coppell/Constr. insp.
Finished: 6:30 am
g, Inc.
This report is exclusively tbr the use of the client indicated above and shall not be reproduced except in full without the wr
Page 2 of 2
;ugene Harbour
Vice President
ten approval of HBC Engineering, Inc.
'CONCRETE COMPIL' SIVE STRENGTH TED
Date of Service: 03/12/1998 Report No.:
Client No.: 52617000 Project No.:
Client: Lincoln Property Company Project:
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
980709
43-245;
Coppell
Belt Lit
Coppell
Services: Obtain samples of fresh concrete at the placement locations, perform requi
compressive strength samples.**
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 22
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi ~ 28 Days
4"
N/A
ASTM C- 143
ASTM C- 172
ASTM C-39
PROJECT DATA
CONCRETE CLASS: 9349
PLACEMENT DATE: 03/12/1998
TIME SAMPLED: 10:30 am BY:
WEATHER CONDITIONS: Sunny,
TEMPERATURE (F) - AIR 40 F (
TRUCK NO: 841 TICK]
AIR CONTENT (%): N/A u~
PLACEMENT LOCATION:
Slab-on-grade, Building C floor, lines 5-7, Jd
SAMPLE LOCATION: 5J, 8'E
CYLINDER
MARKED
SET NO.
REPORT OF TESTS
MEASURED MAXIMUM
SLUMP DATE AGE LOAD
(inches) TESTED (days) (lbs. force)
I I 4.00 03/I 9/1998 7 139140
1 2 4.00 03/19/1998 7 137480
Average
I 3 4.00 04/09/1998 28 151930
I 4 4.00 04/09/1998 28 148790
Average
A(
This report is exclusively tbr the use of the client indicated above and shall not be reproduced except in full without the ~
01AK Page I of 5
ENGINEERING, INC.
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
04/13/1998
.97
Business Center II
e Rd. & Lakeshore Dr.
Texas
ed field test and cast
BATCH TIME: 10:05 am
ack Fan'is
:old
~ONCRETE: 57 F
;TNO: 652181
IT WEIGHT (pc/): N/A
2UMULATIVE YARDS: 40
COMPRESSIVE
STRENGTH
(psi)
4920
4860
4890
5370
5260
5320
FRACTURE
TYPE
itten approval of HBC Engineering, Inc.
'CONCRETE COMPR? ,SIVE STRENGTH
Date of Service:
Client No.:
Client:
03/I 2/1998
52617000
Lincoln Property Company
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Report No.: 980709,
Project No.: 43-2452
Project: Coppell
Belt Lin,
Coppell,
Services: Obtain samples of fresh concrete at the placement locations, perform requir
compressive strength samples.**
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 22
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi ~ 28 Days
4"
N/A
ASTM C- 143
ASTM C~ 172
ASTM C-39
PROJECT DATA
CONCRETE CLASS: 9349
PLACEMENT DATE: 03/12/1998
TIME SAMPLED: I 1:45 am BY: J~
WEATHER CONDITIONS: Sunny, c
TEMPERATURE (Fi - AIR 42 F C~
TRUCK NO: 736 TICKE
AIR CONTENT (%): N/A UNI
PLACEMENT LOCATION:
See page I
SAMPLE LOCATION: 6L, 3'E/2'S
CYLINDER
MARKED
SET NO.
REPORT OF TESTS
MEASURED MAXIMUM
SLUMP DATE AGE LOAD
(inches) TESTED (days) (lbs. force)
2 1 4.75 03/19/1998 7 115870
2 2 4.75 03/19/1998 7 115170
Average
2 3 4.75 04/09/1998 28 142190
2 4 4.75 04/09/1998 28 144570
Average
AC
This report is exclusively tbr the use of the client indicated above and shall not be reproduced except in full without the wril
01AK Page 2 of 5
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
04/13/1998
.97
Business Center II
: Rd. & Lakeshore Dr.
Texas
~d field test and cast
BATCH TIME: 11:15 am
tek Farris
~ld
)NCRETE:. 59 V
rNo: 652193
T WEIGHT (pcO: N/A
~UMULATIVE YARDS:
2OMPRESSIVE
STRENGTH
(psi)
4100
4070
4090
5030
5110
5070
140
FRACTU~
TYPE
ten approval of HBC Engineering, Inc.
'CONCRETE COMP1;Le' SIVE STRENGTH
Date of Service:
Client No.:
Client:
Services:
03/12/1998 Report No.: 980709z
52617000 Project No.: 43-2452
Lincoln Property Company
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Project:
Coppell
Belt Lin
Coppell,
Obtain samples of fresh concrete at the placement locations, perform requil
compressive strength samples.**
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 22
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi ~ 28 Days
4"
N/A
ASTM C- 143
ASTM C- 172
ASTM C-39
PROJECT DATA
CONCRETE CLASS: 9349
PLACEMENT DATE: 03/12/1998
TIME SAMPLED: 12:50 pm BY: J~
WEATHER CONDITIONS: Cold, SU~
TEMPERATURE (F) - AIR 41 F C
TRUCK NO: 373 TICK~
AIR CONTENT (%): N/A UN~
PLACEMENT LOCATION:
See page I
SAMPLE LOCATION: 7N, YW/2'S
REPORT OF TESTS
CYLINDER MEASURED MAXIMUM
MARKED SLUMP DATE AGE LOAD
SET NO. (inches) TESTED (days) (lbs. force)
3 I 4.25 03/19/1998 7 137450
3 2 4.25 03/19/1998 7 139750
Average
3 3 4.25 04/09/1998 28 174390
3 4 4.25 04/09/1998 28 170530
Average
AC
This report is exclusively tbr the use of the client indicated above and shall not be reproduced except in full without the wril
01AK Page 3 of 5
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
04/13/1998
97
Business Center II
: Rd. & Lakeshore Dr.
Texas
ed field test and cast
BATCH TIME: 12:19 pm
tek Farris
tny
3NCRETE: 57 F
YNO: 652211
T WEIGHT (pet): N/A
~UMULATIVE YARDS: 240
UOMPRESSIVE
STRENGTH
(psi)
4860
4940
4900
6170
6030
6100
ten approval of HBC Engineering, Inc.
CONCRETE COMPR_C"3SIVE STRENGTH
Date of Service:
Client No.:
Client:
Services:
03/12/1998 Report No.: 980709.
52617000 Project No.: 43-245;
Lincoln Property Company
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Project:
Coppell
Belt Lit
Coppell
Obtain samples of fresh concrete at the placement locations, perform requi:
compressive strength samples.**
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 22
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi ~ 28 Days
4"
N/A
ASTM C- 143
ASTM C- 172
ASTM C-39
PROJECT DATA
CONCRETE CLASS: 9349
PLACEMENT DATE: 03/12/1998
TIME SAMPLED: 2:25 pm BY:
WEATHER CONDITIONS: Cloudy
TEMPERATURE (F) - AIR 55 F C
TRUCK NO: 1805 TICK~
AIR CONTENT (%): N/A UN
PLACEMENT LOCATION:
See page I
SAMPLE LOCATION: 5P, YW/5'N
CYLINDER MEASURED
MARKED SLUMP DATE
SET NO. (inches) TESTED
4 1 5.00 03/19/1998
4 2 5.00 03/19/1998
4 3 5.00 04/09/1998
4 4 5.00 04/09/1998
REPORT OF TESTS
MAXIMUM
AGE LOAD
(days) (lbs. force)
7 131520
7 133800
Average
28 148890
28 151580
Average
AC
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the wri
01AK Page 4 of 5
ENGINEERING, INC.
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
,97
Report Date
04/13/1998
Business Center II
e Rd. & Lakeshore Dr.
Texas
ed field test and cast
BATCH TIME: 2:00 pm
ack Farris
cold
ONCRETE: 60 F
,T NO: 652235
IT WEIG~rr (pc0: N/A
CUMULATIVE YARDS: 330
UOMPRES~IVE
STRENGTH
(psi)
4650
4730
4690
5270
5360
5320
FRACTURE
TYPE
:eh approval of HBC Engineering, Inc.
CONCRETE COMPR ' SIVE STRENGTH
ENGINF_ERING, INC.
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Date of Service: 03/12/1998 Report No.: 980'
Client No.: 52617000 Project No.: 43-24
Client: Lincoln Property Company Project: Coppell
3300 Lincoln Plaza/Larry Moon
500 North Akard Street Belt Lit
Dallas TX 75201-3394 Coppell
Services:
.97
Report Date
04/13/1998
Obtain samples of fresh concrete at the placement locations, perform requi~
compressive strength samples.**
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 22
SPECIFICATION REQUIREMENTS
PROJECT DATA
CONCRETE CLASS: 9349
PLACEMENT DATE: 03/12/1998
TIME SAMPLED: 3:55 pm
WEATHER CONDITIONS: Cloudy~
Business Center II
e Rd. & Lakeshore Dr.
Texas
ed field test and cast
BATCH TIME: 3:20 pm
ack Farris
cold
STRENGTH:
SLUMP:
AIR:
TEST METHOD:
4000 psi ~ 28 Days
4"
N/A
ASTM C-143
ASTM C- 172
ASTM C-39
SAMPLE LOCATION: 6Q, 2'W
CYLINDER MEASURED
MARKED SLUMP
SET NO. (inches)
5 1 4.75
5 2 4.75
5 3 4.75
5 4 4.75
DATE
TESTED
03/19/1998
03/19/1998
04/09/1998
04/09/1998
TEMPERATURE (F)-AIR 52 F C
TRUCK NO: 730 TICK[
AIR CONTENT (%): N/A UN
PLACEMENT LOCATION: '"
See page I
REPORT OF TESTS
MAXIMUM
AGE LOAD
(days) (lbs. force)
7 137520
7 134880
Average
28 168380
28 162100
Average
Technician: Jack Farris
Report Distribution:
(l) Lincoln Property Company
(l) Butler Construction
( I ) O'Brien & Associates
(I) AECC, Inc.
AC
Started: 9:30 am Finished: 5:30 pm H~
( I ) City of Coppell/BIdg. lnsp.
(I) City ofCoppell/Constr. Insp.
This report is exclusively tbr the use of the client indicated above and shall not be reproduced except in full without the wri
DNCRETE: 60' F
TNO: 652258
:TWEIGHT(pc0: N/A
CUMULATIVE YARDS: 410
UOMPRESSIVE
STRENGTH
(psi)
4860
4770
4820
5950
5730
5840
.ugene Harbour
Vice President
FRACTURE
TYPE
en approval of HBC Engineering, Inc.
01AK Page 5 of 5
'CONCRETE COMPRL"' SIVE STRENGTH TEb"' ;
Date of Service:
Client No.:
Client:
04/02/1998
52617000
Lincoln Property Company
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Report No.: 9808761]
Project No.: 43-2452
Project: Coppell
Belt Lin.
Coppell,
Services: Obtain samples of fresh concrete at the placement locations, perform requir
compressive strength samples.**
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 27
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi ~ 28 Days
5"
N/A
ASTM C- 143
ASTM C- 172
ASTM C-39
PROJECT DATA
CONCRETE CLASS: 9349
PLACEMENT DATE: 04/02/1998
TIME SAMPLED: 4:45 am BY: l'
WEATHER CONDITIONS: Partly cl
TEMPERATURE (F) - AIR 65 F C
TRUCK NO: 652 TIC~
AIR CONTENT (%): N/A UN
PLACEMENT LOCATION:
Building D slab, J-M and 1-9
SAMPLE LOCATION: L.5-1.5
CYLINDER
MARKED
SET NO.
REPORT OF TESTS
MEASURED MAXIMUM
SLUMP DATE AGE LOAD
(inches) TESTED (days) (lbs. force)
I I 4.75 04/09/1998 7 84180
1 2 4.75 04/09/1998 7 85120
Average
1 3 4.75 04/30/1998 28
I 4 4.75 04/30/1998 28
A(
This report is exclusively tbr tile use of the client indicated above and shall not be reproduced except in full without the v
01AK Page I of 8
ENGINEERING, INC.
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
.97
Report Date
04/13/1998
Business Center II
~ Rd. & Lakeshore Dr.
Texas
ed field test and cast
BATCH TIME: N/A
lamon Elrod
>udy
ONCRETE: 72 F
T NO: 659085
IT WEIGHT (pc0: N/A
iCUMULATIVE YARDS:
2OMPRESSIVE
STRENGTH
(psi)
2980
3010
3000
80
FRACTURE
TYPE
itten approval of HBC Engineering, Inc.
CONCRETE COMPRi. $SIVE STRENGTH TEb £
Date of Service: 04/02/1998 Report No.:
Client No.: 52617000 Project No.:
Client: Lincoln Property Company Project:
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
980876~
43 -2452
Coppell
Belt Lin
Coppell,
Services: Obtain samples of fresh concrete at the placement locations, perform reqml
compressive strength samples.**
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 27
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi ~ 28 Days
5"
N/A
ASTM C- 143
ASTM C- 172
ASTM C-39
PROJECT DATA
CONCRETE CLASS: 9349
PLACEMENT DATE: 04/02/1998
TIME SAMPLED: 5:45 am BY:
WEATHER CONDITIONS: Partly
TEMPERATURE (F) - AIR 67
TRUCK NO: 582
AIR CONTENT (%): N/A
PLACEMENT LOCATION:
See page I
SAMPLE LOCATION: J.5-2.5
CYLINDER
MARKED
SET NO.
REPORT OF TESTS
MEASURED MAXIMUM
SLUMP DATE AGE LOAD
(inches) TESTED (days) (lbs. force)
2 1 5.50 04/09/1998 7 75890
2 2 5.50 04/09/1998 7 77260
Average
2 3 5.50 04/30/1998 28
2 4 5.50 04/30/1998 28
Note: Technician was at one pump while concrete driver controlled
other pump.
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the
01AK Page 2 of 8
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
04/13/1998
-97
Business Center II
e Rd. & Lakeshore Dr.
Texas
ed field test and east
BATCH TIME: 5:40 am
)amon Elrod
vudy
F · (20NCRETE: 70 F
TICm:TNO: 659105
UN IT WEIGHT (pc0: N/A
A( :CUMULATIVE YARDS: 180
COMPRESSIVE
STRENGTH
(psi)
2680
2730
2710
ater from the
FRACTURE
TYPE
wa itten approval of HBC Engineering, Inc.
CONCRETE COMPRt SIVE STRENGTH
Date of Service: 04/02/1998 Report No.:
Client No.: 52617000 Project No.:
Client: Lincoln Property Company Project:
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
9808768
43-2452.
Coppeli
Belt Lin~
Coppell,
Services: Obtain samples of fresh concrete at the placement locations, perform requir
compressive strength samples.**
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 27
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi ~ 28 Days
5"
N/A
ASTM C- 143
ASTM C- 172
ASTM C-39
PROJECT DATA
CONCRETE CLASS: 9349
PLACEMENT DATE: 04/02/1998
TIME SAMPLED: 7:10 am BY: I~
WEATHER CONDITIONS: Partly ch
TEMPERATURE (F) - AIR 67 F C,
TRUCK NO: 582 TICKE
AIR CONTENT (%): N/A UN]
PLACEMENT LOCATION:
See page 1
SAMPLE LOCATION: L-3.5
CYLINDER
MARKED
SET NO.
REPORT OF TESTS
MEASURED MAXIMUM
SLUMP DATE AGE LOAD
(inches) TESTED (days) (lbs. force)
3 I 5.00 04/09/1998 7 101560
3 2 5.00 04/09/1998 7 103330
Average
3 3 5.00 04/30/1998 28
3 4 5.00 04/30/1998 28
AC
This report is exclusively t~r the use of the client indicated above and shall not be reproduced except in full without the wri
01AK Page 3 of 8
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
.97
Report Date
04/13/1998
Business Center II
,' Rd. & Lakeshore Dr.
Texas
~d field test and east
BATCH TIME: 6:35 am
amon Elrod
)udy
)NCRETE: 70 F
rNO: 659105
T WEIGHT (pc0: N/A
CUMULATIVE YARDS: 280
~OMPRESSIVE
STRENGTH
(psi)
3590
3650
3620
FRACTURE
TYPE
~ten approval of HBC Engineering, inc.
CONCRETE COMPR r' SIVE STRENGTH
Date of Service: 04/02/1998 Report No.:
Client No.: 52617000 Project No.:
Client: Lincoln Property Company Project:
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
9808768
43 -2452.
Coppeli
Belt Lint
Coppell,
Services: Obtain samples of fresh concrete at the placement locations, perform requiv
compressive strength samples.**
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 27
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi ~ 28 Days
5"
N/A
ASTM C- ! 43
ASTM C- 172
ASTM C-39
PROJECT DATA
CONCRETE CLASS: 9349
PLACEMENT DATE: 04/02/1998
TIME SAMPLED: 8:05 am BY: I~
WEATHER CONDITIONS: Partly ch
TEMPERATURE (F) - AIR 69 F C,
TRUCK NO: 823 TICKE
AIR CONTENT (%): N/A
PLACEMENT LOCATION:
See page I
SAMPLE LOCATION: K-4.5
REPORT OF TESTS
CYLINDER MEASURED MAXIMUM
MARKED SLUMP DATE AGE LOAD
SET NO. (inches) TESTED (days) (lbs. force)
4 1 5.00 04/09/1998 7 85720
4 2 5.00 04/09/1998 7 84700
Average
4 3 5.00 04/30/1998 28
4 4 5.00 04/30/1998 28
AC
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the wril
01AK Page 4 of 8
ENGINEERING, INC.
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
97
Report Date
04/13/1998
3usiness Center II
: Rd. & Lakeshore Dr.
Texas
field test and cast
BATCH TIME: N/A
amon Elrod
~udy
)NCRETE: 70 F
NO: 659116
'WEIGHT (pc0: N/A
~UMULATIVE YARDS: 380
2OMPRESSIVE
STRENGTH
(psi)
3030
3000
3020
FRACTURE
TYPE
ten approval of HBC Engineering, Inc.
CONCRETE COMPI SIVE STRENGTH TED
Date of Service: 04/02/1998 Report No.:
Client No.: 52617000 Project No.:
Client: Lincoln Property Company Project:
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
980876~
43-2452
Coppell
Belt Lin
Coppell:
Services: Obtain samples of fresh concrete at the placement locations, perform requit
compressive strength samples.**
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 27
SPEClgICATION REQUIREMENTS
STRENGTH: 4000 psi ~ 28 Days
5"
N/A
ASTM C- 143
ASTM C- 172
ASTM C-39
PROJECT DATA
CONCRETE CLASS: 9349
PLACEMENT DATE: 04/02/1998
TIME SAMPLED: 10:05 am BY:
WEATHER CONDITIONS: Partly c
TEMPERATURE (F) - AIR 71 F C
TRUCK NO: 808 TICK[
AIR CONTENT (%): N/A UN
PLACEMENT LOCATION:
See page I
SAMPLE LOCATION: J-5.5
CYLINDER
MARKED
SET NO.
REPORT OF TESTS
MEASURED MAXIMUM
SLUMP DATE AGE LOAD
(inches) TESTED (days) (lbs. force)
5 1 5.75 04/09/1998 7 108650
5 2 5.75 04/09/1998 7 106180
Average
5 3 5.75 04/30/1998 28
5 4 5.75 04/30/1998 28
A£
Note: Potter Concrete controlled water while technician was at anot
This report is exclusively tbr thc use of the client indicated above and shall not be reproduced except in full without the wri
01AK Page 5 of 8
ENGINEERING, INC.
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
-97
Report Date
04/13/1998
Business Center II
~ Rd. & Lakeshore Dr.
Texas
ed field test and cast
BATCH TIME: 9:57 am
tamon Elrod
~udy
[~NCRETE: 70 F
TNO: 659126
WEIGHT (pcO: N/A
CUMULATIVE YARDS: 480
COMPRESSIVE
STRENGTH
(psi)
3840
3750
3800
her pump.
Ren approval of HBC Engineering, Inc.
CONCRETE COMPIL C'N SIVE STRENGTH
Date of Service:
Client No.:
Client:
04/02/1998
52617000
Lincoln Property Company
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Report No.: 9808761
Project No.: 43-245~
Project: Coppell
Belt
Coppell
Services: Obtain samples of fresh concrete at the placement locations, perform requi:
compressive strength samples.**
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 27
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi @ 28 Days
5"
N/A
ASTM C- 143
ASTM C-172
ASTM C-39
PROJECT DATA
CONCRETE CLASS: 9349
PLACEMENT DATE: 04/02/1998
TIME SAMPLED: 10:50 am BY:
WEATHER CONDITIONS: Partly (
TEMPERATURE (F) - AIR 75 F (
TRUCKNO: 848 TICK]
AIR CONTENT (%): N/A u~
PLACEMENT LOCATION:
Sec page I
SAMPLE LOCATION: K. 5-6.5
CYLINDER
MARKED
SET NO.
REPORT OF TESTS
MEASURED MAXIMUM
SLUMP DATE AGE LOAD
(inches) TESTED ~ (days) (lbs. force)
6 1 5.00 04/09/1998 7 102190
6 2 5.00 04/09/1998 7 106690
Average
6 3 5.00 04/30/1998 28
6 4 5.00 04/30/1998 28
This report is exclusively tbr the use of the client indicated above and shall not be reproduced except in full without the ~
01AK Page 6 of 8
ENGINEERING, INC.
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
-97
Report Date
04/13/1998
Business Center II
e Rd. & Lakeshore Dr.
Texas
ed field test and east
BATCH TIME: 10:17 am
)amon Elrod
oudy
!ONCRETE: 80 F
;TNO: 659142
IT WEIGHT (pcf): N/A
;CUMULATIVE YARDS:
COMPRESSIVE
STRENGTH
(psi)
3610
3770
3690
580
itten approval of HBC Engineering, Inc.
CONCRETE COMPR.r' SIVE STRENGTH
Date of Service: 04/02/1998 Report No.:
Client No.: 52617000 Project No.:
Client: Lincoln Property Company Project:
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
980876~
43-2452
Coppell
Belt Lin
Coppell,
Services: Obtain samples of fresh concrete at the placement locations, perform requil
compressive strength samples.**
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 27
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi (~ 28 Days
5"
N/A
ASTM C-143
ASTM C- 172
ASTM C-39
PROJECT DATA
CONCRETE CLASS: 9349
PLACEMENT DATE: 04/02/1998
TIME SAMPLED: 12:15 pm BY:
WEATHER CONDITIONS: Partly
TEMPERATURE (F)-AIR 78
TRUCK NO: 526
AIR CONTENT (%): N/A
PLACEMENT LOCATION:
See page I
SAMPLE LOCATION: J-7.5
CYLINDER
MARKED
SET NO.
REPORT OF TESTS
MEASURED MAXIMUM
SLUMP DATE AGE LOAD
(inches) TESTED (days) (lbs. force)
7 1 5.25 04/09/1998 7 97620
7 2 5.25 04/09/1998 7 102390
Average
7 3 5.25 04/30/1998 28
7 4 5.25 04/30/1998 28
This report is exclusively tbr the use of the Client indicated above and shall not be reproduced except in full without the wr
01AK Page 7 of 8
ENGINEERllq3, INC.
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
04/13/1998
-97
Business Center II
: Rd. & Lakeshore Dr.
Texas
ed field test and east
BATCH TIME: N/A
~amon Elrod
audy
F C DNCRETE: 80 F
TICK~ T NO: 659156
UN IT WEIGHT (pc/): N/A
A( CUMULATIVE YARDS: 680
COMPRESSIVE
STRENGTH
(psi)
3450
3620
3540
FRACTIJRE
TYPE
ttcn approval of HBC Engineering, Inc.
'CONCRETE
COMPR SIVE STRENGTH
Date of Service: 04/02/1998
Client No.:
Client:
Services:
52617000
Lincoln Property Company
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Report No.: 9808768
Project No.: 43-2452
Project: Coppell
Belt Lin.
Coppeil,
Obtain samples of fresh concrete at the placement locations, perform requir
compressive strength samples.**
PROJECT DATA
CONTRACTOR: Butler Construction CONCRETE CLASS: 9349
CONCRETE SUPPLIER: Pioneer Concrete PLACEMENT DATE: 04/02/1998
PLANT: 27 TIME SAMPLED: 2:00 pm BY: [
SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Partly el,
STRENGTH: 4000 psi ~ 28 Days TEMPERATURE (F)-AIR 80 F C
SLUMP: 5" TRUCKNO: 658 TICK[
AIR: N/A AIR CONTENT (%): N/A UNI
TEST METHOD: ASTM C- 143 PLACEMENT LOCATION:
ASTM C- 172 sec page 1
ASTM C-39
SAMPLE LOCATION: L-8.5
REPORT OF TESTS
CYLINDER MEASURED MAXIMUM
MARKED SLUMP DATE AGE LOAD
SET NO. (inches) TESTED (days) (lbs. force)
8 1 5.00 04/09/1998 7 96700
8 2 5.00 04/09/1998 7 98950
Average
8 3 5.00 04/30/1998 28
8 4 5.00 04/30/1998 28
AC
ENGINEERING, INC.
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
-97
Report Date
04/13/1998
Business Center II
.~ Rd. & Lakeshore Dr.
Texas
ed field test and cast
BATCHTIME: 12:55 pm
,amon Elrod
>udy
~)NCRETE: 80 F
TNO: 616321
T WEIGHT (pcf}: N/A
CUMULATIVE YARDS: 780
COMPRESSIVE
STRENGTH
(psi)
3420
3500
3460
ReportTechnician:Distribution:Dam°n Elrod Started: 3:00 am Finished: 6:00 pm H~ .~ ~ Enginee~[nc~.
(I) Lincoln Property Company (I) City ofCoppell/BIdg. Insp.
] :~ugene lq~r~'6u r
(1) Butler Construction (I) City ofCoppell/Constr. Insp.
(1) O'Brien & Associates ~ Vice President
(I) AECC. Inc.
/
This report is exclusively tbr the use of the client indicated above and shall not be reproduced except in full without the wrilten approval of HBC Engineering, Inc.
.
Page 8 of 8
01AK