Northlake 635(3)-LR 980417CONCRETE COMPR SIVE STRENGTH
Date of Service: 04/08/1998 Report No.:
Client No.: 52617000 Project No.:
Client: Lincoln Property Company Project:
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
98O921 (
43-2452
Coppell
Belt Lin
Coppell,
Services: Obtain samples of fresh concrete at the placement locations, perform requif
compressive strength samples.**
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 22
SPECIFICATION REQUIREMENTS
STRENGTH: 3500 psi ~ 28 Days
5"
N/A
ASTM C- 143
ASTM C- 172
ASTM C-39
PROJECT DATA
CONCRETE CLASS:
PLACEMENT DATE:
TIME SAMPLED: 8:50 am
WEATHER CONDITIONS:
TEMPERATURE (F) - AIR
TRUCK NO: 736
AIR CONTENT (%): N/A
PLACEMENT LOCATION:
Panels Building A, 14-19, 10, 2, 56-61
9337
04/08/1998
BY: [
Partly cl
69 F c
TICK[
UN
SAMPLE LOCATION: Panel 19
CYLINDER
MARKED
SET NO.
REPORT OF TESTS
MEASURED MAXIMUM
SLUMP DATE AGE LOAD
(inches) TESTED (days) (lbs. force)
I 1 4.75 04/15/1998 7 72010
I 2 4.75 04/15/1998 7 65870
Average
I 3 4.75 05/06/1998 28
1 4 4.75 05/06/1998 28
AC
This report is exclusivcly for thc usc of thc client indicated above and shall not bc reproduced cxccpt in full without thc wri
01AK Page 1 of 2
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
04/17/1998
-97
Business Center II
~ Rd. & Lakeshore Dr.
Texas
ed field test and cast
BATCH TIME: 8:00 am
~amon Elrod
~udy
DNCRETE: 80 F
TNO: 640368
TWEIGHT (pc0: N/A
CUMULATIVE YARDS: 70
COMPRESSIVE
STRENGTH
(psi)
2550
2330
2440
FRACTURE
TYPE
tten approval of HBC Engineering, Inc.
cONCRETE COMPRr'3SIVE STRENGTH TE?
Date of Service: 04/08/1998
Client No.: 52617000
Client:
Services:
Lincoln Property Company
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 22
SPECIFICATION REQUIREMENTS
STRENGTH: 3500 psi @ 28 Days
SLUMP:
AIR:
TEST METHOD:
SAMPLE LOCATION:
Report No.: 980921~
Project No.: 43-245~
Project: Coppell
Belt Lin
Coppell
CYLINDER MEASURED
MARKED SLUMP DATE AGE LOAD
SET NO. (inches) TESTED (~lays) (lbs. force)
-97
ENGINEERING, INC.
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
04/17/1998
Business Center II
e Rd. & Lakeshore Dr.
Texas
Obtain samples of fresh concrete at the placement locations, perform requi]
compressive strength samples.**
PROJECT DATA
CONCRETE CLASS: 9337
PLACEMENT DATE: 04/08/1998
TIME SAMPLED: 10:05 am BY:
WEATHER CONDITIONS: Partly
TEMPERATURE (F) - AIR 74 F CONCRETE: 82
5" TRUCKNO: 841 TICK!
N/A AIR CONTENT (%): N/A UN
ASTM C- 143 PLACEMENT LOCATION:
See page l
ASTM C-172
ASTM C-39
Panel 58
REPORT OF TESTS A(
MAXIMUM
ed field test and cast
BATCH TIME: 9:09 am
)amon Elrod
~udy
2 1 5.00 04/15/1998 7 1~5330
2 2 5.00 04/15/1998 7 84240
Average
Finished: 12:00
;T NO: 640380
IT WEIGHT (pcf): N/A
'CUMULATIVE YARDS:
COMPRESSIVE
STRENGTH
(psi)
3020
2980
3000
2 3 5.00 05/06/1998 28
2 4 5.00 05/06/1998 28
Started: 8:30 am
( I ) City of Coppell/BIdg. Insp.
Technician: Damon Elrod
Report Distribution:
(I) Lincoln Property Company
170
FRACTURE
TYPE
]~ugene ~r
( 1 ) Butler Construction ( I ) City of Coppell/Constr. lnsp.
(1) O'Brien & Associates / Vice President
( 1 ) AECC, Inc.
/
This report is exclusively tbr the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
01AK Page 2 of 2
CONCRETE COMPRESSIVE STRENGTH
Date of Service:
Client No.:
Client:
Services:
04/08/1998 Report No.: 980921
52617000 Project No.: 43-2452
Lincoln Property Company
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Project:
Coppell
Belt Lil
Coppell
Obtain samples of fresh concrete at the placement locations, perform requi
compressive strength samples.**
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 22
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi @ 28 Days
5 u
N/A
ASTM C- 143
ASTM C- 172
ASTM C-39
PROJECT DATA
CONCRETE CLASS: 9349
PLACEMENT DATE: 04/08/1998
TIME SAMPLED: 5:50 am BY:
WEATHER CONDITIONS: Cloudy
TEMPERATURE (F) - AIR . 69
TRUCK NO: 552 TICKI
AIR CONTENT (%): N/A
PLACEMENT LOCATION:
Building D slab, J-M & 9-11
SAMPLE LOCATION: L.5/9.5
CYLINDER
MARKED
SET NO.
REPORT OF TESTS
MEASURED MAXIMUM
SLUMP DATE .AGE LOAD
(inches) TESTED (days) (lbs. force)
1 1 4.75 04/15/1998 7 82570
1 2 4.75 04/15/1998 7 84240
Average
I 3 4.75 05/06/1998 28
1 4 4.75 05/06/1998 28
A(
This report is exclusively tbr the use of the client indicated above and shall not be reproduced except in full without the w
01AK Page I of 2
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
04/17/1998
.97
Business Center II
e Rd. & Lakeshore Dr.
Texas
ed field test and cast
BATCHTIME: 5'05 am
)amon Elrod
ONCRETE: 83 F
:T NO: 640348
IT WEIGHT (pc0: N/A
:CUMULATIVE YARDS: 70
COMPRESSIVE
STRENGTH
(psi)
2920
2980
2950
FRACTURE
TYPE
tten approval of HBC Engineering, Inc.
CONCRETE COMPRr SIVE STRENGTH
Date of Service:
Client No.:
Client:
Services:
CONTRACTOR:
CONCRETE SUPPLIER:
PLANT:
04/08/1998 Report No.: 98092
52617000 Project No.: 43-2452
Lil~coln Property Company
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Project:
Coppell
Belt Lin
Coppell,
Obtain samples of fresh concrete at the placement locations, perform requir
compressive strength samples.**
Butler Construction
Pioneer Concrete
22
PROJECT DATA
CONCRETE CLASS: 9349
PLACEMENT DATE: 04/08/1998
TIME SAMPLED: 6:35 am BY: E
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
SLUMP:
AIR:
TEST METHOD:
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi ~ 28 Days
N/A
ASTM C- 143
ASTM C- 172
ASTM C-39
SAMPLE LOCATION: K-10.5
CYLINDER MEASURED
MARKED SLUMP
SET NO. (inches)
2 I 5.00
2 2 5.00
2 3 5.00
2 4 5.00
WEATHER CONDITIONS: Mostly C
TEMPERATURE (F)-AIR 67 F o
TRUCK NO: 75 6 TICKE
AIR CONTENT (%): N/A UNI
PLACEMENT LOCATION:
See page I
REPORT OF TESTS
MAXIMUM
DATE AGE LOAD
TESTED (days) (lbs. force)
04/15/1998 7 93250
04/15/1998 7 89900
Average
05/06/1998 28
05/06/1998 28
Technician: Damon Elrod
Report Distribution:
(I) Lincoln Property Company
(I) Butler Construction
(I) O'Briea & Associates
(I) AECC. Inc.
AO
Started: 3:00 am Finished: 8:30 am ~
(l) City of Coppell/BIdg. lnsp.
( 1 ) City of Coppell/Constr. Insp. iq
This report is exclusively tbr thc use of the client indicated above and shall not be reproduced except in full without the writ
Report Date
04/17/1998
-97
Business Center II
.~ Rd. & Lakeshore Dr.
Texas
ed field test and cast
BATCH TIME: 6:13 am
amon Elrod
loudy
)NCRETE: 83 F
rNO: 640358
rWEIGHT(p¢0: N/A
~UMULATIVE YARDS:
?OMPRESSIVE
STRENGTH
(psi)
3300
3180
3240
ugene Harbour
Vice President
170
FRACTURE
TYPE
approval of HBC Engineering, Inc.
01AK Page 2 of 2
'CONCRETE COMPR oSIVE STRENGTH TES ' .
Date of Service: 04/09/1998 Report No.:
Client No.: 52617000 Project No.:
Client: Lincoln Property Company Project:
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
9809332
43-2452-
Coppell
Belt Lin,
Coppeli,
Services: Obtain samples of fresh concrete at the placement locations, perform requir,
compressive strength samples.**
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 22
SPECIFICATION REQUIREMENTS
STgENGTm 4000 psi ~ 28 Days
5"
N/A
^STM C-143
ASTM C- 172
ASTM C-39
PROJECT DATA
CONCRETE CLASS: 9349
PLACEMENT DAn: 04/09/1998
TIME SAMPLED: 7:05 am BY: I~
WEATHER CONDITIONS:
TEMPERATURE (F) - AIR
TRUCK NO: 1805
AIR CONTENT (%): N/A
PLACEMENT LOCATION:
Building D slab, F-H & 1-9
Clear, wi
51 F
TICKE
UNI
SAMPLE LOCATION: H-I.5
REPORT OF TESTS
CYLINDER MEASURED
MARKED SLUMP DATE
SET NO. (inches) TESTED
1 1 4.75 04/16/1998
1 2 4.75 04/16/1998
MAXIMUM
AGE LOAD
(days) (Ib~. force)
7 95830
7 89330
Average
1 3 4.75 05/07/1998 28
1 4 4.75 05/07/1998 28
AC
This report is exclusively for the use of the client indicated above and shall not Ig reproduced except in full without the wri
01AK Page I of 5
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
97
Report Date
04/17/1998
~usiness Center II
: Rd. & Lakeshore Dr.
Texas
',d field test and cast
BATCH TIME: 6:22 am
amon Elrod
ndy
)NCRETE: 80 F
r NO: 640451
r WER;NT (~0: N/A
CUMULATIVE YARDS:
YOMPRESSIVE
STRENGTH
(psi)
3390
3160
3280
8O
.~en npproval of HBC Engineering, Inc.
CONCRETE COMPRr'3SIVE STRENGTH TE?Y
Date of Service: 04/09/1998
Client No.: 52617000
Client: Lincoln Property Company
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Report No.: 980933~
Project No.: 43-2452
Project: Coppell
Belt Lin
Coppell,
Services: Obtain samples of fresh concrete at the placement locations, perform requis
compressive strength samples.**
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 22
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi ~ 28 Days
5*'
N/A
ASTM C-143
ASTM C- 172
ASTM C-39
PROJECT DATA
CONCRETE CLASS: 9349
PLACEMENT DATE: 04/09/1998
TIME SAMPLED: 7:25 am BY: l'
WEATHER CONDITIONS: Clear, w
TEMPERATURE (F) - AIR 52 F C
TRUCK NO: 867 T~C~
AIR CONTENT (%): N/A UNI
PLACEMENT LOCATION:
Sec page I
SAMPLE LOCATION: G-2.5
CYLINDER
MARKED
SET NO.
REPORT OF TESTS
MEASURED MAXIMUM
SLUMP DATE AGE LOAD
(inches) TESTED (days) (lbs. force)
2 1 4.50 04/16/1998 7 96200
2 2 4.50 04/16/1998 7 91310
Average
2 3 4.50 05/07/1998 28
2 4 4.25 05/07/1998 28
AC
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the wril
01AK Page 2 of 5
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
04/17/1998
.97
Business Center II
.- Rd. & Lakeshore Dr.
Texas
ed field test and cast
BATCH TIME: 7:00 am
*amon Elrod
indy
~)NCRETE: 80 F
T NO: 640457
T WEIGHT (pc0: N/A
CUMUt,nTIVE YAm)S: 120
~OMPRE~IVE
STRENGTH
(psi)
3400
3230
3320
TYPE
ten approval of HBC Engineering, Inc.
CONCRETE COMPRi. oSIVE STRENGTH
Date of Service:
Client No.:
Client:
04/09/1998
52617000
Lincoln Property Company
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Report No.: 9809332
Project No.: 43-2452.
Project: Coppell
Belt Lin
Coppell,
Services: Obtain samples of fresh concrete at the placement locations, perform requi~
compressive strength samples.**
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
Pt.~r: 22
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi ~ 28 Days
5"
N/A
ASTM C- 143
ASTM C- 172
ASTM C-39
PROJECT DATA
CONCRETE CLASS: 9349
PLACEMENT DATE: 04/09/199
TIME SAMPLED: 9:40 am BY:
WEATHER CONDmONS: , Sunny
TEMPERATURE (l~ - AIR 62 r
TRUCK NO: 846 TICKE
AIR CONTENT (%): N/A UNI
PLACEMENT LOCATION:
See page I
SAMPLE LOCATION: G-5.5
CYLINDER MEASURED
MARKED SLUMP DATE
SET NO. (inches) TESTED
3 1 5.50 04/16/1998
3 2 5.50 04/16/1998
REPORT OF TESTS
MAXIMUM
AGE LOAD
(days) (lbs. force)
7 91210
7 97810
Average
3 3 5.50 05/07/1998 28
3 4 5.50 05/07/1998 28
AC
Note: Contractor notified of slump.
This report is exclusively for th= use of thc client indicated above and shall not bo reprodu~d ~x~pt in full without thc wri
01AK Page 3 of 5
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
04/17/1998
97
3usiness Center II
~Rd. & Lakeshore Dr.
Texas
field test and cast
BATCH TIME: 9:12 am
amen EIrod
)NCRETE: 80 F
r NO: 640486
T WEIGHT (pc0: N/A
CUMULATIVE YARDS: 270
COMPRESSIVE
STRENGTH
(p,i)
3230
3460
3350
ttcn approval of HBC Engineering, lnc;
CONCRETE COMP SIVE STRENGTH
Date of Service: 04/09/1998 Report No.:
Client No.: 52617000 Project No.:
Client: Lincoln Property Company Project:
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
9809332
43-2452.
Coppell
Belt Lin~
Coppeli,
Services: Obtain samples of fresh concrete at the placement locations, perform requir
compressive strength samples.**
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 22
SPECIFICATION REQUIREMENTS
STRENGTh: 4000 psi ~ 28 Days
5"
N/A
ASTM C-143
ASTM C- 172
ASTM C-39
PROJECT DATA
CONCRETE CLASS: 9349
Pt. ACEMENT DATE: 04/09/1998
TIME SAMPLED: 10:40 am BY: E
WEATHER CONDITIONS: Sunny
TEMPERATURE (F) - AIR 63 g c
TRUCKNO: 841 TICKE
AIR CONTENT (%): N/A trn~
PLACEMENT LOCATION:
See page !
SAMPLE LOCATION: H-6.5
CYLINDER
MARKED
SET NO.
REPORT OF TESTS
MEASURED MAXIMUM
SLUMP DATE AGE LOAD
(inches) TESTED (days) (lbs. force)
4 1 4.75 04/16/1998 7 102230
4 2 4.75 04/16/1998 7 99230
Average
4 3 4.75 05/07/1998 28
4 4 4.75 05/07/1998 28
AC
This report is exclusively for thc usc of thc client indicated above and shall not be reproduced except in full without the wri
01AK Page 4 of 5
8901 Carpenter Frwy. Suite #100
Dallas, Texas 75247
Report Date
04/17/1998
~97
Business Center II
~' Rd. & Lakeshore Dr.
Texas
~d field test and cast
BATCHTIME: 10:15 am
,amon Elrod
)NCRETE: 80 F
r No: 640501
T WEIGHT (pcf): N/A
CUMULATIVE YARDS: 350
UOMPRESSIVE
STRENGTH
(psi)
3620
3510
3570
TYPE
~n approval of HBC Engineering, Inc.
CONCRETE
COMPR SIVE STRENGTH
Date of Service: 04/09/1998
Client No.: 52617000
Client:
SLUMP:
AIR:
TEST METHOD:
Services:
Lincoln Property Company
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Report No.: 9809332
Project No.: 43-2452
Project: Coppell
Belt Lin
Coppeli,
Obtain samples of fresh concrete at the placement locations, perform requit
compressive strength samples.**
Butler Construction
Pioneer Concrete
22
CONTRACTOR:
CONCRETE SUPPLIER:
PLANT:
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi ~ 28 Days
5"
N/A
ASTM C-143
ASTM C- 172
ASTM C-39
DATE
TESTED
04/16/1998
04/16/1998
05/07/1998
05/07/1998
SAMPLE LOCATION: G.5-8.5
Started: 3:00 am
(1) City of Coppell/Bldg. [nsp.
(1) City of Coppell/Constr. Insp.
MEASURED
SLUMP
(inches)
CYLINDER
MARKED
SET NO.
5 I 5.00
5 2 5.00
5 3 5.00
5 4 5.00
Technician: Damon Elrod
Report Distribution:
(1) Lincoln PrOlgrty Company
(1) Butler Construction
(1) O'Brien & Associates
(I) AECC, Inc.
PROJECT DATA
CONCRE~rE CLASS: 9349
PLACEMENT DATE: 04/09/1998
TtME SAMPLEO: 12:30 pm aY: [
WEATHER CO~DmONS: Sunny
TEMPERATURE (F} - AIR 68 F C
TRVCKNO: 867 TIC~
AIR CONTENT (%): N/A tm:
PLACEMENT LOCATION:
See page I
REPORT OF TESTS
MAXIMUM
AGE LOAD
(days) (lbs. force)
7 116230
7 115340
Avernge
28
28
This report is exclusively tbr thc usc of thc client indicated above and shall not bc reproduced except in full without
AC
8901 Carpenter Frwy., Suite #100
Dallas, Texaa 75247
Report Date
04/17/1998
-97
Business Center II
.~ Rd. & Lakcshore Dr.
Texas
ed field test and cast
BATCHTIME: 12:25 pm
~amon Elrod
DNCRETE: 80 F
TNO: 640530
X WEIGHT (poi): N/A
CUMULATIVE YARDS: 490
COMPRESSIVE
STRENGTH
(ini)
4110
4080
4100
Finished: 5:00 pm nI-~ Engine~nc~
Engineering, Inc.
01AK Page 5 of 5