Northlake 635(3)-LR 980421CONCRETE COMPRESSIVE STRENGTH TES'F
Date of Service:
Client No.:
Client:
Services:
04/13/1998 Report No.: 98095S
52617000 Project No.: 43-245
Lincoln Property Company
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Project:
Coppel
Belt Li
Coppel
Obtain samples of fresh concrete at the placement locations, perform requi
compressive strength samples.**
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: t6 (on site)
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi (~ 28 Days
5"
N/A
ASTM C- 143
ASTM C- 172
ASTM C-39
SAMPLE LOCATION: 5'E/10'N of D/8
PROJECT DATA
CONCRETE CLASS: 9349
PLACEMENT DATE: 04/13/199~
TIME SAMPLED: 8:15 am BY:
WEATHER CONDITIONS: Cool, cl
TEMPERATURE (F}-AIR 66 F t
TRUCK NO: 853 TICK
AIR CONTENT (%): N/A uT
PLACEMENT LOCATION:
Slab-on-grade, Building D from lines B to D
REPORT OF TESTS
CYLINDER MEASURED MAXIMUM
MARKED SLUMP DATE AGE LOAD
SET NO. (inches) TESTED (days) (lbs. force)
I I 7.00 04/20/1998 7 93570
! 2 7.00 04/20/1998 7 101180
Average
I 3 7.00 05/11/1998 28
! 4 7.00 05/11/1998 28
'this report is exclusively l~r the use of the client indicated above and shall not be reproduced except in full without the ~
01AK Page I of 6
ENGINEERING, INC.
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
7
~--97
Report Date
04/2 ! / 1998
Business Center II
te Rd. & Lakeshore Dr.
Texas
ed field test and east
BATCH TIME: 7:51 am
)el Ratliff
oudy, windy
2ONCRETE: 73 g
gT NO: 702278
lIT WEIGHT (pc0: N/A
and I to 9
2CUMULATIVE YARDS: 70
COMPRESSIVE
STRENGTH
(psi)
3310
3580
3450
FRACTURE
TYPE
itten approval of HBC Engineering, Inc.
CONCRETE COMPRESSIVE STRENGTH TEb f
Date of Service: 04/13/1998 Report No.: 980959
Client No.: 52617000 Project No.: 43-245~
Client: Lincoln Property Company Project: Coppell
3300 Lincoln Plaza/Larry Moon Belt Li~
500 North Akard Street
Dallas TX 75201-3394 Coppell
Services:
Obtain samples of fresh concrete at the placement locations, perform requi
compressive strength samples.**
SLUMP:
AIR:
TEST M ETItOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 16 (on site)
SPECIFICATION REQUIREMENTS
STRENGTlt: 4000 psi ~ 28 Days
5"
N/A
ASTM C- 143
ASTM C- 172
ASTM C-39
SAMPLE LOCATION: 5'N/5'E of D/7
CYLINDER
MARKED
SET NO.
PROJECT DATA
CONCRETE CLASS: 9349
PLACEMENT DATE: 04/13/1998
TIME SAMPLED: 9:25 am BY:
WEATHER CONDITIONS: Cool, p:
TEMPERATURE (F)- AIR 70 g (
TRUCK NO: 853 TICKI
AIR CONTENT (%): N/A U~
PLACEMENT LOCATION:
See page !
REPORT OF TESTS
MEASURED MAXIMUM
SLUMP DATE .AGE LOAD
(inches) TESTED (days) (lbs. force)
2 ! 5.00 04/20/1998 7 108350
2 2 5.00 04/20/1998 7 104800
Average
2 3 5.00 05/11/1998 28
2 4 5.00 05/I !/1998 28
A(
This report is exclusively tbr thc use of the client indicated above and shall not be reproduced except in full without thc w
tlIAK Page 2 of 6
ENGINEERING, INC.
8901 Carpeuter Frwy., Suite #100
Dallas, Texas 75247
Report Date
04/21/1998
-97
Business Center II
~e Rd. & Lakeshore Dr.
Texas
'ed field test and cast
BATCH TIME: 9:12 am
)el Ratliff
rtly cloudy, windy
'ONCRETE: 77 ~'
;T NO: 702287
IT WEIGHT (pc0: N/A
:CUMULATIVE YARDS:
COMPRESSIVE
STRENGTH
(psi)
3830
3710
3770
160
FRACTURE
TYPE
tten approval of HBc Engineering, lac.
CONCRETE COMPR JsSIVE STRENGTH TES£
Date of Service:
Client No.:
Client:
Services:
04/13/1998 Report No.: 980959'
526! 7000 Project No.: 43-245~
Lincoln Property Co,npany
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Project:
Coppell
Belt Lit
Coppell
Obtain samples of fresh concrete at the placement locations, perform requi
compressive strength samples.**
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 16 (on site)
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi ~ 28 Days
5"
N/A
ASTM C- ! 43
ASTM C- 172
ASTM C-39
SAMPLE LOCATION: D-5.75
CYLINDER
MARKED
SET NO.
PROJECT DATA
CONCRETE CLASS: 9349
PLACEMENT DATE: 04/13/1998
TIME SAMPLED: 10:55 am BY:
WEATHER CONDITIONS: Clear,
TEMPERATURE (F) - AIR
TRUCK NO: 853
AIR CONTENT (%): N/A
PLACEMENT LOCATION:
Sec page I
75
REPORT OF TESTS
MEASURED MAXIMUM
SLUMP DATE AGE LOAD
(inches) TESTED (days) (lbs. force)
3 I 5.00 04/20/1998 7 121660
3 2 5.00 04/20/1998 7 121020
Average
3 3 5.00 05/11/1998 28
3 4 5.00 05/11/1998 28
This report is exclt,sively tbr the use of the client iqdicatcd above and shall not be r~produced except in full without the wri
ENGINEERING, INC.
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
04/21/1998
97
Business Center II
e Rd. & Lakeshore Dr.
Texas
ed field test and cast
BATCH TIME: ! 0:42 am
)el Ratliff
F £ ONCRETE: 78 F
TICKI:T NO: 702297
UN IT WEIGHT (OCt): N/A
A( CUMULATIVE YARDS: 260
COMPRESSIVE
STRENGTH
(psi)
4300
4280
4290
FRACTURE
TYPE
ten approval of HBC Engineering, Inc.
01AK Page 3 of 6
· ' t""
CONCRETE COMPRESSIVE STRENGTH TE S'F
Date of Service:
Client No.:
Client:
Services:
04/I 3/! 998 Report No.: 98095;
52617000
Project No.: 43-245
Lincoln Property Company
3300 Lincoln Plaza/Larry Moon
500 No~th Akard Street
Dallas TX 75201-3394
Project: Coppel
Belt Li
Coppel
Obtain samples of fresh concrete at the placement locations, perform requi
compressive strength samples.**
SLUMP:
AIR:
TEST METltOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLAST: 16 (on site)
SPECIFICATION REQUIREMENTS
STRENGTlt: 4000 psi ~ 28 Days
5"
N/A
ASTM C- 143
ASTM C- 172
ASTM C-39
SAMPLE LOCATION: D-4.75
CYLINDER
MARKED
SET NO.
PROJECT DATA
CONCRETE CLASS: 9349
PLACEMENT DATE: 04/13/1998
TIME SAMPLED: 12:00 pm BY:
WEATHER CONDITIONS: Clear,
TEMPERATURE (F) - AIR 80 F
TRUCK NO: 756 TICR
AIR CONTENT (%): N/A ur
PLACEMENT LOCATION:
See page I
REPORT OF TESTS
MEASURED MAXIMUM
SLUMP DATE AGE LOAD
(inches) TESTED (days) (lbs. force)
4 ! 4.75 04/20/1998 7 122950
4 2 4.75 04/20/1998 7 126480
Average
4 3 4.75 05/1 I/t998 28
4 4 4.75 05/11/1998 28
AC
This report is exclusively tbr the use of the client indicated above and shall not be reproduced except in full without the w~
01AK Page4 of 6
IBC
ENGINEERING, INC.
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
7
2-97
Report Date
04/21/1998
Business Center II
te Rd. & Lakeshore Dr.
Texas
ed field test and cast
BATCH TIME: I 1:40 am
2)el Ratliff
'arm
:ONCRETE: 80 F
;TNO: 702304
IT WEIGHT (pcl): N/A
:CUMULATIVE YARDS: 330
COMPRESSIVE
STRENGTH
(psi)
4350
4470
4410
FRACTURE
TYPE
:ten approval of HBC Engineering, Inc.
cONCRETE COMPI SSIVE STRENGTH TE. F
Date of Service:
Client No.:
Client:
Services:
04/13/I 998
52617000
Lincoln Property Company
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Report No.: 98095
Project No.: 43-24
Project: Copp~
Belt Li
Coppel
Obtain samples of fresh concrete at tile placement locations, perform requ
compressive strength samples.**
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 16 (on site)
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi ~ 28 Days
SLUMP: 5"
AIR: N/A
TEST METHOD: ASTM C~ 143
ASTM C- 172
ASTM C-39
SAMPLE LOCATION: D-3.75
PROJECT DATA
CONCRETE CLASS: 9349
PLACEMENT DATE: 04/13/1991
TIME SAMPLED: 1 .' 10 pm BY:
WEATHER CONDITIONS: Clear,
TEMPERATURE (F) - AiR 85 F
TRUCK NO: 756 TICI
AIR CONTENT (%): N/A ur
PLACEMENT LOCATION:
See page I
REPORT OF TESTS
CYLINDER MEASURED
MARKED SLUMP DATE
SET NO. (inches) TESTED
5 1 4.50 04/20/1998
5 2 4.50 04/20/1998
MAXIMUM
AGE LOAD
(days) (lbs. force)
5 3 4.50 05/11/1998 28
5 4 4.50 05/1 i/1998 28
7 122420
7 126230
Average
01AK
This report is exclusively for the use of thc client indicated above and shall not bc reproduced except in full xvithout the wr
Page 5 of 6
)7
2-97
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
04/21/1998
Business Center II
te Rd. & Lakeshore Dr.
I, Texas
ired field test and cast
BATCH TIME: 12:55 pm
Del Ratliff
talTll
2ONCRETE: 79 F
ST NO: 702314
~lT WEIGHT (PCO: N/A
:CUMULATIVE YARDS: 430
COMPRESSIVE
STRENGTH
{psi)
4330
4460
4400
FRACTURE
TYPE
ten approval of HBC Engineering, Inc.
CONCRETE
COMPI SIVE STRENGTH TE , £
Date of Service: 04/13/1998
Client No.: 52617000
Client:
Services:
Report No.: 980959
Project No.: 43-245:
Lincoln Property Company
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Project:
Coppel
Belt
Coppelt
Obtain samples of fresh concrete at the placement locations, perform requi
compressive strength samples.**
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 16 (on site)
SPECIFICATION REQUIREMENTS
STRENGTIt: 4000 psi ~ 28 Days
PROJECT DATA
CONCRETE CLASS: 9349
PLACEMENT DATE: 04/13/1991
TIME SAMPLED: 3:00 pm BY:
WEATHER CONDITIONS: Clear,
TEMPERATURE (F) - AiR 85
kl3C
ENGINEERING, INC.
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
7 Report Date
04/21/1998
!-97
Business Center II
~e Rd. & Lakeshore Dr.
Texas
ed field test and cast
BATCHTIME: 2:15 pm
)el Ratliff
arm
F CONCRETE: 78 F
SLUMI':
AIR:
TEST METHOD:
SAMPLE LOCATION:
N/A
ASTM C- 143
ASTM C- 172
ASTM C-39
C.75-1.75
CYLINDER
MARKED
SET NO.
6
6 2
6 3
6 4
Additional
MEASURED
SLUMP DATE
(inches) TESTED
5.25 04/20/1998
5.25 04/20/1998
5.25 05/1 !/1998
5.25 05/11/1998
technician: Eddie Elrod
Technician: Del Ratliff
Report Distribution:
(I } Lincolu Property Company
(I) Butler Construction
(l) O'Bricn & Associates
(1) AECC. Inc.
TRUCK NO: 752 TICK[
AIR CONTENT (%): N/A UN
PLACEMENT LOCATION:
See page I
REPORT OF TESTS
MAXIMUM
AGE LOAD
(d'ays) (lbs. force)
7 115160
7 112880
Average
28
28
10:00 am to 3:30 pm
Started: 6:00 am
City ofCoppell/BIdg, lnsp.
City ofCoppell/Constr, lnsp.
AC
Finished: 10:00
This report is exclusively Ibr the nsc of the client indicated above and shall not be reproduced except in full without thc writ~
TNO: 702321
iT WEIGHT (pet): N/A
2UMULATIVE YARDS: 500
2OMPRESSIVE
STRENGTH
(psi)
4070
3990
4030
FRACTURE
TYPE
Engin~c.
E agene Harbour
Vice President
approval of HBC Enginecriag, lac.
01AK Page 6 of 6
CONCRETE COMPR SI STRENGTH
Date of Service: 03/23/1998
Client No.: 52617000
Report No.: 980790
Project No.: 43-245:
-97
8901 Carpenter Frwy, Suite #100
Dallas, Texas 75247
Report Date
04/21/1998
Client:
Services:
SLUMP:
AIR:
TEST METHOD:
Lincoln Property Company
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Project: Coppeil
Belt Lin
Coppell
Obtain samples of fresh concrete at the placement locations, perform requil
compressive strength samples.**
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLA~: 22
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi ~ 28 Days
6"
N/A
ASTM C- 143
ASTM C- 172
ASTM C-39
A-2.1, A-2, A-3
SAMPLE LOCATION:
PROJECT DATA
CONCRET~ CLASS: 9349
PLACEMENT DATE: 03/23/1998
TIME SAMPLED: 11:23 am BY: F
WEATHER CONDrrIoNS: Clear, m
TEMPERATURE (F) - AIR 70 F c
TRUCK NO: 3 73 TICKI~
AIR CONTENT (%): N/A t~
PLACEMENT LOCATION:
Piers, Building D
CYLINDER
MARKED
SET NO.
REPORT OF TESTS
MEASURED MAXIMUM
SLUMP DATE AGE LOAD
(inches) TESTED (days) 0b~. force)
1 1 6.50 03/30/1998
1 2 6.50 03/30/1998
1 3 6.50 04/20/1998
1 4 6.50 04/20/1998
Note: Concrete placed in piers was
Technician time on report 9807902.
T~chnician: Brian Otis
Report Distribution:
(1) Lincoln Prol~rty Company
(I) Butler Constm~ion
(!) O'Brien & Associates
(I) AECC, Inc.
7 115140
7 114280
Average
28 143220
28 145930
Average
taken
AC
Business Center II
e Rd. & Lakeshore Dr.
Texas
ed field test and cast
BATCH TIME: 10:45 am
.rian Otis
ild
~)NCRETE: 75 F
T NO: 645363
T WElaWr (pc0: N/A
L'UMULATIVE YARDS:
COMPRESSIVE
STRENGTH
(psi)
4070
4040
4060
5060
5160
5110
10
TYPE
Started:
(1) City ofCoppell/Bldg. Insp.
(I) City ofCoppell/Constr, lnsp.
from slab placement on Bui .ding C.
Finished: ~~ Inc.
This report is exclusively for the use of thc client indicated above and shall not be reproduced except in full without the wr
iugene Harbour
Vice President
approval ofHBC Engine~rinL Inc.
01AK Page 1 of I
CONCRETE COMPR . SSIVE STRENGTH
Date of Service:
Client No.:
Client:
Services:
03/23/1998
52617000
Lincoln Property Company
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Report No.: 980790
Project No.: 43-245:
Project: Coppell
Belt Lil
Coppel]
Obtain samples of fresh concrete at the placement locations, perform requi
compressive strength samples.**
SLUMP:
AIR:
TEST METHOD:
COnTaACrOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
rL~vr: 19
SPECIFICATION REQUIREMENTS
STRENaTH: 4000 psi ~ 28 Days
5"
N/A
ASTM C- 143
ASTM C- 172
ASTM C-39
PROJECT DATA
CONCm~TE CLASS: 9349
PLACEMENT DATE: 03/23/1998
TIME SAMPLED: 8:55 alTl BY:
WEATHER conomoNs: Partly
TEMPERATURE (F} - Am 60 F ~
TRUCKNO: 1823 TICK
AIR CONTENT (%): N/A t~
PLACEMENT LOCATION:
Slab, west end, Building C, A-H & 3-5
SAMPLE LOCATION: A/4
REPORT OF TESTS
CYLINDER MEASURED MAXIMUM
MARKED SLUMP DATE AGE LOAD
SET NO. (inches) TESTED (day~) (lbs. force)
1 1 5.00 03/30/1998 7 106230
1 2 5.00 03/30/1998 7 108020
Average
1 3 5.00 04/20/1998 28 133410
I 4 5.00 04/20/1998 28 137450
Average
This report is exclusively for thc usc of thc client indicated abovc and shall not be reproduced except in full without thc
01AK Page I of 6
ENGINEERII~, 1NC.
8901 Carpenter Frwy. Suite #100
Dallas, Texas 75247
Report Date
04/21/1998
.97
Business Center II
te Rd. & Lakeshore Dr.
Texas
field test and cast
BATCHTIME: 7:55 am
)amon Elrod
[oudy, sunny
:ONCRETE: 64 F
~TNO: 630184
rr WEIaHT (pc0: N/A
A~ ~CUMULATlVE YARDS:
COMPRESSIVE
STRENGTH
(p~)
3760
3820
3790
4720
4860
4790
30
FRAC~3~
TYPE
itt~n approval of HBC Engineering In~.
Date of Service:
Client No.:
Client:
03/23/1998
52617000
Lincoln Property Company
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Report No.: 9807901
Project No.: 43-2452
Project: Coppell
Belt Li~
Coppell
Services: Obtain samples of fresh concrete at the placement locations, perform requi:
compressive strength samples.**
SLUMP:
AIR:
TEST METHOD:
CONTaACrOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLAwr: 19
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi ~ 28 Days
5"
N/A
ASTM C-143
ASTM C-172
ASTM C-39
SAMPLE LOCATION: C.5/4.5
CYLINDER
MARKED
SET NO.
PROJECT DATA
CONCm~TE CLASS: 9349
PLACEMENT DATE: 03/23/1998
TIME SAMPLED: 10:12 am BY:
WEATHER CONDmONS: Partly
TEMPERATURE (F)- AIR 61 F
TgUCKNO: 410 TICg~
Am CON~NT (%): N/A
PLACEMENT LOCATION:
See page I
REPORT OF TESTS
MEASURED MAXIMUM
SLUMP DATE AGE LOAD
(inches) TESTED (days) (lbs. force)
2 1 5.25 03/30/1998 7 100940
2 2 5.25 03/30/1998 7 106220
Average
2 3 5.25 04/20/1998 28 125710
2 4 5.25 04/20/1998 28 130980
Average
Note: Potter Concrete
controlled water.
A~
This report is exclusively for the use of thc client indicated above and shall not be reproduced except in full without the ~
01AK Page 2 of 6
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
.97
Report Date
04/2 1/1998
Business Center II
e Rd. & Lakeshore Dr.
Texas
ed field test and cast
BATCH TIME: 9:30 am
)amon Elrod
oudy, sunny
'.ONCRETE: 70 F
~no: 65346
IT WEIGHT (pe0: N/A
.~CUMULATIVE YARDS: 130
COMPRESSIVE
STRENGTH
(psi)
3570
3760
3670
4450
4630
454O
TYPE
itten approval ofHBC Engin~dn& Inc.
CONCRETE COMPRESSIVE STRENGTH TEST
Date of Service:
Client No.:
Client:
Services:
03/23/1998 Report No.: 980790]
52617000 Project No.: 43-2452
Lincoln Property Company
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Project:
Coppeli
Belt Lin
Coppell
Obtain samples of fresh concrete at the placement locations, perform requiJ
compressive strength samples.**
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
Pt~.NT: 19
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi ~ 28 Days
5"
N/A
ASTM C-143
ASTM C- 172
ASTM C-39
PROJECT DATA
CONCRETE CLASS: 9349
PLACEMENT DATE: 03/23/1998
TIME SAMPLED: 11:15 am BY:
WEATHER CONDITIONS: Sunny,
TEMPERATURE (F) - AIR 70 F
TRUCK NO: 802 TICK~
AIR CONTENT (%): N/A t~
PLACEMENT LOCATION:
See page I
SAMPLE LOCATION: D.5/3.5
CYLINDER
MARKED
SET NO.
REPORT OF TESTS
MEASURED MAXIMUM
SLUMP DATE AGE LOAD
(inches) TESTED (days) (lbs. force)
3 1 6.00 03/30/1998 7 115950
3 2 6.00 03/30/1998 7 115110
Average
3 3 6.00 04/20/1998 28 139190
3 4 6.00 04/20/1998 28 135190
Average
Note: Potter Concrete
controlled water.
A(
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the wri
01AK Page 3 of 6
8901 Carpenter Frwy., Suite #I00
Dallas, Texas 75247
Report Date
04/21/1998
-97
Business Center II
e Rd. & Lakeshore Dr.
Texas
ed field test and cast
BATCH'lIME: 10:55 am
~amon Elrod
artly cloudy
DNCRETE: 70 F
NO: 645364
WEIGHT (PC0: N/A
CUMULATIVEYARDS: 230
COMPRESSIVE
STRENGTH
(~)
4100
4070
4090
4920
4780
4850
TYPE
~n approval of HBC Engineering, Inc.
CONCRETE COMPRESSIVE STRENGTH TESf
Date of Service: 03/23/1998
Client No.: 52617000
Client: Lincoln Property Company
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Report No.: 9807901
Project No.: 43-2452
Project: Coppell
Belt Lin.
Coppell,
Services: Obtain samples of fresh concrete at the placement locations, perform requir
compressive strength samples.**
SLUMP:
AIR:
TEST METHOD:
COn~aACrOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 19
SPECIEICATION REQUIREMENTS
STREN(;TH: 4000 psi ~ 28 Days
5"
N/A
ASTM C- 143
ASTM C- 172
ASTM C-39
SAMPLE LOCATION: F.5/4
PROJECT DATA
concR~r~ CL4~S: 9349
PLACEMENT DATE: 03/23/1998
TIME SAMPLED: 1:25 pm sv: E
WEATHER CONDITIONS: Sunny tc
TEMPEI~TURE (F) - AIR 74 F C
TRUCK NO: 729 T~CK~
AIR CONTENT (%): N/A
PLACEMENT LOCATION:
Scc page I
CYLINDER MEASURED
MARKED SLUMP DATE
SET NO. (inches) TESTED
4 1 5.25 03/30/1998
4 2 5.25 03/30/1998
4 3 5.25 04/20/1998
4 4 5.25 04/20/1998
Note: Potter Concrete
REPORT OF TESTS
MAXIMUM
AGE LOAD
(days) (lbs, force)
7 112190
7 113670
Average
28 147450
28 151610
Average
controlled water.
AC
This report is exclusively for thc usc of thc client indicated above and shall not bc reproduced except in full without thc wri
01AK Page 4 of 6
.97
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
04/21/1998
Business Center II
~ Rd. & Lakeshore Dr.
Texas
ed field test and cast
BATCHTIME: 12:40 pm
,amon Elrod
partly cloudy
}NCRETE: 78 v
T NO: 645394
T WEICriT (pc0: N/A
CUMULATIVE YARDS: 330
COMPRESSIVE
STRENGTH
(psi)
3970
4020
4000
5210
5360
5290
TYPE
gn npproval of HBC Engineering, Inc.
CONCRETE COMPRESSIVE STRENGTH
Date of Service:
Client No.:
Client:
03/23/1998
52617000
Lincoln Property Company
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Report No.: 980790
Project No.: 43-245:
Project: Coppell
Belt Li~
Coppell
Services: Obtain samples of fresh concrete at the placement locations, perform requi
compressive strength samples.**
SLUMP:
AIR:
TEST METHOD:
cowrRAc~om Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 19
SPECIFICATION REQUIREMENTS
STRENCTI~: . 4000 psi ~ 28 Days
5"
N/A
ASTM C- 143
ASTM C- 172
ASTM C-39
SAMPLE LOCATION: G.5/5
PROJECT DATA
CON~ CLASS: 9349
PLACEMEWr DATE: 03/23/1998
TIME SAMPLED: 3:15 pm ~v:
WEATHER COtmmONS: Partly
TEMPERATURE (F}- AIR 76 F ~
X~UCKNO: 802 TICK
Am CON'rENT (%): N/A ~
PLACEMENT LOCATION:
See pa~e 1
REPORT OF TESTS
CYLINDER MEASURED MAXIMUM
MARKED SLUMP DATE AGE LOAD
SET NO. (inches) TESTED (days) (lbs. force)
5 1 5.50 03/30/1998 7 106340
5 2 5.50 03/30/1998 7 105530
Average
5 3 5.50 04/20/1998 28 132830
5 4 5.50 04/20/1998 28 136180
Average
Note: Potter Concrete
controlled water.
A~
This report is cxclusivcly for thc usc of thc client indicated above and shall not be reproduced ~xc~pt in full without th~ v
01AK Page 5 of 6
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
-97
Report Date
04/21/1998
Business 'Center II
,e Rd. & Lakeshore Dr.
Texas
field test and cast
BATCHTIME: 2:40 pm
)amon Elrod
Loudy, sunny
:ONCRETE: 80 F
~TnO: 645416
'rr WEiG~rr (pc0: N/A
2CUMULATIVE YARDS: 430
COMPRE~iVE
STRENGTH
(l~)
3760
3730
3750
4700
4820
4760
ittcn npprovnl ofHBC Engine~flng, Inc.
'CONCRETE COMPRESSIVE STRENGTH TEb a
Date of Service: 03/23/1998
Client No.: 52617000
Client: Lincoln Property Company
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Report No.: 980790]
Project No.: 43-2452
Project: Coppell
Belt Lin
Coppell
Services: Obtain samples of fresh concrete at the placement locations, perform requ,
compressive strength samples.**
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 19
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi ~ 28 Days
5"
N/A
ASTM C- 143
ASTM C- 172
ASTM C-39
PROJECT DATA
CONCRETE CLASS: 9349
PLACEMENT DAn: 03/23/1998
TIME SAMPLED: 6:20 pm BY:
WEATHER C0NDmONS: Partly
TEMPERATURE (F) - Am 81
TRUCK NO: 1804
AIR CONTENT (%): N/A
PLACEMENT LOCATION:
See page I
SAMPLE LOCATION: P.5/2.5
REPORT OF TESTS'
CYLINDER MEASURED MAXIMUM
MARKED SLUMP DATE AGE LOAD
SET NO. (inches) TESTED (days) (lbs. force)
6 1 5.50 03/30/1998 7 122770
6 2 5.50 03/30/1998 7 129910
Average
6 3 5.50 04/20/1998 28 144450
6 4 5.50 04/20/1998 28 143130
Average
Note: Potter Concrete ordered 50 yds. more of concrete.
Technician: Damon Elrod
Report Distribution:
(!) Lincoln Pmpelty Company
(1) Butler Construction
(I) O'Brien & Associates
(I) AECC, Inc.
Started: 7:00 am
(I} City of Coppcll/BIdg. Imp.
(I} City of Coppell/Constr. Imp.
Finished: 7:00 pm I'~
This rcport is cxclusivcly for thc usc of the client indicated above and shall not bc reproduced except in full without thc wr
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
04/21/1998
-97
Business Center II
e Rd. & Lakeshore Dr.
Texas
ed field test and cast
BATCH TIME: 5:15 pm
iamon Elrod
:~udy, sunny
F CONCRETE: 80 F
TICK[ T NO: 635280
tm; WEIGHT (Pc0: N/A
AC CUMULATIVE YARDS: 530
COMPRESSIVE
STRENGTH FRACTURE
(psi) TYPE
4340
4590
4470
5110
5060
5090
- Eng~~lie.
~.ugene'~I-Iarbour
Vice President
ten approval of HBC Engineering, Inc.
01AK Page 6 of 6
CONCRETE COMPR SIVE STRENGTH
Date of Service: 04/13/1998 Report No.:
Client No.: 52617000 Project No.:
Client: Lincoln Property Company Project:
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
980959~
43-2452
Coppell
Belt Lin
Coppell,
Services: Obtain samples of fresh concrete at the placement locations, perform rcqui~
compressive strength samples.**
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 16 (on site)
SPECIFICATION REQUIREMENTS
STRENCTH: 4000 psi ~ 28 Days
5"
N/A
ASTM C-143
ASTM C- 172
ASTM C-39
SAMPLE LOCATION: 5'E/10~N of D/8
PROJECT DATA
CONCRETE CLASS:
PLACEMENT DATE:
TIME SAMPLED:
WEATHER CONDYHONS:
TEMPERATURE (F) - AIR
TRUC~:NO: 853
AIR CONTENT (%): N/A
PLACEMENT LOCATION:
9349
04/13/1998
BY: [
Cool, ch
66 ~ c
TICKI
Slab-on-grade, Building D from lines B to D I
CYLINDER
MARKED
SET NO.
REPORT OF TESTS
MEASURED MAXIMUM
SLUMP DATE .AGE LOAD
(inches) TESTED (days) (lbs. force)
1 1 7.00 04/20/1998 7 93570
1 2 7.00 04/20/1998 7 101180
Average
1 3 7.00 05/11/1998 28
I 4 7.00 05/11/1998 28
AC
This report is exclusively for thc usc of thc client indicated above and shall not bc reproduced except in full without the w
01AK Page I of 6
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
¸97
Report Date
04/21/1998
Business Center II
~ Rd. & Lakeshore Dr.
Texas
ed field test and cast
BATCH TIME: 7:51 am
}el Ratliff
,udy, windy
ONCRETE: 73 F
;TNO: 702278
rr WEIOWr (OEO: N/A
nd I to9
'CUMULATIVE YARDS:
COMPRESSIVE
STRENGTH
(ps~)
3310
3580
3450
70
ittcn approval of HBC Engineering, Inc.
CONCRETE COMPR , SIVE STRENGTH TE f
Date of Service: 04/13/1998 Report No.: 980959~
Client No.: 52617000
Project No.: 43-2452
Client: Lincoln Property Company Project:
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Coppell
Belt Lin
Coppell:
Services: Obtain samples of fresh concrete at the placement locations, perform requi~
compressive strength samples.**
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
pLANT: 16 (on site)
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi ~ 28 Days
5"
N/A
ASTM C-143
ASTM C- 172
ASTM C-39
PROJECT DATA
CONCRZTE CLASS: 9349
PLACEMENT DATE: 04/13/1998
TIME SAMPLED: 9:25 am BY:
WEATHER CONDITIONS: Cool, p
TEMPERATURE (F) - AIR 70 V C
TRUCK NO: 853 TICK!
AIR CONTENT (%): N/A t~
PLACEMENT LOCATION:
Sec pngc I
SAMPLE LOCATION: 5'N/5'E olD/7
REPORT OF TESTS
CYLINDER MEASURED MAXIMUM
MARKED SLUMP DATE AGE LOAD
SET NO. (inches) TESTED (days) (Ib~. force)
2 1 5.00 04/20/1998 7 108350
2 2 5.00 04/20/1998 7 104800
Average
2 3 5.00 05/11/1998 28
2 4 5.00 05/11/1998 28
A(
This report is exclusively for thc use ofthe client indicated above and shall not be reproduced except in full without the s
01AK Page 2 of 6
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Ret/ort Date
04/21/1998
-97
Business Center II
.' Rd. & Lakeshore Dr.
Texas
ed field test and cast
BATCHTIME: 9:12 am
mi Ratliff
rtly cloudy, windy
ONCl~rr: 77 v
.who: 702287
IT WEIGHT (pc0: N/A
,'CUMULATIVE YARDS:
COMPRESSIVE
STRENGTH
(p~i)
3830
3710
3770
160
itten approval of HBC Engineering, Inc.
'CONCRETE COMPR SI STRENGTH
Date of Service: 04/13/1998 Report No.:
Client No.: 52617000 Project No.:
Client: Lincoln Property Company Project:
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
980959~
43-2452
Coppell
Belt Lin
CoppelL
Services: Obtain samples of fresh concrete at the placement locations, perform requil
compressive strength samples.**
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLAI~r: 16 (on site)
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi ~ 28 Days
5"
N/A
ASTM C-143
ASTM C- 172
ASTM C-39
PROJECT DATA
CONCRETE CLASS: 9349
PLACEMENT DATE: 04/13/1998
TIME SAMPLED: 10:55 am BY:
WEATHER CONDITIONS: Clear,
TEMPERATURE (F) - AIR 75
TRUCK NO: 853
AIR CONTENT {%}: N/A
PLACEMENT LOCATION:
Sec page 1
SAMPLE LOCATION: D-5.75
CYLINDER
MARKED
SET NO.
REPORT OF TESTS
MEASURED MAXIMUM
SLUMP DATE AGE LOAD
(inches) TESTED (days) (lbs. force)
3 1 5.00 04/20/1998 7 121660
3 2 5.00 04/20/1998 7 121020
Average
3 3 5.00 05/11/1998 28
3 4 5.00 05/11/1998 28
This report is exclusively for thc usc of thc client indicated above and shall not bc reproduced except in full without the wfi
01AK Page 3 of 6
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
04/21/1998
97
Business Center II
~ Rd. & Lakeshore Dr.
Texas
ed field test and cast
BATCHTIME: 10:42 am
~el Ratliff
F · C 0NCRETE: 78 F
TICKI~T NO: 702297
On ~r wEiorrr (pc0: N/A
AC CUMULATIVE YARDS: 260
COMPRESSIVE
STRENGTH
(psi)
4300
4280
4290
TYPE
tten approval of HBC Engineering, Inc.
CONCRETE COMPRESSIVE STRENGTH TEb £
Date of Service: 04/13/1998 Report No.:
Client No.: 52617000 Project No.:
Client: Lincoln Property Company Project:
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
980959~
43-2452
Coppell
Belt Lin
CoppelL
Services: Obtain samples of fresh concrete at the placement locations, perform rexluil
compressive strength samples.**
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 16 (on site)
SPECIFICATION REQUIREMENTS
S~ENG'rm 4000 psi ~ 28 Days
5"
N/A
ASTM C- 143
ASTM C- 172
ASTM C-39
PROJECT DATA
COncRETE CLASS: 9349
PLACEMENT DATE: 04/13/1998
TIME SAMPLED: 12:00 pm BY:
WEATHER CONDITIONS: Clear,
TESn'E~O. TURE (~)- Am 80
TRUCK NO: 756
AIR CONTENT (%): N/A
PLACEMENT LOCATION:
See page 1
SAMPLE LOCATION: D-4.75
REPORT OF TESTS
CYLINDER MEASURED MAXIMUM
MARKED SLUMP DATE AGE LOAD
SET NO. (inches) TESTED (days) Obs. force)
4 1 4.75 04/20/1998 7 122950
4 2 4.75 04/20/1998 7 126480
Average
4 3 4.75 05/11/1998 28
4 4 4.75 05/11/1998 28
This report is exclusively for the use of the client indicatcd above and shall not be reproduced except in full without the ~
01AK Page 4 of 6
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
04/21/1998
,97
Business Center II
~ Rd. & Lakeshore Dr.
Texas
ed field test and cast
BATCH TIME: 11:40 am
}el Ratliff
F CONCRETE: 80 F
TICKI;T NO: 702304
UN rV WEIGHT (pc0: N/A
A( :CUMULATIVE YARDS: 330
COMPRESSIVE
STRENGTH
(psi)
4350
4470
4410
FRACTURE
TYPE
then approval of HBC Engineering, inc.
CONCRETE COMPILff' SIVE STRENGTH TE , c
Date of Service:
Client No.:
Client:
04/13/1998
52617000
Lincoln Property Company
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Report No.: 980959]
Project No.: 43-2452
Project: Coppell
Belt Lin
Coppeli,
Services: Obtain samples of fresh concrete at the placement locations, perform requit
compressive strength samples.**
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 16 (on site)
SPECIFICATION REQUIREMENTS
S~ENCTH: 4000 psi ~ 28 Days
5"
N/A
ASTM C- 143
ASTM C- 172
ASTM C-39
PROJECT DATA
CONCRE~ CLASS: 9349
PLACEMENT OA~: 04/13/1998
TIME SAMPLED: 1:10 pm BY: 1]
WEATHER CONDITIONS: Clear, w
TEMPERATURE Cb') - AIR 85 F C
TRUCK NO: 756 TICK~
AIR CONTENT (%): N/A UN
PLACEMENT LOCATION:
See page 1
SAMPLE LOCATION: D-3.75
CYLINDER
MARKED
SET NO.
REPORT OF TESTS
MEASURED MAXIMUM
SLUMP DATE .AGE LOAD
(inches) TESTED (days) (lbs. force)
5 1 4.50 04/20/1998 7 122420
5 2 4.50 04/20/1998 7 126230
Average
5 3 4.50 05/11/1998 28
5 4 4.50 05/11/1998 28
A(
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the wri
01AK Page 5 of 6
8901 Carpenter Frwy. Suite #100
Dallas, Texas 75247
Report Date
04/21/1998
-97
Business Center II
,~ Rd. & Lakeshore Dr.
Texas
ed field test and cast
BATCH TIME: 12:55 pm
lei Ratliff
DNCRETE: 79 F
TNO: 702314
:T WEIGHT (pc0: N/A
CUMULATIVE YARDS: 430
COMPRESSIVE
STRENGTH
(psi)
4330
4460
44OO
ttcn approval of HBC Engineering, Inc.
CONCRETE COMPR ' SIVE STRENGTH
Date of Service:
Client No.:
Client:
04/13/1998
52617000
Lincoln Property Company
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Report No.: 980959]
Project No.: 43-2452
Project: Coppell
Belt Lin
Coppell,
Services: Obtain samples of fresh concrete at the placement locations, perform requit
compressive strength samples.**
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PL~rr: 16 (on site)
SPECIFICATION REQUIREMENTS
STR~G~n: 4000 psi ~ 28 Days
5"
N/A
ASTM C- 143
ASTM C- 172
ASTM C-39
SAMPLE LOCATION: C.75-1.75
PROJECT DATA
CONCRETE CLASS: 9349
PLACEMENT DATE: 04/13/1998
TIME SAMPLED: 3:00pm By: £
WEATHER CONDITIONS: Clear, w
TEMPERATURE (F) - AIR 85 F C
TRUCK NO: 752 TICK[
AIR CONTENT (%): N/A uN
PLACEMENT LOCATION:
Sec page I
CYLINDER
MARKED
SET NO.
REPORT OF TESTS
MEASURED MAXIMUM
SLUMP DATE AGE LOAD
(inches) TESTED (days) (lbs. force)
6 1 04/20/1998 7 115160
6 2 04/20/1998 7 112880
Average
6 3 05/11/1998 28
6 4 05/11/1998 28
A(
Additional technician: Eddie Elrod 10:00 am to 3:30 pm
Technician: Del Ratliff
Report Distribution:
(!) Lincoln Property Company
(I) Butler Construction
(I) O'Brien & Associates
(I) AECC, Inc.
Started: 6:00 am
(1) City of Coppell/BIdg. Insp.
(I) City of Coppell/Constr. Insp.
Finished: 10:00 I'~
This report is exclusively for thc usc of thc client indicated above and shall not be reproduced except in full without thc ~n
8901 Carpenter Fa'wy. Suite #100
Dallas, Texas 75247
Report Date
04/21/1998
.97
Business Center II
~ Rd. & Lakeshore Dr.
Texas
ed field test and cast
BATCH TIME: 2:15 pm
~el Ratliff
lrm
i3NCRETE: 78 F
TNO.' 702321
:T WEIGht (pc0: N/A
CUMULATIVE YARDS: 500
COMPRESSIVE
STRENGTH
(psi)
4070
3990
4030
Engin~~l:~
~ugene~I~rbour
Vice President
tten approval of HBC Engineering, Inc.
01AK Page 6 of 6