Northlake 635(3)-LR 98042004/20/98 11:52 FAX 214530707~e~,
FAX TRANSMITTAL
DA TE:
TO:
FROM:
April 20, 1998
See Below
Coppell Business Center II
Jamie for Eugene Harbour
2146211370?0
IIBC ENGINEERING
Total Pages Including Cover:
Mr. Car. y Moon, Lincoln Property .Company
Brett w/Butler Construction
Mr. 'rom Albrigh_t., O'Brien & Associates
AECC, Inc.
Mr. I_~e Stone, City of..Coppell/Bldg. Insp.
TIME:
FAX NO.:
PHONE NO.:
OFFICE:
t
Mr. Larry Davis, Cit. y of Cop_pell/Constr. Insp_:.
tl~ 7~0-,
817 589-:
97t 788-
972 960-
97~ 304-
97~ 804-
if~rmation contaihed in this facsimile message is I~gally privileged and confidential in~
· use of the individual or entity named above. If the reader of this message is not the in
mployea or agent responsible to deliver it to the intended recipient, you are hereby notif
n, distribution or copying of this communication is strictly prohibited, ff you have receive
error, please immediately notify us by telephone and return the original message to us
· US Postal service. Thank you:.
001/002
;ee Below
{BC - Dallas
b828
7680
3570
marion intended only '
tended recipient, or
ed that any dissemi-
d this communica-
at the address below
HOUSTON
2313 W. Sam Houston Pkwy. N.
Suite i 07
Houston, Texas 77043
Phone: (713) 722-0700
Fax: (713) 722-0788
DALLAS
8901 Carpenter Freeway
Suite 100
Dallas, Texas 75247
Phone: (214) 630-1010
Fax: (214) 630-7070
AUSTIN
3913 Todd Lane
Suite 312
Austin, Texas 78744
Phone: (512) 442-1122
Fax: (512) 442-1181
ATLANTA
2470 Windy Hill Rd.
Sulm 300
Marietta, Oeorgia 30067
Phone: (770) 618-3055
Fax: (770) 618-3015
04/20/98 11:$2 FAX 2146307070 HBC ENGINEERING
CONCRETE COMPRESSIVE STRENGTH TEST
Date of Se]wice: 03/24/1998
Client No.: 52617000
Client: Lincoln Property Company
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Report No,: 9808036
Project No.: a3-2452-
Project: Coppell
Belt Lin,
Coppell,
Services: Obtain samples of fresh concrete at the placement locations, perform requir,
compressive strength samples.**
STRENGTH:
SLUMP:
Am:
TE~I' METI4OD:
¢OnX~nc-t'oa; Butler Construction .
CONCRETE SUPPLIER; Pioneer Concrete
PCAnT: 27
SPECIFICATION REQUIREMENTS
4000 psi ~ 28 Days
5"
3-6%
ASTM C- 143
ASTM C-172
ASTM C-39
PROJECT DATA
CONCaET~ CcASS: 9349
Pt~CZ~Wr OATZ: 03/26/I998
T~ESA~LED: 2:30 pm ~v; ~
~~ co~mo~S: Cloudy,
~~.Am 79 ~' c
,.- 'r~ucg~o: 486 T~C~
~CO~ (~): 2.5 ~
P~CE~ LOCA~ON:
Pmvlug, mGn ~pm~h b~n Buildin~ B
SAMPLE LOCATION;
(south) from main
REPORT OF TESTS
CYLINDER MEASURED MAX[M-LTM
MARI~O SLUMP D&TE AGI~ LOAD
"~E~ NO. (inches) TESTED (days) (lb-- force)
1 I 6,00 04/02/1998 7 82630
I 2 6.00 04/02/I998 7 80850
Average
1 3 6.00 04/2311998 28
1 4 6.00 04/23/1998 28
Al
Note: Mix 9351 is specified; Mix 9349 was used. Subcontractor not
content.
Technician: Brian Otis
Report Distribution:
(1) Lincoln Property Company
(l) Butler Consu'uction
(t) O'Brie~ & Associates
(I) AECC. !nc.
Start~l: 3:00 pm
(1) City of Coppell/BId$. lnsp.
( I ) City of CoppelllConslr. ln.lp.
ltinish¢& 5:00 pm
002/002
8901 Carpenter Fray. Suite #I00
DalI~, Texas 75247
Report Date
04/09/1998
)7
3usiness Center II
Rd. & Lakeshore Dr.
Texas
~'d field t~st and east
BATCH TIME: 2:20 pm
rian Otis
very windy
tNCRgTI,'-: 81 F
nO: 658798
rrw~Gtrr (ac0: N/A
CUMULATIVE YARDS; ~0
COM~RF.~IVI~
STRFaNGTH
292O
2860
2890
~ied of air
Thia ~pO~ iS exclusively tbr thc use of tl~c diem indicated abovc and shall not be r~pmduced except itt full wil~ouc thc
Vice Prcside~
niuen a0pmval of HBC Engin~rin~. Inc,
0IAK Page I of I
CONCRETE COMPR SIVE STRENGTH
Date of Service: 04/10/1998 Report No.:
Client No.: 52617000 Project No.:
Client: Lincoln Property Company Project:
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
980942~
43 -2452
Coppell
Belt Lin
Coppell,
Services: Obtain samples of fresh concrete at the placement locations, perform requil
compressive strength samples.**
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: ! 6
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi ~ 28 Days
5"
N/A
ASTM C- 143
ASTM C- 172
ASTM C-39
SAMPLE LOCATION: D.5-8.5
PROJECT DATA
CONCRETE CLASS: 9349
PLACEMENT DA'n;: 04/10/1998
TIME SAMPLED: 7:55 am BY:
WEATHER CONDITIONS: Sunny
TEMPERATURE (F} - AIR 66 F
TRUCK NO: 654 T~CIO
AIR CONTENT (%): N/A UN
PLACEMENT LOCATION:
Building D slab, D-F & 1-9
CYLINDER
MARKED
SET NO.
REPORT OF TESTS
MEASURED MAXIMUM
SLUMP DATE AGE LOAD
(inch.) TESTED (days) (Ibs.~rce)
1 1 5.00 04/17/1998 7 97990
1 2 5.00 04/17/1998 7 92730
Average
1 3 5.00 05/08/1998 28
I 4 5.00 05/08/1998 28
A(
01
This report is exclusively tbr the use of the client indicated above and shall not be reproduced except in full without the wr
Page I of 5
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
04/20/1998
.97
Business Center II
~ Rd. & Lakeshore Dr.
Texas
ed field test and east
BATCH TIME: 7:25 am
)amon Elrod
ONCRETE: 90 F
;T NO: 702257
IT WEIGHT (per): N/A
'CUMULATIVE YARDS:
COMPRESSIVE
STRENGTH
(psi)
3470
3280
3380
70
FRACTURE
TYPE
tten approval of HBC Engineering, Inc.
CONCRETE COMPRESSIVE STRENGTH TES£
Date of Service: 04/10/1998 Report No.:
Client No.: 52617000 Project No.:
Client: Lincoln Property Company Project:
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
980942:
43-245~
Coppell
Belt Lit
Coppell
Services: Obtain samples of fresh concrete at the placement locations, perform requi
compressive strength samples.**
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 16
SPECIFICATION REQUIREMENTS
STRENaTn: 4000 psi ~ 28 Days
5"
N/A
ASTM C- 143
ASTM C- 172
ASTM C-39
SAMPLE LOCATION: E.5-7.5
PROJECT DATA
CONCRETE CLASS: 9349
PLACEMENT DATE: 04/10/1998
TIME SAMPLED: 8:55 am BY:
WEATHER CONDITIONS: Sunny
TEMPERATURE (F) - AIR 67 F
TRUCK NO: 841 TICI4
AIR CONTENT (%): N/A US
PLACEMENT LOCATION:
See page I
CYLINDER
MARKED
SET NO.
REPORT OF TESTS
MEASURED MAXIMUM
SLUMP DATE AGE LOAD
(inches) TESTED (days) (lbs. force)
2 1 5.50 04/17/1998 7 91020
2 2 5.50 04/17/1998 7 95270
Average
2 3 5.50 05/08/1998 28
2 4 5.50 05/08/1998 28
A(
01
This report is exclusively tbr the use of the client indicated above and shall not be reproduced except in full without the w
Page 2 of 5
¸97
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
04/20/1998
Business Center II
e Rd. & Lakeshore Dr.
Texas
ed field test and cast
BATCHTIME: 8:33 am
)amon Elrod
ONCRETE: 96
:Y NO: 640609
IT WEIGHT (pct'): N/A
:CUMULATIVE YARDS:
COMPRESSIVE
STRENGTH
(psi)
3220
3370
3300
180
ttcn approval of HBC Engineering, Inc.
r-,
CONCRETE COMPR , SSIVE STRENGTH TEb f
Date of Service: 04/10/1998 Report No.: 980942:
Client No.: 52617000
Project No.: 43-245~ .97
ENGINEERING, INC.
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
04/20/1998
Client: Lincoln Property Company Project:
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Services:
SLUMP:
AIR:
TEST METHOD:
Coppell
Belt Li~
Coppell
Obtain samples of fresh concrete at the placement locations, perform requi
compressive strength samples.**
Butler Construction
Pioneer Concrete
16
CONTRACTOR:
CONCRETE SUPPLIER:
PLANT:
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi ~ 28 Days
5"
N/A
ASTM C-143
ASTM C- 172
ASTM C-39
SAMPLE LOCATION: E-6.5
Business Center II
te Rd. & Lakeshore Dr.
Texas
ed field test and cast
PROJECT DATA
CONCRETE CLASS: 9349
PLACEMENT DATE: 04/10/1998 BATCH TIME: N/A
TIME SAMPLED: 9:15 am BY: Ipamon Elrod
WEATHER CONDITIONS: Sunny
1
TEMPERATURE (F) - AIR 68 F (~ONCRETE: 96 F
TRUCK NO: 760 TICKI~T NO: 640612
AIR CONTENT (%): N/A
PLACEMENT LOCATION:
See page I
REPORT OF TESTS
CYLINDER MEASURED MAXIMUM
MARKED SLUMP DATE AGE LOAD
SET NO. (inches) TESTED (days) (lbs. force)
3 · 1 5.50 04/17/1998 7 86650
3 2 5.50 04/I 7/1998 7 88200
Average
Al
IT WEIGHT (pet): N/A
:CUMULATIVE YARDS: 220
COMPRESSIVE
STRENGTH
(psi)
3060
3120
3090
FRACTURE
TYPE
Iten approval of HBC Engineering, Inc.
3 3 5.50 05/08/1998 28
3 4 5.50 05/08/1998 28
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the ~
0t Page 3 of 5
'CONCRETE COMPI SIVE STRENGTH TED
Date of Service: 04/10/1998 Report No.: 98094Z
Client No.: 52617000
Project No.: 43-2452
Client: Lincoln Property Company Project:
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Coppell
Belt Lit
Coppell
Services: Obtain samples of fresh concrete at the placement locations, perform requi
compressive strength samples.**
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 16
SPECIFICATION REQUIREMENTS
STRENGTH:' 4000 psi ~ 28 Days
5"
N/A
ASTM C- 143
ASTM C-172
ASTM C-39
PROJECT DATA
CONCRETE CLASS: 9349
PLACEMEnt DATE: 04/10/1998
TIME SAMPLED: 9:55 am BY:
WEATHER CONDITIONS: Sunny
TEMPERATURE (F} - AIR 70 F
TRUCK NO: 728 TIC~
AIR CONTENT (%): N/A v~
PLACEMENT LOCATION:
See page 1
SAMPLE LOCATION: E.5-5
CYLINDER
MARKED
SET NO.
REPORT OF TESTS
MEASURED MAXIMUM
SLUMP DATE .AGE LOAD
(inches) TESTED (days) (lbs. force)
4 1 6.50 04/17/1998 7 82600
4 2 6.50 04/17/1998 7 85090
Average
4 3 6.50 05/08/1998 28
4 4 6.50 05/08/1998 28
Al
01
This report is exclusively tbr the use of the client indicated above and shall not be reproduced except in full without the ~
Page 4 of 5
ENGINEERII~, INC.
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
-97
Report Date
04/20/1998
Business Center II
e Rd. & Lakeshore Dr.
Texas
ed field test and cast
BATCH TIME: 9:43 am
)amon Elrod
iONCRETE: 100 F
;T NO: 702266
IT WEIGHT (pc0: N/A
~CUMULATIVE YARDS:
COMPRESSIVE
STRENGTH
(psi)
2920
3010
2970
380
FRACTURE
TYPE
ittcn approval of HBC Engineering, Inc.
CONCRETE COMPR r' SIVE STRENGTH
Date of Service:
Client No.:
Client:
Services:
04/10/1998 Report No.: 980942
52617000 Project No.: 43-245;
Lincoln Property Company
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Project:
Coppell
Belt Lit
Coppell
Obtain samples of fresh concrete at the placement locations, perform requi
compressive strength samples.**
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 16
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi ~ 28 Days
5"
N/A
ASTM C-143
ASTM C-172
ASTM C-39
PROJECT DATA
CONCRETE CLASS: 9349
PLACEMENT DATE: 04/10/1998
TIME SAMPLED: 10:05 am BY:
WEATHER CONDITIONS: Sunny
TEMPERATURE (F} - AIR 72 F
TRUCK NO: 853 TICI~
AIR CONTENT (%): N/A U~
PLACEMENT LOCATION:
See page I
SAMPLE LOCATION: D.5-2.5
CYLINDER MEASURED
MARKED SLUMP
SET NO. (inches)
5 1 5.50
5 2 5.50
5 3 5.50
5 4 5.50
REPORT OF TESTS
DATE
TESTED
04/17/1998
04/17/1998
05/08/1998
05/08/1998
MAXIMUM
AGE LOAD
(~lays) (lbs. force)
7 82830
7 80680
Average
28
28
A(
Technician: Damon Elrod
Report Distribution:
(1) Lincoln Property Company
(i) Butler Construction
(1) O'Brien & Associates
(1) AECC, Inc.
Started: 5:00 am
(1) City ofCoppell/BIdg. Insp.
(I) City of Coppell/Constr. lnsp.
Finished: 2:00 pm
OI
This report is exclusively tbr thc usc of thc client indicated above and shall not bc reproduced except in full without the wri
Page 5 of 5
.97
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
04/20/1998
Business Center II
~e Rd. & Lakeshore Dr.
Texas
ed field test and cast
BATCH TIME: 9:58 am
)amon Elrod
ONCRETE: 98 F
:T NO: 640632
IT WEIGHT (PC0: N/A
ICUMULATIVE YARDS: 470
COMPRESSIVE
STRENGTH
(psi)
2930
2850
2890
FRACTURE
TYPE
Xen approval of HBC Engineering, Inc.