Loading...
Northlake WE P1-6-CS 890801 ALBERT H. HALFF ASSOCIATES, INC. ENGINEERS · SCIENTISTS · SURVEYORS DALLAS · ARLINGTON · CHICAGO · FORT WORTH 8616 NORTHWEST PLAZA DRIVE · DALLAS. TEXAS 75225 214/739-0094 ~. R~se~ Doyle, P.E. Ci~ En~eer Ci~ of Coppe~ 255 P~ay Bo~ev~d Coppe~, Texas 75019 Re: No~e Woodlands ~sh DraYage Easement S~eys - Phase II De~ Russet: We are pleased to submit this proposal for drainage easement surveys in Northlake Woodlands East. This proposal accompanies a previous proposal for special hydraulic studies to evaluate existing flood plain and erosion problems. Tasks and estimated budgets for services included in this proposal are listed and discussed below. A. Drainage Easement Surveys $12,695 Input coordinate geometry for drainage easement from Northlake Woodlands East plats. Set vertical control by Global Positioning System. Traverse along drainage easement to recover existing property and easement comers. Set remaining drainage easement comers and lot line intersections as approximately shown on the accompanying exhibit. B. Flood Plain Exhibit $ 975 Prepare aerial photograph (1" = 100') with horizontal control on reproducible medium. Overlay drainage easement, 100 year flood plain and property lot lines on exhibit. The above tasks constitute the easement survey portion Phase II of the drainage project. In Phase I, solutions to drainage problems will be recommended. Phase II will consist of the detailed design effort, including design and easement location surveys required to develop construction documents for recommended solutions. Phase III will TRANSPORTATION · WATER RESOURCES · LAND DEVELOPMENT · MUNICIPAL · ENVIRONMENTAL · STRUCTURAL SURVEYING · GLOBAL POSITIONING SYSTEM (G.P.S.) · REMOTE SENSING AND MAPPING LANDSCAPE ARCHITECTURE · PLANNING lll ALBERT H. HALFF ASSOCIATES, INC. lll ENGINEERS · SCIENTISTS · SURVEYORS City of Coppell August 1, 1989 Page 2 consist of contract administration, inspection, and surveying assistance during the construction phase. Budgets for the design effort portion of Phase II and Phase III can be developed after completion of Phase I. The estimated not to exceed budget for the above Phase II easement survey and flood plain exhibit is $13,750. The work can be completed within one month after notice to proceed is received. Deliverable items include the drainage easement corners set in the field and the flood plain exhibit for staff and public presentation. As an alternative to Task B, Flood Plain Exhibit, the 100-year flood plain can be set on the ground. This will require surveyed cross sections at 100 foot intervals to locate exact 100-year flood plain elevations on the ground. The additional surveying required will add approximately $10,000 to the budget. However, the recommended procedure in Task B will provide a reproducible current (August 1989) aerial photograph with flood plain, easements, and lot boundaries. The aerial photograph will show locations of existing homes. Approximate flood plain limits can easily be located in the field by reference to drainage easement comers. Interested homeowners can perform this simple task themselves or contract with a private surveying company. Services will be billed monthly on a basis of 2.3 times salary cost of personnel involved in the project plus 1.10 times direct costs (printing, long distance telephone calls, and travel out of the metroplex area). The budget indicated for this project will not be exceeded without notification of and approval from the City of Coppell. The Phase II budget does not include the following services which can be provided, if necessary, on a basis of 2.3 times salary cost of personnel involved in the project and 1.10 times direct costs (printing, long distance telephone calls, and travel away from the Dallas/Fort Worth metroplex, but excluding transportation in the metroplex area) incurred: 1. Preparation of plans and specifications for construction 2. Expert witness testimony 3. Landscape architecture 4. Detailed surveys for design 5. Tree surveys and evaluations 6. Remote sensing 7. Sanitary sewer evaluation surveys ~~ ALBERT H. HALFF ASSOCIATES, INC. l/l ENGINEERS · SCIENTISTS · SURVEYORS City of Coppell August 1, 1989 Page 3 We trust that you will find this information satisfactory. We appreciate the opportunity to be of service to the City of Coppell. If this proposal meets with your approval, please sign and return one copy for our files. If we can furnish additional information, please do not hesitate to call. Yours very truly, ALBERT H. HALFF ASSOCIATES, INC. Walter E. Skipwith, P.E. /~,~ Attachments APPROVED: CITY OF COPPE! J~ Date: