Northlake 635(3)-LR 980423CONCRETE COMPi /SSIVE STRENGTH TE:ST
Date of Service:
Client No.:
Client:
Services:
03/25/1998
Report No.: 980811
52617000
Project No.: 43-245:
Lincoln Property Company
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Project: Coppel
Belt Li~
Coppel
Obtain samples of fresh concrete at the placement locations, perform requi
compressive strength samples.**
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 29
SPECIFICATION REQUIREMENTS
STRENGTH: 3500 psi ~ 28 Days
5"
N/A
ASTM C-143
ASTM C- 172
ASTM C-39
PROJECT DATA
CONCRETE CLASS: 9337
PLACEMENT DATE: 03/25/1998
TIME SAMPLED: 3105 pm BY:
WEATHER CONDITIONS: Clear,
TEMPERATURE (F) - AIR 76 V ~
TRUCK NO: 879 TICK
AIR CONTENT (%): N/A ur
PLACEMENT LOCATION:
Piers, Building D
SAMPLE LOCATION: I I-E.6, 1 l-F, I I-F.4
CYLINDER MEASURED
MARKED SLUMP
SET NO. (inches)
1 I 6.00
I 2 6.00
1 3 6.00
1 4 6.00
Technician time
DATE
TESTED
04/01 / 1998
04/0 I/1998
04/22/1998
04/22/1998
on report 9808117.
REPORT OF TESTS
MAXIMUM
AGE LOAD
(days) (lbs. force)
7 115010
7 110540
Average
28 141590
28 144830
Average
A~
Technician: Brian Otis
Report Distribution:
(I) Lincoln Property Company
(1) Butler Construction
(I) O'Brien & Associates
(I) AECC, Inc.
Started: Finished: I"B
(I) City ofCoppell/BIdg. Insp.
(l) City ofCoppell/Constr. Insp.
This report is exclusively for thc usc of thc client indicated above and shall not bc reproduced except in full without thc w
01AK Page ! of !
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
8
~.-97
Report Date
04/23/1998
Business Center II
,e Rd. & Lakeshore Dr.
Texas
ed field test and cast
BATCH TIME: 1:53 pm
3rian Otis
cry windy
;ONCRETE:. 80 F
~.T NO: 651205
!IT WEIGHT (pc0: N/A
.'CUMULATIVE YARDS:
COMPRESSIVE
STRENGTH
(psi)
4070
3910
3990
5010
5120
5070
10
FRACTURE
TYPE
-~ En~c.
Eugene Harbour
Vice President
ittcn approval of HBC Engineering, Inc.
CONCRETE COMPK"]' SSIVE STRENGTH TE; T
03/25/1998 Report No.: 980809
Date of Service:
Client No.:
Client:
Services:
52617000 Project No.: 43-245~
Lincoln Property Company
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Project:
Obtain samples of fresh concrete at the placement locations, perform requi
compressive strength samples.**
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 27
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi ~ 28 Days
3-6%
ASTM C- 143
ASTM C- 172
ASTM Co39
SLUMP:
AIR:
TEST METHOD:
SAMPLE LOCATION: 4.5, 1.5
CYLINDER MEASURED
MARKED SLUMP DATE
SET NO. (inches) TESTED
.97
1 I 5.00 04/01/1998
I 2 5.00 04/01/1998
I 3 5.00 04/22/1998
I 4 5.00 04/22/1998
PROJECT DATA
CONCRETE CLASS: 3349
PLACEMENT DATE: 03/25/1998
TIME SAMPLED: 4:15 am BY:
WEATHER CONDITIONS: Partly
TEMPERATURE (F) - AIR
TRUCK NO: N/A
AIR CONTENT (%): N/A
PLACEMENT LOCATION:
Building C slab, I-Q, 3-5
REPORT OF TESTS
MAXIMUM
AGE LOAD
(days) (lbs. force)
7 108640
7 113650
Average
28 125690
28 123140
Avera~le
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
04/23/1998
Coppell Business Center II
Belt Lil te Rd. & Lakeshore Dr.
Coppell Texas
ed field test and east
BATCH TIME: N/A
;ddie Eirod
)udy, cool
64 l* CONCRETE: 70 F
TIC~ Y NO: N/A
UN
T WEIGHT (pcO: N/A
CUMULATIVE YARDS:
~OMPRESSIVE
STRENGTH
3840
4020
3930
4440
4350
4400
AC
This report is exclusively for the use of the client iudicated above aud shall not bc reproduced except in full without the writl
10
FRACTURE
TYPE
=n approval of HBC Engineering, Inc.
01AK Page I of 5
COlqlCRETE COMPI SSIVE STRENGTH TEST
Date of Service:
Client No.:
Client:
Services:
03/25/! 998
Report No.: 98080
52617000
Project No.: 43-24
Lincoln Property Company
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Project: Coppel
Belt Li~
Coppel
Obtain samples of fresh concrete at the placement locations, perform requi
compressive strength samples.**
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
Pt,nm': 27
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi ~ 28 Days
5"
3-6%
ASTM C-143
ASTM C- 172
ASTM C-39
PROJECT DATA
CONCRETE CLASS: 3349
PLACEMENT DATE: 03/25/1998
TIME SAMPLED: 6:45 am BY:
WEATHER CONDITIONS: Partly
TEMPERATURE (F) - AIR 64 F
TRUCK NO: 749 TICK
AIR CONTENT (%): N/A ur
PLACEMENT LOCATION:
See page I
SAMPLE LOCATION: 4.K
CYLINDER MEASURED
MARKED SLUMP DATE
SET NO. (inches) TESTED
2 I 5.00 04/01/1998
2 2 5.00 04/01/1998
2 3 5.00 04/22/1998
2 4 5.00 04/22/19911
REPORT OF TESTS
MAXIMUM
AGE LOAD
(days) (lbs. force)
7 119110
7 116760
Average
28 135340
211 137250
Average
Al
This report is cxclusively for thc usc of thc clicnt indicated abovc and shall not be reproduced except in full without thc a
01AK Page 2 of 5
8901 Carpenter Frwy. Suite #100
Dallas, Texas 7S247
5
>.-97
Report Date
04/23/1998
Business Center II
e Rd. & Lakeshore Dr.
Texas
ed field test and cast
BATCH TIME: N/A
~ddie Elrod
Ioudy, cool
:ONCRETE: 68 F
ET NO: 664670
xr WEm~IT (pc0: N/A
;CUMULATIVE YARDS: 260
COMPRESSIVE
STRENGTH
(psi)
4210
4130
4170
4790
4850
4820
tten approval of HBC Engineering, Inc.
O~AK
CONCRETE COMPRESSIVE STRENGTH TEST
Date of Service: 03/25/1998
Client No.: 52617000
Report No.: 980809
Project No.: 43-245; -97
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
04/23/1998
Client:
Services:
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR:
CONCRETE SUPPLI ER:
PLANT:
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi ~ 28 Days
5"
3-6%
ASTM C-143
ASTM C- 172
ASTM C-39
SAMPLE LOCATION:
Lincoln Property Company Project: Coppell
3300 Lincoln Plaza/Larry Moon Belt Lit
500 North Akard Street
Dallas TX 75201-3394 Coppell
Obtain samples of fresh concrete at the placement locations, perform requi
compressive strength samples.**
PROJECT DATA
Butler Construction CONCRETE CLASS: 3349
Pioneer Concrete PLACEMENT DATE: 03/25/1998
27 TIME SAMPLED: 8.'00 am BY:
WEATHER CONDITIONS: Partly
TEMPERATURE (F) - AIR 66 F c ONCRETE: 70 F
TRUCKNO: 749 TICKI,'r NO: 664685
AIR CONTENT (%): N/A UN
PLACEMENT LOCATION:
See page 1
4.7, M
REPORT OF TESTS AC
MAXIMUM
CYLINDER MEASURED
MARKED SLUMP DATE AGE LOAD
SET NO. (inches) TESTED (days) (lbs. force)
3 I 7.00 04/01/1998 7 100060
3 2 7.00 04/01/1998 7 101490
Average
3 3 7.00 04/22/1998 28 131870
3 4 7.00 04/22/1998 28 136600
Average
This report is exclusively for thc use of thc client indicated above and shall not be reproduced except in full without the wri
Page 3 of 5
Business Center II
e Rd. & Lakeshore Dr.
Texas
ed field test and east
FRACTURE
TYPE
BATCH TIME: N/A
;ddie EIrod
oudy, cool
.~cn approval ofHBC Enginccring, Inc.
'CUMULATIVE YARDS: 360
COMPRESSIVE
STRENGTH
(psi)
3540
3590
3570
4660
4830
4750
IT WEIGHT (pc0: N/A
O CRETE COMPRv_;SSIVE STRENGTH TEST
Date of Service:
Client No.:
Client:
Services:
03/25/I 998
Report No.: 98080
52617000
Project No.: 43-24
Lincoln Property Company
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Project: Coppel
Belt Li~
Coppel
Obtain samples of fresh concrete at the placement locations, perform requi
compressive strength samples.**
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 27
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi (~ 28 Days
5"
3-6%
ASTM C- ! 43
ASTM C- 172
ASTM C-39
SAMPLE LOCATION:
4.5, N.2
PROJECT DATA
CONCRETE CLASS: 3349
PLACEMENT DATE: 03/25/1998
TIME SAMPLED: 9:45 am BY:
WEATHER CONDITIONS: Partly
TEMPERATURE (F) - AIR 70 F
TRUCK NO: 803 TICK
AIR CONTENT (%): N/A ur
PLACEMENT LOCATION:
See page I
CYLINDER MEASURED
MARKED SLUMP DATE
SET NO. (inche~) TESTED
4 1 5.25 04/01/1998
4 2 5.25 04/01 / 1998
4 3 5.25 04/22/1998
4 4 5.25 04/22/1998
REPORT OF TESTS
MAXIMUM
AGE LOAD
(days) (lbs. force)
7 114100
7 112510
Average
28 129690
28 129990
Average
This report is exclusively for thc usc of the client iudicatcd above and shall not be reproduced except in full without thc ~
01AK Page 4 of 5
8901 Carpenter Frvry. Suite #I00
Dallas, Texas 75247
5 Report Date
04/23/1998
).-97
Business Center II
~e Rd. & Lakeshore Dr.
Texas
ed field test and cast
BATCHTIME: 9:07 am
]ddie EIrod
loudy, cool
:ONCRETE: 72 F
~T NO: 664701
IT WEIGHT (pcf): N/A
;CUMULATIVE YARDS: 450
COMPRESSIVE
STRENGTH
(psi)
4030
3980
4010
4590
4600
4600
FRACTURE
TYPE
ttcn approval of HBC Engineedng, Inc.
Oi CRETE COMPtc SSIVE STRENGTH TEST
Date of Service: 03/25/1998 Report No.:
Client No.: 52617000 Project No.:
980809
43-245'~
5
~-97
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
04/23/1998
Client:
Services:
Lincoln Property Company
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Project:
Coppel
Belt Li~
Coppei
Obtain samples of fresh concrete at the placement locations, perform requi
compressive strength samples.**
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 27
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi (~ 28 Days
SLUMP: 5"
PROJECT DATA
CONCRETE CLASS: 3349
PLACEMENT DATE: 03/25/199:
T[MESAMPLED: 11:I0 am BY:
WEATHER CONDITIONS: Partly
TEMPERATURE (F) - AIR 72 F
TRUCK NO: 549 T~Cm
Business Center II
ne Rd. & Lakeshore Dr.
Texas
field test and east
BATCHTIME: 10:10 am
:.ddie EIrod
oudy, cool
'ONCRETE: 80 F
rrno: 651168
AIR: 3-6%
TEST METHOD: ASTM C- 143
ASTM C- 172
ASTM C-39
SAMPLE LOCATION: 4, 0.5
CYLINDER MEASURED
MARKED SLUMP
SET NO. (inches)
5 1 5.00
5 2 5.00
5.00
5.00
5 3
5 4
Technician: Eddie Elrod
Report Distribution:
(I) Lincoln Property Company
(1) Butlcr Construction
(1) O'Bricn & Associates
(I) AECC, Inc.
DATE
TESTED
AIR CONTENT (%): N/A
PLACEMENT LOCATION:
Sec page I
REPORT OF TESTS
MAXIMUM
AGE LOAD
(days) (Iba. force)
04/01/1998
04/01/i 998
04/22/I 998
04/22/1998
7 129760
7 123260
Average
28 166390
28 167330
Average
Started: 3:00 am
(I) City of Coppell/BIdg. Insp.
(I) City ofCoppell/Constr. Insp.
Finished: 1:00 pm I-~
This report is cxclusivcly for thc use of thc client indicated above and shall not bc reproduced except in full without thc wr
UN
A(
rrwzioHT (p~0: N/A
CUMULATIVE YARDS: 500
COMPRESSIVE
STRENGTH
(p~i)
4590
4360
4480
5880
5920
5900
FRACTURE
TYPE
Enginee~
',ugene HarBo~r
Vice President
Ion approval of HBC Engineering, Inc.
01AK Page 5 of 5
CONCRETE COMPK.,;SSIVE STRENGTH TE;ST
Date of Service:
Client No.:
Client:
04/15/1998
52617000
Lincoln Property Colnpany
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Report No.: 98097!
Project No.: 43-245
Project: Coppe
Belt Li
Coppe
Services: Obtain samples of fresh concrete at tile placement locations, perform requ
compressive strength samples.**
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 16
SPECIFICATION REQUIREMENTS
STRENGTH: 3500 psi (~ 28 Days
5"
N/A
ASTM C- 143
ASTM C- 172
ASTM C-39
SAMPLE LOCATION:
Panel l06
PROJECT DATA
CONCRETE CLASS: 9337
PLACEMENT DATE: 04/15/1991
TIME SAMPLED: 9:40 am BY:
WEATHER CONDITIONS: Partly
TEMPERATURE (F) - AIR 80 .F
TRUCK NO: 515 TICI~
AIR CONTENT (%): N/A
PLACEMENT LOCATION:
Building C, Panels 103-I 16
CYLINDER
MARKED
SET NO.
REPORT OF TESTS
MEASURED MAXIMUM
SLUMP DATE AGE LOAD
(inches) TESTED (days) (lbs. force)
I I 5.00 04/22/1998 7 103850
I 2 5.00 04/22/1998 7 97310
Average
I 3 5.00 05/13/1998 28
I 4 5.00 05/13/1998 28
This report is exclusively tbr the usc of the client indicated above and shall uot be reproduced except in full without thc w
01AK Page ! of 2
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
04/23/1998
2-97
Business Center II
te Rd. & Lakeshore Dr.
I, Texas
ired field test and cast
BATCH TIME: 9:16 am
Eddie Elrod
ioudy, cool
UONCRETE: 79 ~'
.ET NO: 702407
qiT WEIGHT (pc0: N/A
CCUMULATIVE YARDS: 70
COMPRESSIVE
STRENGTH
(psi)
3670
3440
3560
FRACTURE
TYPE
· itten approval ofHBC Engincedng, Inc.
CONCRETE COMPI 'SSIVE STRENGTH TEST
Date of Service: 04/i 5/1998 Report No.:
Client No.: 52617000 Project No.:
Client: Lincoln Property Company Project:
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Services:
980979
43-245:
Coppell
Belt Li~
Coppell
Obtain samples of fresh concrete at the placement locations, perform requi
compressive strength samples.**
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 16
SPECIFICATION REQUIREMENTS
STRENGTH: 3500 psi ~ 28 Days
5"
N/A
ASTM C- 143
ASTM C-172
ASTM C-39
PROJECT DATA
CONCRETE CLASS: 9337
PLACEMENT DATE: 04/15/1991
TIME SAMPLED: 10:20 am BY:
WEATHER CONDITIONS: Partly
TEMPERATURE (F) - AIR 80 F
TRUCK NO: 514 TICKI
AIR CONTENT (%}: N/A u~
PLACEMENT LOCATION:
See page I
SAMPLE LOCATION: Panel I I 1
CYLINDER MEASURED
MARKED SLUMP
SET NO. (inches)
2 1 6.50
2 2 6.50
2 3 6.50
2 4 6.50
REPORT OF TESTS
MAXIMUM
DATE AGE LOAD
TESTED (~lays) (lbs. force)
04/22/1998 7 83300
04/22/1998 7 76950
Average
05/13/1998 28
05/13/1998 28
A(
Technician: Eddie Elrod
Report Distribution:
(!) Lincoln Property Company
(I) Butler Construction
(I) O'Brien & Associates
(I) AECC, Inc.
Started: 6:00 am Finished: 12:00 ~
(I} City ofCoppell/BIdg. Insp.
(I) City of Coppell/Constr. Insp.
This report is exclusively for thc usc of thc client indicated above and shall not be reproduced ex.pt in full without th~
.97
8901 Carpenter Frwy., Suite #100
Dallas, Texas 7S247
Report Date
04/23/1998
Business Center II
~e Rd. & Lakeshore Dr.
Texas
'ed field test and cast
BATCH TIME: 10:08 am
Mdie Elrod
oudy, cool
'ONCRETE: 78 F
.-r NO: 702414
rr WEIGHT (peO: N/A
CUMULATIVE YARDS: 140
COMPRE~IVE
STRENGTH
(p~i)
2950
2720
2840
FRACTURE
TYPE
· , Inc.
:~ugene Harbour
Vice President
ten approval of HBC Engineering, Inc.
01AK Page 2 of 2