Loading...
ST9604-AG 980609 AGENDA REQUES~ ZORM CITY COUNCIL MEETING: June 9, 1998 ITEM # 11/B ITEM CAPTION: ~ Consider approval of awarding Bid/Contract #Q-0498-03 for the construction of an At-Grade Rail Crossing and Traffic Signal on Fairway Drive at Belt Line Road to Rebcon, Inc. in the amount of APPROVED BY CITY . DATE ._. SUBMITTED : Kenneth M. Griffin STA STAFF COMMENTS: See attached memo. BUDGET AMT. $ AMT. EST. $ +/- BUD:$ FINANCIAL COMMENTS: Funds have been allocated in the Street Capital Projects fund for this project. · . ~,~ REVIEW~( CiTY MANAGER REVIEW: Agenda Request Form - Revised 3/98 Document Name: #engl MEMORANDUM FROM THE DEPARTMENT OF ENGINEERING To: Mayor and City Council From: Ken Griffin, P.E., Dir. of Engineering and Public Works V"7 RE: Consider approval of awarding Bid/Contract #Q-0498-03 for the construction of an At-Grade Rail Crossing and Traffic Signal on Fairway Drive at Belt Line Road to Rebcon, Inc. in the amount of $348,802.50; and authorizing the Mayor to sign. Date: June 9, 1998 On May 26, 1998, bids were received and opened for the construction of an At-Grade Railroad Crossing and Traffic Signal on Fairway Drive at Belt Line Road. Rebcon, Inc. was the only bidder on the project. A bid tabulation and engineer's estimate is attached for your review. The bid received is about 40% ($104,000) over the engineer's estimate. In conversations with Robert Bibby of Rebcon, Inc., he stated that the pricing is higher because of the small quanities. Because he was the only bidder, I have asked him to review his bid to determine if there are any areas where he can reduce the costs. If there are any cost savings I will present those at the Council Meeting. The time bid for the completion is 6 months. This is driven by the 5 month lead time for the mast arms and controller for the traffic light. The road itself should be in prior to that time. If that happens, we still should not allow traffic to use it until the traffic light is installed. To rebid the project will add 6-8 weeks to the start of the project. In order to keep this project moving forward, staff recommends awarding Bid #Q-0398-01 for the construction of the At-Grade Rail Crossing and Traffic Signal on Fairway Drive at Belt Line Road to Rebcon, Inc. in the amount of $348,802.50. Staff will be available to answer any questions at the Council meeting. "CITY OF COPPELL ENG1NEERING-EXCELI, ENCE B Y DESIGN" BID TABULATION AT-GRADE RAIL CROSSING AND TRAFFIC SIGNAL INSTALL ENGINEER'S Rebon, Inc. FAIRWAY DR. / BELT LINE RD. PROJECT ST 96-04 ESTIMATE 1868 W. NW Hwy Dallas, TX 75220 Cost Cost Cost Cost 1 Preparing Right-of-way 1 LS 5,000.00 5,000.00 34,000.00 34,000.00 2 Unclassif'~ed Street Excavation 140 CY 5.00 700.00 19.00 2,660.00 3 Borrow 10% shrinkage 2750 CY 10.00 27,500.00 15.00 41,250.00 4 Remove/Dispose Concrete Pavement 210 SY 7.00 1,470.00 10.00 2,100.00 5 6" 650 PSI Flex/7 day Reinf Cone Pvmt 520 SY 30.00 15,600.00 69.00 35,880.00 6 6" 650 PSI Flex/7 day Integral Cone Curb 273 LF 1.50 409.50 2.00 546.00 7 Reinf Cone St. Header 650 PSI Flex/7 day 37 LF 10.00 370.00 9.00 333.00 8 Reinf Cone RR Header 650 PSI Flex/7 day 74 LF 20.00 1,480.00 15.00 1,110.00 9 6' Thick Compact Lime Stab. Subgrade 725 SY 2.00 1,450.00 7.00 5,075.00 .. 10 Hydrated Lime 301bs/SY min 11 TON 100.00 1,100.00 98.00 1,078.00 11 4' Thick 3000 PSI Comp Rein Cone SW 830 SF 3.00 2,490.00 4.00 3,320.00 12 Uni-decor Pave Stone on Sand incld Pavement 620 SF 6.00 3,720.00 9.00 5,580.00 13 Holland Stone I Pave Stone on Sand 2 Course 34 LF 8.00 272.00 20.00 680.00 14 650 PSI Flex/7 day Rein Cone Monolit Median 21 SY 50.00 1,050.00 90.00 1,890.00 15 6' Thick Topsoil 375 CY 5.00 1,875.00, 35.00 13,125.00 16 Hydromulch Bermuda Grass 1750 SY 1.00 1,750.001 3.00 5,250.00' 17 Solid Sod Buffalo Grass 140 SY 3.50 490.00; 5.00 700.00 18 4' Lane Stripe - white 72 LF 1.130 72.00~ 2.00 144.00 19 8' Lane Stripe - yellow 104 LF 2.00 208.00 3.40 353.60 20 18" wide Stop Line - white 115 LF 8.00 920.000' 7.00 805.00 21 24' wide Stop Line - white 36 LF 10.00 360.00 8.00 288.00 22 Advisory Marker - Turn Arrow & "ONLY" 1 EA 300.00 300.00 500.00 500.00 23 Advisory Marker - Straight &Turn Arrow 1 EA 300.00 300.00 400.00 400.00 ) 24 Advisory Marker - "R-X-R" 2 EA 300.00 600.00 500.00 1,000.00 25 Metal Beam Guard Fence RR Signal Protect 2 EA 750.00 1,500.00 1,700.00 3,400.00 26 Pre-Cast Reinforced Concrete RR Crossing 63 LF 250.00 15,750.00 300.00 18,900.00 27 Railroad Track Work 1 LS 25,000.00 25,000.00 35,000.00 35,000.00 28 Erosion Control 1 LS 2,000.00 2,000.00 5,000.00 5,000.00 29 1' PVC Sch. 40 Conduit/Trenched 172 LF 3.00 516.00 2.50 430.00 30 2" PVC Sch. 40 Conduit/Trenched 3649 LF 4.00 14,596.00 3.40 12,406.60 31 3" PVC Sch. 40 Conduit/Trenched 387 LF 5.50 2,128.50 5.30 2,051.10 32 3" PVC Sch. 40 Conduit/Bored 204 LF 17.00 3,468.00 17.00 3,468.00 33 4' PVC Sch. 40 Conduit/Trenched 18 LF 6.50 117.00 10.00 180.00 34 Electrical Condtr. #8 XHHW 465 LF 1.20 558.00 .60 279.00 35 Solid Copper - 12 Condtr #18 AWG 2809 LF 2.00 5,618.00 1.50 4,213.50 36 Signal Cable 16-Condtr #12 AWG 526 LF 2.50 1,315.00 4.00 2,104.00 , Continue Next Page BID TABULATION AT-GRADE RAIL CROSSING AND TRAFFIC SIGNAL INSTALL ENGINEER'S Rebcon, Inc. FAIRWAY DR. / BELT LINE RD. PROJECT ST 96-04 ESTIMATE 1868 W. NW Hwy Dallas, TX 75220 37 No. 14 Detector Loop Lead in 7,725 LF 1.00 7,725.00 .60 4,635.00 38 Signal Cable - 5 Condtr #16 AWG 468 LF 1.20 561.60 1.20 561.60 39 Signal Cable - 7 Condtr #16 AWG 234 LF 1.50 351.00 1.70 397.80 n 40 3 Condtr #6 Power 209 LF 2.00 418.00 2.00 418.00 41 Optloom Cable - 3 Condtr #20 AWG 673 LF 1.25 841.25 1.30 874.90 42 3M Opticom Detector 4 EA 650.00 2,600.000 700.00 2,800.00 43 Interconnect - 2 Condtr #14 AWG 194 LF 2.00 388.00 1.10 213.40 44 Loop Detector Installation (Sawcut & Wired) 1,820 LF 6.00 10,920.00 4.50 8,190.00 45 Digital Loop Detector Vehicle Det 2 Channel 7 EA 500.00 3,500.00 200,00 1,400.00 46 820A Multisoncic 8-Phase NEMA Controller 1 EA 15,000.00 15,000.00 24,000.00 24,000.00 47 Foundation Type (30-B) including casing 13 LF 100.00 1,300.00 84.00 1,092.00 48 Foundation Type (36-A) including casing 45 LF 100.00 4,500.00 100.00 4,500.00 49 Controller Foundation 2 CY 800.00 1,600.00 400.00 800.00; 50 Signal Pole w/30' mast ann 1 EA 4,200.00 4,200.00 3,000.00 3,000.00l 51 Signal Pole w/36' mast arm 1 EA 4,400.00 4,400.00 3,200.00 3,200.00i 52 Signal Pole w/44' mast arm 2 EA 5,200.00 10,400.00 4,000.00 8,000.00 53 12" Traffic Signal Head 50 EA 250.00 12,500.00 200.00 10,000.00 54 Traffic Signal - 3 Section Head Backplate 10 EA 50.00 500.00 60.00 600.00 55 Traffic Signal - 5 Section Head Backplate 4 EA 60.00 240.00 80.00 320.00 56 Pedestrian Signal Assembly 2 Indication 8 EA 350.00 2,800.00 600.00 4,800.00~ 57 PED Push Button 8 EA 125.00 1,000.00 130.00 1,040.00I 58 Service Meter Installation 1 EA 1,200.00 1,200.00 2,000.00 2,000.00 59 Type A Ground Pull Box 15 EA 350.00 5,250.00 500.00 7,500.00i 60 Type C Ground Pull Box 1 EA 400.00 400.00 500.00 500.00 61 Intersection Display Board 1 EA 1,000.00 1,000.00 900.00 900.00 62 Traffic Sign W10-1, Pole &Cone. Found. 4 EA 350.00 1,400.00 400.00 1,600.00 63 Traffic Sign W3-3, Pole &Conc. Found. 2 EA 350.00 700.00 400.00 800.00 64 Traffic Sign W10-2L, Pole &Conc. Found. 1 EA 350.00 350.00 400.00 400.00 65 Traffic Sign W10-2R, Pole & Cone. Found. 1 EA 350.00 350.00 400.00 400.00 66 Traffic Sign R10-12 4 EA 120.00 480.00 100.00 400.00 67 Traffic Sign R10-4bR 4 EA 120.00 480.00 20.00 80.00 68 Traffic Sign R10-4bL 4 EA 120.00 480.00 20.00 80.00 69 Traffic Sign R3-8LR 1 EA 120.00 120.00 200.00 200.00 70 Street Name Signs on Mast Ann 4 EA 250.00 1,000.00 400.00 1,600.00 71 Barrel Mounted Barricade 50 LF 20.00 1,000.00 20.00 1,000.00 72 Upload / Download Device 1 EA 2,500.00 2,500.00 5,000.00 5,000.00 PROJECT TOTAL 244,507.85 348,802.50