Loading...
Northlake 635(3)-LR 980417CONCRETE COMPR SIVE STRENGTH Date of Service: 04/08/1998 Report No.: Client No.: 52617000 Project No.: Client: Lincoln Property Company Project: 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 98O921 ( 43-2452 Coppell Belt Lin Coppell, Services: Obtain samples of fresh concrete at the placement locations, perform requif compressive strength samples.** SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer Concrete PLANT: 22 SPECIFICATION REQUIREMENTS STRENGTH: 3500 psi ~ 28 Days 5" N/A ASTM C- 143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: PLACEMENT DATE: TIME SAMPLED: 8:50 am WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: 736 AIR CONTENT (%): N/A PLACEMENT LOCATION: Panels Building A, 14-19, 10, 2, 56-61 9337 04/08/1998 BY: [ Partly cl 69 F c TICK[ UN SAMPLE LOCATION: Panel 19 CYLINDER MARKED SET NO. REPORT OF TESTS MEASURED MAXIMUM SLUMP DATE AGE LOAD (inches) TESTED (days) (lbs. force) I 1 4.75 04/15/1998 7 72010 I 2 4.75 04/15/1998 7 65870 Average I 3 4.75 05/06/1998 28 1 4 4.75 05/06/1998 28 AC This report is exclusivcly for thc usc of thc client indicated above and shall not bc reproduced cxccpt in full without thc wri 01AK Page 1 of 2 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 04/17/1998 -97 Business Center II ~ Rd. & Lakeshore Dr. Texas ed field test and cast BATCH TIME: 8:00 am ~amon Elrod ~udy DNCRETE: 80 F TNO: 640368 TWEIGHT (pc0: N/A CUMULATIVE YARDS: 70 COMPRESSIVE STRENGTH (psi) 2550 2330 2440 FRACTURE TYPE tten approval of HBC Engineering, Inc. cONCRETE COMPRr'3SIVE STRENGTH TE? Date of Service: 04/08/1998 Client No.: 52617000 Client: Services: Lincoln Property Company 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer Concrete PLANT: 22 SPECIFICATION REQUIREMENTS STRENGTH: 3500 psi @ 28 Days SLUMP: AIR: TEST METHOD: SAMPLE LOCATION: Report No.: 980921~ Project No.: 43-245~ Project: Coppell Belt Lin Coppell CYLINDER MEASURED MARKED SLUMP DATE AGE LOAD SET NO. (inches) TESTED (~lays) (lbs. force) -97 ENGINEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 04/17/1998 Business Center II e Rd. & Lakeshore Dr. Texas Obtain samples of fresh concrete at the placement locations, perform requi] compressive strength samples.** PROJECT DATA CONCRETE CLASS: 9337 PLACEMENT DATE: 04/08/1998 TIME SAMPLED: 10:05 am BY: WEATHER CONDITIONS: Partly TEMPERATURE (F) - AIR 74 F CONCRETE: 82 5" TRUCKNO: 841 TICK! N/A AIR CONTENT (%): N/A UN ASTM C- 143 PLACEMENT LOCATION: See page l ASTM C-172 ASTM C-39 Panel 58 REPORT OF TESTS A( MAXIMUM ed field test and cast BATCH TIME: 9:09 am )amon Elrod ~udy 2 1 5.00 04/15/1998 7 1~5330 2 2 5.00 04/15/1998 7 84240 Average Finished: 12:00 ;T NO: 640380 IT WEIGHT (pcf): N/A 'CUMULATIVE YARDS: COMPRESSIVE STRENGTH (psi) 3020 2980 3000 2 3 5.00 05/06/1998 28 2 4 5.00 05/06/1998 28 Started: 8:30 am ( I ) City of Coppell/BIdg. Insp. Technician: Damon Elrod Report Distribution: (I) Lincoln Property Company 170 FRACTURE TYPE ]~ugene ~r ( 1 ) Butler Construction ( I ) City of Coppell/Constr. lnsp. (1) O'Brien & Associates / Vice President ( 1 ) AECC, Inc. / This report is exclusively tbr the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01AK Page 2 of 2 CONCRETE COMPRESSIVE STRENGTH Date of Service: Client No.: Client: Services: 04/08/1998 Report No.: 980921 52617000 Project No.: 43-2452 Lincoln Property Company 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 Project: Coppell Belt Lil Coppell Obtain samples of fresh concrete at the placement locations, perform requi compressive strength samples.** SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer Concrete PLANT: 22 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi @ 28 Days 5 u N/A ASTM C- 143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9349 PLACEMENT DATE: 04/08/1998 TIME SAMPLED: 5:50 am BY: WEATHER CONDITIONS: Cloudy TEMPERATURE (F) - AIR . 69 TRUCK NO: 552 TICKI AIR CONTENT (%): N/A PLACEMENT LOCATION: Building D slab, J-M & 9-11 SAMPLE LOCATION: L.5/9.5 CYLINDER MARKED SET NO. REPORT OF TESTS MEASURED MAXIMUM SLUMP DATE .AGE LOAD (inches) TESTED (days) (lbs. force) 1 1 4.75 04/15/1998 7 82570 1 2 4.75 04/15/1998 7 84240 Average I 3 4.75 05/06/1998 28 1 4 4.75 05/06/1998 28 A( This report is exclusively tbr the use of the client indicated above and shall not be reproduced except in full without the w 01AK Page I of 2 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 04/17/1998 .97 Business Center II e Rd. & Lakeshore Dr. Texas ed field test and cast BATCHTIME: 5'05 am )amon Elrod ONCRETE: 83 F :T NO: 640348 IT WEIGHT (pc0: N/A :CUMULATIVE YARDS: 70 COMPRESSIVE STRENGTH (psi) 2920 2980 2950 FRACTURE TYPE tten approval of HBC Engineering, Inc. CONCRETE COMPRr SIVE STRENGTH Date of Service: Client No.: Client: Services: CONTRACTOR: CONCRETE SUPPLIER: PLANT: 04/08/1998 Report No.: 98092 52617000 Project No.: 43-2452 Lil~coln Property Company 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 Project: Coppell Belt Lin Coppell, Obtain samples of fresh concrete at the placement locations, perform requir compressive strength samples.** Butler Construction Pioneer Concrete 22 PROJECT DATA CONCRETE CLASS: 9349 PLACEMENT DATE: 04/08/1998 TIME SAMPLED: 6:35 am BY: E 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 SLUMP: AIR: TEST METHOD: SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi ~ 28 Days N/A ASTM C- 143 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: K-10.5 CYLINDER MEASURED MARKED SLUMP SET NO. (inches) 2 I 5.00 2 2 5.00 2 3 5.00 2 4 5.00 WEATHER CONDITIONS: Mostly C TEMPERATURE (F)-AIR 67 F o TRUCK NO: 75 6 TICKE AIR CONTENT (%): N/A UNI PLACEMENT LOCATION: See page I REPORT OF TESTS MAXIMUM DATE AGE LOAD TESTED (days) (lbs. force) 04/15/1998 7 93250 04/15/1998 7 89900 Average 05/06/1998 28 05/06/1998 28 Technician: Damon Elrod Report Distribution: (I) Lincoln Property Company (I) Butler Construction (I) O'Briea & Associates (I) AECC. Inc. AO Started: 3:00 am Finished: 8:30 am ~ (l) City of Coppell/BIdg. lnsp. ( 1 ) City of Coppell/Constr. Insp. iq This report is exclusively tbr thc use of the client indicated above and shall not be reproduced except in full without the writ Report Date 04/17/1998 -97 Business Center II .~ Rd. & Lakeshore Dr. Texas ed field test and cast BATCH TIME: 6:13 am amon Elrod loudy )NCRETE: 83 F rNO: 640358 rWEIGHT(p¢0: N/A ~UMULATIVE YARDS: ?OMPRESSIVE STRENGTH (psi) 3300 3180 3240 ugene Harbour Vice President 170 FRACTURE TYPE approval of HBC Engineering, Inc. 01AK Page 2 of 2 'CONCRETE COMPR oSIVE STRENGTH TES ' . Date of Service: 04/09/1998 Report No.: Client No.: 52617000 Project No.: Client: Lincoln Property Company Project: 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 9809332 43-2452- Coppell Belt Lin, Coppeli, Services: Obtain samples of fresh concrete at the placement locations, perform requir, compressive strength samples.** SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer Concrete PLANT: 22 SPECIFICATION REQUIREMENTS STgENGTm 4000 psi ~ 28 Days 5" N/A ^STM C-143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9349 PLACEMENT DAn: 04/09/1998 TIME SAMPLED: 7:05 am BY: I~ WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: 1805 AIR CONTENT (%): N/A PLACEMENT LOCATION: Building D slab, F-H & 1-9 Clear, wi 51 F TICKE UNI SAMPLE LOCATION: H-I.5 REPORT OF TESTS CYLINDER MEASURED MARKED SLUMP DATE SET NO. (inches) TESTED 1 1 4.75 04/16/1998 1 2 4.75 04/16/1998 MAXIMUM AGE LOAD (days) (Ib~. force) 7 95830 7 89330 Average 1 3 4.75 05/07/1998 28 1 4 4.75 05/07/1998 28 AC This report is exclusively for the use of the client indicated above and shall not Ig reproduced except in full without the wri 01AK Page I of 5 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 97 Report Date 04/17/1998 ~usiness Center II : Rd. & Lakeshore Dr. Texas ',d field test and cast BATCH TIME: 6:22 am amon Elrod ndy )NCRETE: 80 F r NO: 640451 r WER;NT (~0: N/A CUMULATIVE YARDS: YOMPRESSIVE STRENGTH (psi) 3390 3160 3280 8O .~en npproval of HBC Engineering, Inc. CONCRETE COMPRr'3SIVE STRENGTH TE?Y Date of Service: 04/09/1998 Client No.: 52617000 Client: Lincoln Property Company 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 Report No.: 980933~ Project No.: 43-2452 Project: Coppell Belt Lin Coppell, Services: Obtain samples of fresh concrete at the placement locations, perform requis compressive strength samples.** SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer Concrete PLANT: 22 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi ~ 28 Days 5*' N/A ASTM C-143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9349 PLACEMENT DATE: 04/09/1998 TIME SAMPLED: 7:25 am BY: l' WEATHER CONDITIONS: Clear, w TEMPERATURE (F) - AIR 52 F C TRUCK NO: 867 T~C~ AIR CONTENT (%): N/A UNI PLACEMENT LOCATION: Sec page I SAMPLE LOCATION: G-2.5 CYLINDER MARKED SET NO. REPORT OF TESTS MEASURED MAXIMUM SLUMP DATE AGE LOAD (inches) TESTED (days) (lbs. force) 2 1 4.50 04/16/1998 7 96200 2 2 4.50 04/16/1998 7 91310 Average 2 3 4.50 05/07/1998 28 2 4 4.25 05/07/1998 28 AC This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the wril 01AK Page 2 of 5 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 04/17/1998 .97 Business Center II .- Rd. & Lakeshore Dr. Texas ed field test and cast BATCH TIME: 7:00 am *amon Elrod indy ~)NCRETE: 80 F T NO: 640457 T WEIGHT (pc0: N/A CUMUt,nTIVE YAm)S: 120 ~OMPRE~IVE STRENGTH (psi) 3400 3230 3320 TYPE ten approval of HBC Engineering, Inc. CONCRETE COMPRi. oSIVE STRENGTH Date of Service: Client No.: Client: 04/09/1998 52617000 Lincoln Property Company 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 Report No.: 9809332 Project No.: 43-2452. Project: Coppell Belt Lin Coppell, Services: Obtain samples of fresh concrete at the placement locations, perform requi~ compressive strength samples.** SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer Concrete Pt.~r: 22 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi ~ 28 Days 5" N/A ASTM C- 143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9349 PLACEMENT DATE: 04/09/199 TIME SAMPLED: 9:40 am BY: WEATHER CONDmONS: , Sunny TEMPERATURE (l~ - AIR 62 r TRUCK NO: 846 TICKE AIR CONTENT (%): N/A UNI PLACEMENT LOCATION: See page I SAMPLE LOCATION: G-5.5 CYLINDER MEASURED MARKED SLUMP DATE SET NO. (inches) TESTED 3 1 5.50 04/16/1998 3 2 5.50 04/16/1998 REPORT OF TESTS MAXIMUM AGE LOAD (days) (lbs. force) 7 91210 7 97810 Average 3 3 5.50 05/07/1998 28 3 4 5.50 05/07/1998 28 AC Note: Contractor notified of slump. This report is exclusively for th= use of thc client indicated above and shall not bo reprodu~d ~x~pt in full without thc wri 01AK Page 3 of 5 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 04/17/1998 97 3usiness Center II ~Rd. & Lakeshore Dr. Texas field test and cast BATCH TIME: 9:12 am amen EIrod )NCRETE: 80 F r NO: 640486 T WEIGHT (pc0: N/A CUMULATIVE YARDS: 270 COMPRESSIVE STRENGTH (p,i) 3230 3460 3350 ttcn approval of HBC Engineering, lnc; CONCRETE COMP SIVE STRENGTH Date of Service: 04/09/1998 Report No.: Client No.: 52617000 Project No.: Client: Lincoln Property Company Project: 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 9809332 43-2452. Coppell Belt Lin~ Coppeli, Services: Obtain samples of fresh concrete at the placement locations, perform requir compressive strength samples.** SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer Concrete PLANT: 22 SPECIFICATION REQUIREMENTS STRENGTh: 4000 psi ~ 28 Days 5" N/A ASTM C-143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9349 Pt. ACEMENT DATE: 04/09/1998 TIME SAMPLED: 10:40 am BY: E WEATHER CONDITIONS: Sunny TEMPERATURE (F) - AIR 63 g c TRUCKNO: 841 TICKE AIR CONTENT (%): N/A trn~ PLACEMENT LOCATION: See page ! SAMPLE LOCATION: H-6.5 CYLINDER MARKED SET NO. REPORT OF TESTS MEASURED MAXIMUM SLUMP DATE AGE LOAD (inches) TESTED (days) (lbs. force) 4 1 4.75 04/16/1998 7 102230 4 2 4.75 04/16/1998 7 99230 Average 4 3 4.75 05/07/1998 28 4 4 4.75 05/07/1998 28 AC This report is exclusively for thc usc of thc client indicated above and shall not be reproduced except in full without the wri 01AK Page 4 of 5 8901 Carpenter Frwy. Suite #100 Dallas, Texas 75247 Report Date 04/17/1998 ~97 Business Center II ~' Rd. & Lakeshore Dr. Texas ~d field test and cast BATCHTIME: 10:15 am ,amon Elrod )NCRETE: 80 F r No: 640501 T WEIGHT (pcf): N/A CUMULATIVE YARDS: 350 UOMPRESSIVE STRENGTH (psi) 3620 3510 3570 TYPE ~n approval of HBC Engineering, Inc. CONCRETE COMPR SIVE STRENGTH Date of Service: 04/09/1998 Client No.: 52617000 Client: SLUMP: AIR: TEST METHOD: Services: Lincoln Property Company 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 Report No.: 9809332 Project No.: 43-2452 Project: Coppell Belt Lin Coppeli, Obtain samples of fresh concrete at the placement locations, perform requit compressive strength samples.** Butler Construction Pioneer Concrete 22 CONTRACTOR: CONCRETE SUPPLIER: PLANT: SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi ~ 28 Days 5" N/A ASTM C-143 ASTM C- 172 ASTM C-39 DATE TESTED 04/16/1998 04/16/1998 05/07/1998 05/07/1998 SAMPLE LOCATION: G.5-8.5 Started: 3:00 am (1) City of Coppell/Bldg. [nsp. (1) City of Coppell/Constr. Insp. MEASURED SLUMP (inches) CYLINDER MARKED SET NO. 5 I 5.00 5 2 5.00 5 3 5.00 5 4 5.00 Technician: Damon Elrod Report Distribution: (1) Lincoln PrOlgrty Company (1) Butler Construction (1) O'Brien & Associates (I) AECC, Inc. PROJECT DATA CONCRE~rE CLASS: 9349 PLACEMENT DATE: 04/09/1998 TtME SAMPLEO: 12:30 pm aY: [ WEATHER CO~DmONS: Sunny TEMPERATURE (F} - AIR 68 F C TRVCKNO: 867 TIC~ AIR CONTENT (%): N/A tm: PLACEMENT LOCATION: See page I REPORT OF TESTS MAXIMUM AGE LOAD (days) (lbs. force) 7 116230 7 115340 Avernge 28 28 This report is exclusively tbr thc usc of thc client indicated above and shall not bc reproduced except in full without AC 8901 Carpenter Frwy., Suite #100 Dallas, Texaa 75247 Report Date 04/17/1998 -97 Business Center II .~ Rd. & Lakcshore Dr. Texas ed field test and cast BATCHTIME: 12:25 pm ~amon Elrod DNCRETE: 80 F TNO: 640530 X WEIGHT (poi): N/A CUMULATIVE YARDS: 490 COMPRESSIVE STRENGTH (ini) 4110 4080 4100 Finished: 5:00 pm nI-~ Engine~nc~ Engineering, Inc. 01AK Page 5 of 5