Loading...
Northlake 635(3)-LR 980414CONCRETE COMPRESSIVE STRENGTH Date of Service: Client No.: Client: 03/13/1998 52617000 Lincoln Property Company 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 Report No.: 980721 Project No.: 43-245: Project: Coppell Belt Lin~ Coppell, Services: Obtain samples of fresh concrete at the placement locations, perform requir compressive strength samples.* * SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer Concrete PLANT: 22 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi ~ 28 Days 5" N/A ASTM C- 143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRE'TE CLASS: 9351 PLACEMENT DATE: · 03/13/1998 TIME SAMPLED: 3:15.pm BY: B WEATHER CONDITIONS: Cloudy, TEMPERATURE Or) - AIR 56 F O TRUCK NO: 769 TICKE AIR CONTENT (%): N/A UNI PLACEMENT LOCATION: Piers, Building D SAMPLE LOCATION: l-B, I-B.4, 1-B.6 CYLINDER MEASURED MARKED SLUMP DATE SET NO. 0ache0 TESTED 1 1 6.25 03/20/1998 1 2 6.25 03/20/1998 REPORT OF TESTS MAXIMUM AGE LOAD (days) Obs. force) 7 86990 7 89670 Average 28 114790 28 116870 Average 1 3 6.25 04/10/1998 1 4 6.25 04/10/1998 Note: Mix used' is for paving. Technician time on report 9807218. AC, Technician: Brian Otis Report Distribution: (!) Lincoln Property Company (!) Butler Construction (!) O'Brien & Associates (1) AECC, Inc. Started: Finished: I-~ (i) City of Coppell/Bldg. Insp. (1) City of Coppell/Constr. Insp. This report is exclusively for the use of the client indicated above and shall not be reproduced eXcept in full without the wr 01AK Page 1 of 1 ENG--, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 04/14/1998 -97 Business Center H ~' Rd. & Lakeshore Dr. Texas field test and cast BATCH'rIME: 2:20 pm dan Otis :ool )NCRETE: 69 r r NO: 652463 r WEIOffr (0¢0: N/A 2UMULATIVE YARDS: ~OMPRESSIVE STRENGTH 3080 3170 3130 4060 4130 4100 10 TYPE Vice President ~n approval of HBC Engineering, Inc. CONCRETE COMPR/ SIVE STRENGTH Date of Service: Client No.: Client: 03/24/1998 52617000 Lincoln Property Company 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 Report No.: 9808036 Project No.: 43-2452- Project: Coppell Belt Lin, Coppell, Services: Obtain samples &fresh concrete at the placement locations, perform requin compressive strength samples.** SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer Concrete PLANT: 27 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi ~ 28 Days 5" 3-6% ASTM C-143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9349 PLACEMENT DATE: 03/26/1998 TIME SAMPLED: 2:30 pm BY: B WEATHER CONDITIONS: Cloudy, TEMPERATURE (F) - Am 79 g C~ TRUCK NO: 486 TICKE' AIR CONTENT (%): 2.5 UNI PLACEMENT LOCATION: Paving, main approach between Buildings B & SAMPLE LOCATION: 5' in (south) from main road CYLINDER MARKED SET NO. REPORT OF TESTS MEASURED MAXIMUM SLUMP DATE AGE LOAD (inches) TESTED (days) (lbs. force) 1 I 6.00 1 2 6.00 1 3 6.00 1 4 6.00 Note: Mix 9351 content. AC4 04/02/1998 7 82630 04/02/1998 7 80850 Average 04/23/1998 28 126140 04/23/1998 28 127810 Average is specified; Mix 9349 was used. Subcontractor notiJ Technician: Brian Otis Report Distribution: (1) Lincoln Property Company (I) Butler Construction (1) O'Brien & Associates (1) AECC, Inc. Started: 3:00 pm Finished: 5:00 pm ~ (1) City of Coppcll/Bldg. lnsp. (1) City of Coppell/Constr. insp. (I) Mullen & Powell Technistructures This report is exclusively tbr the use of the client indicated above and shall not be reproduced except in full without the wr 01AK Page I of I 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 97 Report Date 04/29/1998 3usiness Center II ~ Rd. & Lakeshore Dr. Texas field test and cast BATCH TIME: 2:20 pm ~'ian Otis ,ery windy ~NCRETE: 81 F rNO: 658798 FWEIGHT (pc0: N/A D ~UMULATIVE YARDS: 20 .~OMPRESSIVE STRENGTH (psi) 2920 2860 2890 4460 4520 4490 ~ied of air FRACTURE TYPE lge~'~Harbour Vice President Ien approval of HBC Engineering, Inc. REPORT OF DRILLff"' BELLED PIER INSPE?FIOi Date of Service: Client No.: Client: Services: 04/01 / 1998 52617000 Lincoln Property Company 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 Drilled belled pier inspection. Report No.: 980866, Project No.: 43-245~ Project: Coppell Belt Lit Coppell On this date, an HBC Engineering technician arrived at the above ref jobsite as scheduled for drilled belled pier inspection. See attack recorded data Building D. Technician Time: Technician: Brian Otis Report Distribution: (1) Lincoln Property Company (I) Butler Construction (I) O'Brien & Associates (1) AECC, Inc. 6:00am to 6:00pm (1) City ofCoppell/Bldg. Insp. (I) City of Coppell/Constr. lnsp. This report is exclusively lbr the use of the client indicated above and shall not be reproduced except in full without the wri 99MP Page I of 1 ENGINEERING, lNC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 97 Report Date 04/14/1998 Business Center II e Rd. & Lakeshore Dr. Texas ~renced ed sheets for Se nior Project Engineer tten approval of HBC Engineering, Inc. REPORT OF DRILLED BELLED PIERS Project: Project No.: Coppell Business Center II-Building D Coppell, Texas 43-2452-97 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report No.: 9808664 Date of Service: 04/01/1998 Technician: B. Otis Page: 1 of 4 Pier Identification Pier Diameter (in.) Bell Diameter (in.) Top of Pier Elevation (ft) 1.5-A 24 66.0 96.0 1-A 66.0 96.0 1-A.5 24 66.0 93.5 B-1 54.0 93.5 Req. Depth From Exist. Grade (ft) 12.0 12.0 12.0 12.0 Initial Depth of Pier From Existing Grade (ft) 13.3 13.8 13.3 13.2 Final Depth of Pier From Existing Grade (ft) M-1.5 24 66.0 93.5 12.0 15.2 M-2 54.0 93.5 12.0 14.9 M-2.1 24 54.0 93.5 12.0 14.4 M-2.5 24 60.0 95.0 12.0 14,0 13.4 13.8 13.3 13.3 15.2 14.9 14.4 14,1 Depth From Top of Concrete (ft) 10.9 11.3 10.8 10.8 12.7 13.4 12.9 12.6 Condition of Bottom (wet or dry) DRY DRY DRY DRY DRY DRY DRY DRY Plumb Within Tolerance (yes or no) YES YES N/A N/A 6 N/A N/A Casing Diameter (in) Cased Depth (ft) 1-L.5 1-M 24 24 66.0 66.0 93.5 93.5 12.0 12.0 14.5 13.4 14.6 13.4 DRY DRY YES YES N/A N/A N/A N/A ~ 6 6 6 14.58 13.42 07:19 AM 07:28 AM 12:35 PM 01:10 PM YES N/A N/A 6 YES N/A 6 YES YES N/A N/A N/A YE,S N/A N/A N/A Number of Vertical Bars (ea.) YES N/A N/A [ 6 Reinforcing Bar Size (#) 6 6 6 6 6 6 6 6 Length of Vertical Bars (ft.) 13.42 13.83 13.25 13.25 15.17 14.92 14,42 12.08 06:47 AM 07:10 AM 12:26 PM 12:12 PM 07:55 AM 01:34 PM 06:55 AM 12:20 PM Time Drilling Was Completed 06:39 AM 07:45 AM 01:26 PM Time Concrete Was Placed 12:05 PM 07:36 AM 01:18 PM 08:10 AM 01:42 PM 60.0 95.0 12.0 13.0 13.0 11.5 DRY YES N/A N/A 6 6 11 08:19 AM 01:50 PM REPORT OF DRILLED BELLED PIERS Project: Project No.: Coppell Business Center II-Building D Coppell, Texas 43-2452-97 Report No.: Date of Service: Technician: Page: ENGINEERING, INC. 8901 Carpenter Fr~/., Suite # 100 Dallas, Texas 75247 9808664 04/01/1998 B. Otis 2 of 4 Pier Identification Pier Diameter (in.) Bell Diameter (in.) Top of Pier Elevation (ft) Req. Depth From Exist. Grade (ft) Initial Depth of Pier From Existing Grade (ft) M-4.5 M-5 M-5,5 I M-6 M-6.5 24_ 2~4_ ~4__ l 2_4_ _ . 2~4 60.0 60.0 60.0 60.0 60.0 95.0 12.0 95.0 M-3.5 M-4 24 24 60.O 60.0 95,O 95.O 12.0 12.0 12.8 13.2 12.8 13.2 11.3 11.7 DRY DRY YES YES N/A N/A N/A N/A 6 6 6 6 10.83 11.17 09:00 AM 09:08 AM 02:15 PM 02:21 PM 12.0 95.0 12,0 12.0 95.0 95.0 12,0 11.2 11.4 12.0 M-7.5 I M-8 24 t 24 6~.0-! 6~-.0- 95~.0_ .... 95.0 12.0 12.0 M-8.5 24 60.0 95.0 12.0 12.3 12.8 12.2 11.3 11.5 12.8 11.6 Final Depth of Pier From Existing Grade (ft) 12.3 12.9 12.3 11.2 11.5 11.3 11.5 12.8 11.7 Depth From Top of Concrete {ft) 10.8 11.4 10.8 9.7 10.0 9.8 10.0 11.3 10.2 Condition of Bottom (wet or dry) DRY DRY DRY DRY DRY DRY DRY DRY DRY Plumb Within Tolerance (yes or no) YES YE,S YES YES YES YES YES YES YES Casing Diameter (in) N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A Cased Depth (ft) N/A N/A Number of Vertical Bars (ea.) 6 6 6 6 6 6 6 6 Reinforcing Bar Size (#) 6 6 6 6 6 6 6 6 6 Length of Vertical Bars (ft.) 10.25 10.92 10.25 9.17 9,5 9.33 9.5 10.83 9.67 Time Drilling Was Completed 09:18 AM 09:26 AM 09:35 AM 09:43 AM 09:53 AM 10:05 AM 10:14 AM 10:22 AM 10:33 AM 02:55 PM 02:27 PM 03:33 PM Time Concrete Was Placed 03:17 PM 03:02 PM 02:34 PM 03:10 PM 03:25 PM 03:48 PM REPORT OF DRILLED BELLED PIERS Project: Project No.: Coppell Business Center II-Building D Coppell, Texas 43-2452-97 Report No.: Date of Service: Technician: Page: ENGINEERING, INC. 8901 Carpenter Frwy. Suite #100 Dallas, Texas 75247 9808664 04/01/1998 B. Otis 3 of 4 Pier Identification M-9 M-9.5 M-9.9 M-10 Pier _D_i_am_ eter (_in_.)- ..................... 2_4_ .2.4- ....... 2~4 .... 24 B_e_!! _Diame~te_r !!nj)_ ........... 6_o._o_ .... _6_0:0 ...... 54.0 54.0 M-10.5 24 66.0 M-11 24 66.0 L,5-11 24 66.0 A.1-2 18 36.0 1.1-A.9 18 36.0 F.5-1.1 [ 1.1-G.4 18 ~ 1--8 36.0 ! 36.0 Top of Pier Elevation (ft) Req. Depth From Exist. Grade (ft) Initial Depth of Pier From Existing Grade (ft) Final Depth of Pier From Existing Grade (fi) Depth From Top of Concrete (ft) Condition of Bottom (wet or dry) Plumb Within Tolerance (yes or no) Casing Diameter (in) Cased Depth (ft) Number of Vertical Bars (ea.) Reinforcing Bar Size (#) Length of Vertical Bars (ft.) Time Drilling Was Completed Time Concrete Was Placed 95.0 95.0 93.5 12.0 12.0 12.0 93.5 12.0 12.3 93.5 12.0 '¸1 97.5 12.0 95.0 12.0 95.0 12.0 95.0 12.0 12.3 12.0 12.8 12.0 15.0 12.0 13.0 12.9 12.6 12.2 12.8 12.3 12.0 15.0 12.0 13.2 12.9 11.1 10.7 11.3 10.8 9.5 14.5 11.5 12.7 12.4 DRY DRY DRY DRY DRY DRY DRY DRY DRY YES N/A YES N/A N/A 93.5 93.5 12.0 12.0 11.8 11.6 11.8 11.7 9.3 9.2 DRY DRY YES YES N/A N/A N/A N/A 6 6 6 6 11.83 11.67 11:36 AM 11:45 AM 04:41 PM 04:48 PM 6 YES N/A N/A YES N/A N/A 4 YES N/A YES N/A N/A N/A N/A YES N/A N/A 4 ~ N/A YES N/A N/A 6 6 6 6 6 6 6 6 6 10.58 10.17 10.83 10.33 12 14 11 12.17 11.92 10:45AM 10:57AM 11:15AM 11:27AM 11:53AM 01:05PM 01:55PM 02:08PM 02:20PM 04:56 PM 04:26 PM 04:33 PM 06:25 PM 06:16 PM 06:10 PM 04:20 PM 04:15 PM 06:38 PM REPORT OF DRILLED BELLED PIERS Project: Project No.: Pier Identification Pier Diameter (in.) ENGINEERI?~, INC. 8901 Carpenter Fnvy., Suite #100 Dallas, Texas 75247 Coppell Business Center II-Building D Coppell, Texas 43-2452-97 Bell Diameter (in.) Top of Pier Elevation (ft) Req. Depth From Exist. Grade (ft) Initial Depth of Pier From Existing Grade (fi) Final Depth of Pier From Existing Grade (fi) Depth From Top of Concrete (ft) Condition of Bottom (wet or d~j) Plumb Within Tolerance (yes or no) Casing Diameter (in) Cased Depth (ft) Reinforcing Bar Size (#) Length of Vertical Bars (ft.) Time Drilling Was Completed Time Concrete Was Placed RepoR No.: Date of Se~ice: Technician: Page: 9808664 04/01/1998 B. Otis 4 of 4 L.1-1.1 18 L.9-2 18 36.0 36.0 95.0 95.0 12.0 12.0 14.8 14.5 15.0 14.5 14.5 14.0 DRY DRY YES YES N/A N/A N/A N/A 6 6 14 13.5 02:26 PM 02:35 PM 06:45 PM 06:58 PM ~CONCRETE COMPI SIVE STRENGTH Date of Service: 04/03/1998 Report No.: Client No.: 52617000 Project No.: Client: Lincoln Property Company Project: 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 980887( 43 -2452 Coppell Belt Lin Copper Services: Obtain samples of fresh concrete at the placement locations, perform requh compressive strength samples.** SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer Concrete PLANT: 27 SPECIFICATION REQUIREMENTS STREN~rm 4000 psi ~ 28 Days 5" N/A ASTM C-143 ASTM C-172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9349 PLACEMENT DATE: 04/03/1998 TIME SAMPLED: 4:45 am BY: WEATHER CONDITIONS: Clear TEMPERATURE (F} - AIR 58 F TRUCK NO: 546 TICKI AIR CONTENT (%): N/A PLACEMENT LOCATION: Building D slab, H-J & 1-11 SAMPLE LOCATION: 1.5-1.5 CYLINDER MARKED SET NO. REPORT OF TESTS MEASURED MAXIMUM SLUMP DATE AGE LOAD (inches) TESTED (days) (lbs. force) 1 1 4.75 04/10/1998 7 90670 1 2 4.75 04/10/1998 7 90010 Average 1 3 4.75 05/01/1998 28 1 4 4.75 05/01/1998 28 AC This report is exclusively for thc use of the client indicated above and shall not be reproduced except in full without the wri 01AK Page 1 of 7 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 04/14/1998 ,97 Business Center H ~' Rd. & Lakeshore Dr. Texas ed field test and cast BATCH'lIME: N/A ~amon Elrod 3NCRET~.: 80 NO: 659202 WEiG~rr (pe0: N/A CUMULATIVE YARDS: 80 COMPRF.~IVE STRENGTH (l~i) 3210 3180 3200 TYPE aen approval of I-IBC Engineering, Inc. ' CONCRETE COMPIL SIVE STRENGTH Date of Service: 04/03/1998 Report No.: Client No.: 52617000 Project No.: Client: Lincoln Property Company Project: 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 9808871 43-245~ Coppell Belt Lit Coppeli Services: Obtain samples of fresh concrete at the placement locations, perform requi compressive strength samples.** SLUMP: AIR: TEST METHOD: CONTgACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer Concrete PLANT: 27 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi ~ 28 Days 5" N/A ASTM C-143 ASTM C-172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9349 PLACEMENT DATE: 04/03/1998 TIME SAMPLED: 6:15 am BY: WEATHER CONDITIONS: Sunny, TEMPE~,~ta~ ~- AIR 60 P ( TRUCK NO: 758 TICK] AIR CONTENT (%): N/A UN PLACEMENT LOCATION: See page I SAMPLE LOCATION: I-3 CYLINDER MARKED SET NO. REPORT OF TESTS MEASURED MAXIMUM SLUMP DATE AGE LOAD (inches) TESTED (days) (lbs. force) 2 1 4.75 04/10/1998 7 83790 2 2 4.75 04/10/1998 7 77400 Average 2 3 4.75 05/01/1998 28 2 4 4.75 05/01/1998 28 A( This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the ~ 01AK Page 2 of 7 8901 Carpenter Frwy., Suite #100 Dallas, Texa~ 75247 Report Date 04/14/1998 97 Business Center H .e Rd. & Lakeshore Dr. Texas ed field test and cast BATCH TIME: 5:53 am )amon Elrod :lear 'ONCRETE: 80 F :T NO: 659212 rr WEIG~rr (oeO: N/A :CUMULATIVE YARDS: COMPRESSIVE STRENGTH ~si) 2960 2740 2850 180 TYPE tten approval of HBC Engineering, [nc. CONCRETE COMPR,_ SIVE STRENGTH Date of Service: Client No.: Client: Services: 04/03/1998 Report No.: 980887( 52617000 Project No.: 43-2452 Lincoln Property Company 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 Project: Coppell Belt Lin Coppell Obtain samples of fresh concrete at the placement locations, perform requil compressive strength samples.** SLUMP: AIR: TEST METHOD: 'CONTRACTOR: Butler Construction CONCRETE SUPPLIER: 'Pioneer Concrete PLant: 27 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi ~ 28 Days 5" N/A ASTM C- 143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9349 PLACEME~rr DATE: 04/03/1998 TIME SAMPLED: 7:10am BY: ]' WEATHER CONDITIONS: Sunny TEMPERATURE (F) - AIR 60 F C TRUCK NO: 749 TICI~ nm co~rr~r (%): N/A UN: PLACEMENT LOCATION: See page I SAMPLE LOCATION: H.5-3.5 CYLINDER MARKED SET NO. REPORT OF TESTS MEASURED MAXIMUM SLUMP DATE AGE LOAD 0nches) TESTED (days) Obs. force) 3 1 5.00 04/10/1998 7 77460 3 2 5.00 04/10/1998 7 75280 Average 3 3 5.00 05/01/1998 28 3 4 5.00 05/01/1998 28 AC This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the wri~ 01AK Page 3 of 7 8901 Carpenter Frwy., Suite #I00 Dallas, Texas 75247 Report Date 04/14/1998 .97 Business Center II e Rd. & Lakeshore Dr. Texas ed field test and cast BATCH TIME: N/A ~amon Elrod ONCRETE: 80 F TNO: 659223 · WEIG~IT~e0: N/A CUSW't~r~VE YAR~: 280 COMPRESSIVE STRENGTH 2740 2660 2700 FRACTURE TYPE ten approval of HBC Engineering, Inc. 'CONCRETE COMPR C"3SIVE STRENGTH Date of Service: 04/03/1998 Report No.: 980887( Client No.: 52617000 Project No.: Client: Lincoln Property Company Project: 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 Services: 43-2452 Coppell Belt Lin Coppell, Obtain samples of fresh concrete at the placement locations, perform requi~ compressive strength samples.* * 8901 Carpenter Frwy~ Suite #100 Dallas, Texas 75247 Butler Construction Pioneer Concrete CONTRACTOR: CONCRETE SUPPLIER: PLANT: 27 SPECIFICATION REQUIREMENTS STREN~rH: 4000 psi @ 28 Days SLUMP: 5" ntR: N/A ~ST METHOD: ASTM C- 143 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: H.5/5.5 PROJECT DATA CONCRETE CLASS: PLACEMENT DATE: 9349 04/03/1998 .97 Report Date 04/14/1998 Business Center H ~ Rd. & Lakeshore Dr. Texas ed field test and cast RATCXWM~: N/A TIME SAMPLED: 8:35 am BY: [ ~amon Elrod WEATHER CONDITIONS: Sunny TEMPERATURE (F) - AIR 71 F C~NC-~t~'r~: 80 TRUCK NO: 749 TICK~ r NO: 659236 Am CONTENT (%): N/A UNIT WEiGrrr (oeO: N/A PLACEMENT LOCATION: See page I REPORT OF TESTS CYLINDER MEASURED MARKED SLUMP DATE SET NO. (inchea) TESTED 4 1 5.00 04/10/1998 4 2 5.00 04/10/1998 MAXIMUM AGE LOAD (days) Obs. force) 7 79740 7 80770 Average 4 3 5.00 05/01/1998 28 4 4 5.00 05/01/1998 28 AC This report is exclusively for the use of the client indicated above and shall not bc reproduced except in full without the wri UUMULATIVE YARDS: 380 2OMPRF.~IVE STRENGTH 2820 2860 2840 TYPE approval of HBC Engineering, Inc. 01AK Page 4 of 7 'CONCRETE COMPR . SIVE STRENGTH TE '? Date of Service: 04/03/1998 Client No.: 52617000 Client: Lincoln Property Company 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 Report No.: 9808870 Project No.: 43-2452. Project: Coppell Belt Lin Coppell, Services: Obtain samples of fresh concrete at the placement locations, perform requir~ compressive strength samples.** SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer Concrete PLANT: 27 SPECIFICATION REQUIREMENTS S~NGTtI: 4000 psi ~ 28 Days 5" N/A ASTM C-143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9349 PLACEMENT DATE: 04/03/1998 TIME SAMPLED: 10:10 am BY: D WEATHER CONDITIONS: Sunny TEMPERATURE (F) - AIR 71 F c( TRUCK NO: 758 T~CK~' AIR CONTENT (%): N/A unt PLACEMENT LOCATION: See page 1 SAMPLE LOCATION: I-7.5 CYLINDER MEASURED MARKED SLUMP DATE SET NO. (inch,) TESTED 5 1 5.00 04/10/1998 5 2 5.00 04/10/1998 REPORT OF TESTS MAXIMUM AGE LOAD (days) (lbs. force) 7 99370 7 103950 Average 5 3 5.00 05/01/1998 28 5 4 5.00 05/01/1998 28 This t~port is exclusively for the use of the client indicated above and shall not be reproduced except in full without the writ 01AK Page 5 of 7 8901 Carpenter Fray., Suite #100 Dallas, Texas 75247 Report Date 04/14/1998 97 3usiness Center II :Rd. & Lakeshore Dr. Texas ~'d field test and cast BATCH TIM~: 9:14 am amon Elrod ~nca~rE: 80 F ' NO: 659250 WEIGHT (PC0: N/A :UMULATIVE YARDS: 470 ,~OMPRgSSIVE STRENGTI1 (psi) 3510 3680 36O0 TYPE en approval of HBC Engineering. Inc. 'CONCRETE COMPR r" SIVE STRENGTH Date of Service: Client No.: Client: Services: 04/03/1998 Report No.: 980887( 52617000 Project No.: 43-2452 Lincoln Property Company 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 Project: Coppell Belt Lin Coppell Obtain samples of fresh concrete at the placement locations, perform requil compressive strength samples.** SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer Concrete PLANT: 27 SPECIFICATION REQUIREMENTS s~mm~rn: 4000 psi ~ 28 Days 5" N/A ASTM C-143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRET~ CLASS: 9349 PLACEMENT DATE: 04/03/1998 TIME SAMPLEO: 11:50 am BY: [ WEATHER CONDITIONS: Sunny TEMPERATURE (F) - AIR 74 F C TRUCK NO: 582 AIR CONTENT (%): N/A UN~ PLACEMENT LOCATION: See page I SAMPLE LOCATION: I-9 REPORT OF TESTS CYLINDER MEASURED MAXIMUM MARKED SLUMP DATE AGE LOAD SET NO. (inch.) TESTED (days) Obs. force) 6 1 5.00 04/10/1998 7 99240 6 2 5.00 04/10/1998 7 100470 Average 6 3 5.00 05/01/1998 28 6 4 5.00 05/01/1998 28 AC This report is exclusively for thc use of the client indicated above and shall not be reproduced except in full without the writ 01AK Page 6 of 7 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 04/14/1998 .97 Business Center II ~ Rd. & Lakeshore Dr. Texas ed field test and cast BATCH TIME: 1 1:20 am ~amon Elrod ~)NCRETE: 80 F TNO: 659270 T WEIGHT (pcf): N/A CUMULATIVE YARDS: 2OMPRESSIVE STRENGTH (psi) 3510 3550 3530 580 =n approval of HBC Engineering, Inc. 'CONCRETE COMPRi ,SIVE STRENGTH Date of Service: Client No.: Client: 04/03/1998 52617000 Lincoln Property Company 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 Report No.: 9808870 Project No.: 43-2452. Project: Coppell Belt Lin Coppell, Services: Obtain samples of fresh concrete at the placement locations, perform requir, compressive strength samples.** SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer Concrete PLANT: 27 SPECIFICATION REQUIREMENTS STRENgTh: 4000 psi ~ 28 Days N/A ASTM C-143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9349 PLACEME~rr DATE: 04/03/1998 TIME SAMPLED: 2:20 pm BY: D WEATHER CONDITIONS: TEMPERATURE (F) - Am TRUCK NO: 762 AIR CONTENT (%): N/A PLACEMENT LOCATION: See page ! Sunny 78 F c~ TICKE' UNI SAMPLE LOCATION: H.5-10.5 CYLINDER MARKED SET NO. MEASURED SLUMP (inches) 7 1 5.00 7 2 5.00 7 3 5.00 7 4 5.00 REPORT OF TESTS DATE TESTED 04/10/1998 04/10/1998 MAXIMUM AGE LOAD (days) 0lA. force) 7 107870 7 111750 Average 05/01/1998 05/01/1998 28 28 AC~ 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 04/14/1998 97 3usiness Center II :Rd. & Lakeshore Dr. Texas ~'d field test and cast BATCH TIME: 1:45 pm amon Elrod )NCRETE: 80 F r NO: 659302 WEIGHT (PC0: N/A UMULATIVE YARDS: 680 2OMPRESSIVE STRENGTH (psi) 381'0 3950 3880 Technician: Damon Elrod Report Distribution: (I) Lincoln Property Company (l) Butler Construction {i) O'Brien & Associates (!) AECC, Inc. 01AK Started: 3:30 am (l) City of Coppell/BIdg. lnsp. (I) City of Coppell/Constr. Insp. Finished: 5:00 pm Inc. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the wr Page 7 of 7 :ugene Harbour Vice President ~en approval of HBC Enginex~ing, Inc.