Meadows Addn 4&5-CS 850121GINN, INC.
January 21, 1985
CONSULTING
Mr. Brian McDaniel
Lichliter-Jameson & Associates
1430 Empire Central, #230
Dallas, TX 75247
Meadows IV Subdivision
Coppell, Texas
Final Acceptance
Dear Mr. McDaniel:
On January 15, 1985, a final inspection was conducted on the
of the above refezenced .project by Mr. C. B. Rodgers (City
our inspector, Paul Lusk. On January 17, 1985, the final ins
for the utilities portion by the City of Coppell and our insp
The pavement and utilities have been completed in accordance
specifications and are hereby accepted by the City of Coppell
1985; which is the beginning date of the one-year warranty pe
It is our understanding that a one-year maintenance bond, as-
set of reproducibles have been submitted to the City.
Sincerely,
GINN, INC.
H. Wayne Ginn, P.E.
City Engineer
GF:HWG:Jc
cc:
Ron Ragland
Steve Goram
C. B. Rodgers
Paul Lusk
1613.5 Preston Road · Suite 106 · Dallas, Texas 75248 · Phone 214/31
'GINEERS
~avement portion
Coppell) and
~ection was made
~ctor.
with plans and
as of January 17,
riod.
,uilts and one
,-6611